Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-Finance | L1 | Accepted-Finance Less | |
| 2 | L2₹11.6 L+₹1,541.61 (0.13%)Accepted-Finance | L2 | Accepted-Finance More |
Tender Value
₹11.7 L
EMD Value
₹12,000
Closing Date
5 Dec 2022, 3:00 pmClosed
Block Development Officer (VP)
Block Development Office Hosur
Krishnagiri District Hosur Block under AGAMT 2022_23 2_works_ Construction of Kitchen shed PUPS Type_1 in Nandhimangalam Panchayat Package No TN HSR 003
2022_RDTN_267249_1
Roc5114_2022_R10_12_10_22
Open Tender
Civil Works - Others
Item Rate
180 days
Hosur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,000
Block Development Office Hosur
23 Dec 2022
24 Nov 2022
5 Dec 2022
24 Nov 2022
5 Dec 2022
24 Nov 2022
28 Nov 2022
Amount
1.Construction of kitchen shed at Perumalpalli PUPS (Type I)-Rs.5.86 lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS20B
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc., for column
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,for Roof slab
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc., for sunshade
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and
Special ceiling platering and Finishing the exposed surface of RCC item of work such as slabs beams, sunshade, facia, canopy slab, staircase waist slab etc., with CM 1:3, 10mm thick. etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Providing the following thickness of Granolothic pattern floor finishing with plain cement concrete cc 1:2: 4 using 10 mm to 12 mm size hard broken stone jelly and the top rubbed smooth etc complete complying with standard specification
Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required dses
Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc comoplete.
Distembering two coats including priming coat with best approved distember and primer including costand conveyance of all materials to site and all labour charges etc
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two Coats over New iron Works using best quality of enamel paint including cost and conveyance of materials and labour charges etc complete. - 10.00 Sqm.
Supply and Cost of Steel door , Window, Ventilator
Door of size 0.90x2.10m
Window of size 1.20x1.30m
Ventilator 0.90x0.45m
Supply and fixing of following thickness(25mm) of cuddapah slab including all cost
Supplying and fixing PVC Rain water down fall pipes of following dia meter etc., complete.
Towards Fixing of steel door along with frames in position including cost and conveyace of allmaterials to site complete
Towards Fixing of steel windows & ventilators in position including cost and conveyace of allmaterials to site complete
Provision for Electrification arrangements
Light & Fan Point SD.no.20
Supply&Fixing of Tube Light SD.no.88
CFL SD.no.80
BHF with CFL SD.no.83
Supply & Fixing of Fan SD.no.110
Plug Point SD.no.36
Power Plug Point SD.no.39
S & Fixing DP Main swetch SD.no.142
S & FixingTNEB Meter board SD.no.125
Service pipe SD.no.73
Service Connection SD.no.68
Service Charge to EB
exhaust fan SD114 (including holes)
Provision of Water Supply arangment
200 Ltr Tank
50mm PVC Pipe
50mm PVC Bend
25mm PVC Pipe
25mm PVC Elbow
25mm PVC Tee
Brass chromium plated screw down tap 15/12mm
Provision towards construction of Rain water structure
Provision towards charges for writing name board
2.Construction of kitchen shed at Karnapalli PUPS (Type I)-Rs.5.86 lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete SS20B
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc., for column
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,for Roof slab
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc., for sunshade
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and
Special ceiling platering and Finishing the exposed surface of RCC item of work such as slabs beams, sunshade, facia, canopy slab, staircase waist slab etc., with CM 1:3, 10mm thick. etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Providing the following thickness of Granolothic pattern floor finishing with plain cement concrete cc 1:2: 4 using 10 mm to 12 mm size hard broken stone jelly and the top rubbed smooth etc complete complying with standard specification
Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required dses
Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc comoplete.
Distembering two coats including priming coat with best approved distember and primer including costand conveyance of all materials to site and all labour charges etc
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting two Coats over New iron Works using best quality of enamel paint including cost and conveyance of materials and labour charges etc complete. - 10.00 Sqm.
Supply and Cost of Steel door , Window, Ventilator
Door of size 0.90x2.10m
Window of size 1.20x1.30m
Ventilator 0.90x0.45m
Supply and fixing of following thickness(25mm) of cuddapah slab including all cost
Supplying and fixing PVC Rain water down fall pipes of following dia meter etc., complete.
Towards Fixing of steel door along with frames in position including cost and conveyace of allmaterials to site complete
Towards Fixing of steel windows & ventilators in position including cost and conveyace of allmaterials to site complete
Provision for Electrification arrangements
Light & Fan Point SD.no.20
Supply&Fixing of Tube Light SD.no.88
CFL SD.no.80
BHF with CFL SD.no.83
Supply & Fixing of Fan SD.no.110
Plug Point SD.no.36
Power Plug Point SD.no.39
S & Fixing DP Main swetch SD.no.142
S & FixingTNEB Meter board SD.no.125
Service pipe SD.no.73
Service Connection SD.no.68
Service Charge to EB
exhaust fan SD114 (including holes)
Provision of Water Supply arangment
200 Ltr Tank
50mm PVC Pipe
50mm PVC Bend
25mm PVC Pipe
25mm PVC Elbow
25mm PVC Tee
Brass chromium plated screw down tap 15/12mm
Provision towards construction of Rain water structure
Provision towards charges for writing name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Thiru.M.Venkatesh
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .