Loading…
Loading…
Tender Value
₹29.4 L
EMD Value
₹58,900
Closing Date
17 Mar 2026, 3:00 pmClosed
(1) Mumbai central (Main) :- Pre-monsoon cleaning and maintaining cleanliness of valley gutter of COP for a period of monsoon and pre-monsoon cleaning of terrace slab of building under jurisdiction of SSE (W-I)-Mumbai central. (2) Marine lines to Khar :- Pre-monsoon cleaning and maintaining cleanliness of valley gutter of COP for a period of monsoon and pre-monsoon cleaning of terrace slab of buildings under jurisdiction of ADEN(W/S)-Bandra. (3) Mumbai central to Prabhadevi :- Pre- monsoon cleaning and maintaining cleanliness of valley gutter covering shed and terrace slab of buildings under jurisdiction of ADEN(Est/S)-Lower parel, including Mumbai central carshed, Mahalaxmi-Workshop, Lower parel workshop & Wadala Railway colony
BCT-25-26-318
BCT-25-26-318
Open
120 Days
Mumbai, Maharashtra
₹0
₹58,900
18 Feb 2026
18 Feb 2026
3 Mar 2026
Item Breakup - A-All NS Items
CLEANING OF VALLEY GUTTER ONE TIME Running BEFORE MONSOON: Cleaning of valley gutter of Metre COP by Mannual/ Machanical mean including scrapping and removing dust, brooming the surface of valley gutter and removing debris generated from same Valley gutter & cleaning of down take pipe mouth surroundings connected to same valley gutter and removing debris generated, to out side of the Railway land, including labours, tools and plants, machineries and taxes, etc. complete. Total 1187608.05 Item- 2 Cleaning of roof one time before monsoon S No. Item Description of Item Unit Qty Rate Amount No
CLEANING OF ROOF ONE TIME BEFORE Sqm MONSOON COMPLETE: Cleaning of terrace slab of building by Mannual/ Machanical mean including scrapping and removing of dust/ debris, removing vegetation on terrace slab or near openings of downtake pipe, brooming the surface of terrace slab including removing debris/garbages generated from same terrace to out side of the Railway land, including labours, tools and plants, machineries and taxes, etc. completed.. Total 1281043.58 Item- 3 Maintenance of valley gutter during 120 days of monsoon S No. Item Description of Item Unit Qty Rate Amount No
MAINTANENCE OF VALLEY GUTTER DURING 120 Running 3663572.40 DAYS OF MONSOON: Maintaining cleanliness of Metre valley gutter of COP for 120 days in monsoon season including removing dust & all type of garbages from valley gutter for free flow of rainwater from valley gutter all the time and removing debris generated from same Valley gutter & maintaining cleanliness of down take pipe mouth connected to valley gutter and removing debris generated to out side of the Railway land, including labours, tools and plants, machineries and taxes, etc. completed. (Note :- 30529.77 Rm x 120 Days= 3663572.40 Mtr) Total 476264.41
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1-Safetyrules.pdf
ATTACHMENT
2-guidelineforelectricalcondition.pdf
ATTACHMENT
3-JPOSTandElectfordiggingwork.pdf
ATTACHMENT
NOrelativecertificate.pdf
ATTACHMENT
ProcedureforpaymentofContractorbillasperGST.pdf
ATTACHMENT
Letterofcreditasmodeofpayment_1.pdf
ATTACHMENT
PCEletterEMDPGSD.pdf
ATTACHMENT
NoRetiredRailwayEmployeeGCCApril2022.pdf
ATTACHMENT
Download all tender documents and submit your bid