Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-AOC GORAKHPUR | UTTAR PRADESH | 273001 | ₹4.4 Cr | L1 | Accepted-AOC AS PER UPLOADED |
| 2 | L2₹4.5 CrRejected-Finance KH NO 17 B H U NO 74A KAUSHALPURI COLONY KHARGAPUR GOMTINAGAR LUCKNOW U P | ₹4.5 Cr | L2 | Rejected-Finance AS PER UPLOADED |
| 3 | L3₹4.5 CrRejected-Finance | ₹4.5 Cr | L3 | Rejected-Finance AS PER UPLOADED |
| 4 | Rejected-Technical GRAM KHEMPIPRA POST SAVAREJI THANA KOTWALI JANPAD MAHARAJGANJ UTTAR PRADESH | MAHARAJGANJ | MAHARAJGANJ | UTTAR PRADESH | - | - | Rejected-Technical AS PER TECHNICAL EVALUATION |
| 5 | Rejected-Technical | - | - | Rejected-Technical AS PER TECHNICAL EVALUATION |
| Sl No | Description | Qty | Unit | M/s Narayan Enterprises L2 | M/s VIJENDRA PRATAP SINGH L1 | M/s Asha Colonizers and Contractors Private Limited L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of Brick Work with lime/cement mortar and its proper disposal including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 596.27 | Cum | 330 ₹1,96,769.1 | 400 ₹2,38,508 | 350 ₹2,08,694.5 |
| 2.00 | Dismantling of Reinforced Cement Concrete work and its proper disposal including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 142.2 | Cum | 370 ₹52,614 | 500 ₹71,100 | 430 ₹61,146 |
| 3.00 | Dismantling / Demolishing of Cement Concrete manually / by mechanical means including disposal, cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 139.09 | Cum | 350 ₹48,681.5 | 400 ₹55,636 | 380 ₹52,854.2 |
| 4.00 | Earth work in excavation including digging and refilling the trenches with all lead & lift including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 5,734.91 | Cum | 45 ₹2,58,070.95 | 60 ₹3,44,094.6 | 60 ₹3,44,094.6 |
| 5.00 | Plain Cement Concrete in M15 Grade with Cement, Coarse Sand & crushed stone grite including cost of all materials, labour and T&P with proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specifications. | 483.95 | Cum | 8,150 ₹39,44,192.5 | 8,200 ₹39,68,390 | 8,700 ₹42,10,365 |
| 6.00 | Reinforced cement concrete in M25 Grade with Cement, Coarse sand, Crushed Stone Aggregate, Mechanically mixed, properly compacted and placed in proper position including cost of all materials (but excluding cost of steel), including labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. | 1,973.24 | Cum | 9,650 ₹1,90,41,766 | 9,600 ₹1,89,43,104 | 9,600 ₹1,89,43,104 |
| 7.00 | Providing and laying Steel as Reinforcement including cost of steel carriage, bending, cutting, placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. | 152.62 | MT | 75,000 ₹1,14,46,500 | 68,000 ₹1,03,78,160 | 71,000 ₹1,08,36,020 |
| 8.00 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. | 4,805.31 | Sqm | 600 ₹28,83,186 | 650 ₹31,23,451.5 | 630 ₹30,27,345.3 |
| 9.00 | Earth work in filling for making diversion road, approach road and correction of bank etc with all lead & lift including cost of labour and T&P with proper completion of work as directed by Engineer in charge and as per ID specification. | 886.55 | Cum | 90 ₹79,789.5 | 60 ₹53,193 | 135 ₹1,19,684.25 |
| 10.00 | Laying dismantled Brick for using at approach below soling work including cost of all material (but excluding cost of dismantled brick ballast) & including cost of labour and T&P with proper completion of work as directed by Engineer-in-charge and as per I.D. specifications. | 369.52 | Cum | 98 ₹36,212.96 | 100 ₹36,952 | 153 ₹56,536.56 |
Tender Value
Refer Docs
EMD Value
₹11.7 L
Closing Date
13 Feb 2026, 1:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE-1, GORAKHPUR
Reconstruction of 12 Nos Damaged VRB Located on Maharajganj Rajwaha in Districts Maharajganj and Gorakhpur.
2026_UPIDC_1109463_7
11/SE/2025-26
Open Tender
Civil Works
365 days
MAHARAJGANJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹11.7 L
Yes
27 Mar 2026
30 Jan 2026
13 Feb 2026
30 Jan 2026
13 Feb 2026
30 Jan 2026
Dismantling of Brick Work with lime/cement mortar and its proper disposal including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Dismantling of Reinforced Cement Concrete work and its proper disposal including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Dismantling / Demolishing of Cement Concrete manually / by mechanical means including disposal, cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Earth work in excavation including digging and refilling the trenches with all lead & lift including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Plain Cement Concrete in M15 Grade with Cement, Coarse Sand & crushed stone grite including cost of all materials, labour and T&P with proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specifications.
Reinforced cement concrete in M25 Grade with Cement, Coarse sand, Crushed Stone Aggregate, Mechanically mixed, properly compacted and placed in proper position including cost of all materials (but excluding cost of steel), including labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications.
Providing and laying Steel as Reinforcement including cost of steel carriage, bending, cutting, placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications.
Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications.
Earth work in filling for making diversion road, approach road and correction of bank etc with all lead & lift including cost of labour and T&P with proper completion of work as directed by Engineer in charge and as per ID specification.
Laying dismantled Brick for using at approach below soling work including cost of all material (but excluding cost of dismantled brick ballast) & including cost of labour and T&P with proper completion of work as directed by Engineer-in-charge and as per I.D. specifications.
Brick on edge soling with 1st class brick including preparation of sub-grade to prescribed camber, filling joint with Local sand / Silt including cost of material, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Supplying and Fixing PVC Pipe of 90 mm dia of approved quality and make using at slab including cost of pipe, other material, labour, T&P etc. required for complete work as directed by Engineer-in-Charge and as per drawing and I.D. specifications.
Boring with 150 mm diameter casing pipe including lowering and extraction of assembly, loading, unloading and carriage including cost of all materials, labour and T&P etc. required for complete work as directed by Engineer-in-Charge as per I.D. specifications.
Running of 5 H.P. generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of all materials, labour and T&P etc.for complete work as directed by Engineer-in-Charge as per I.D.specifications.
Finishing wall with acrylic smooth exterior paint of required shade including cost of all materials, labour and T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Supplying and laying Geo textile (sheet) 200 gsm thick including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specifications.
Painting/Printing letter upto 15cm height including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Supplying and laying of Joint Filler Board including cost of all materials, labour and T&P etc. for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications.
Supplying and pitching Mirzapur stone boulders on slope with all lead & lift including labour, T&P etc. required for proper completion of work as directed by Engineer-in-Charge as per drawings and I.D. specifications.
Providing & Laying LDPE Sheet including cost of all materials, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge as per I.D. specifications.
Centering and shuttering for Plain Cement Concrete work in foundation including cost of all materials, labour and T&P etc with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications.
Plain Cement Concrete in 1:3:6 in foundation with Cement, Coarse Sand & brick ballast including cost of all materials, labour and T&P with proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specifications.
Making and Fixing of Wheel Guard Stone including cost of all materials, Labours & T&P etc for proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specifications.
Laying dismantled CC/RCC for using at diversion work including cost of all material (but excluding cost of dismantled CC/RCC material) & including cost of labour and T&P with proper completion of work as directed by Engineer-in-charge and as per I.D. specifications.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.25 MB
BID07.pdf
Tender Documents • 2.37 MB
BOQ_2051647.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid