| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.9 LAccepted-AOC | ₹39.9 L Quoted ₹40.1 L | L1 | Accepted-AOC As directed by CWC, Contract Agreement is placed on the L1 contractor, B.V. Enterprises, Chennai, at their revised quoted total amount of Rs. 39,93,602.00 /- for the work. |
| 2 | L2₹41.3 L+₹1.2 L (3.10%)Rejected-Finance | ₹41.3 L+₹1.2 L (3.10%) | L2 | Rejected-Finance Being L2 Contractor. Not Accepted |
| 3 | L3₹45.9 L+₹5.8 L (14.6%)Rejected-Finance | ₹45.9 L+₹5.8 L (14.6%) | L3 | Rejected-Finance Being L3 Contractor. Not Accepted |
| Sl No | Description | Qty | Unit | Leela Constructions L3 | DEEPAM ENTERPRISES L2 | B.V.Enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00 | Taking down door shutters and frame exc 1.5sqm in not exc 4 sqmwithout taking shutters from frame and handing over to CE(Fy) stores. | 40 | EACH | 470 ₹18,800 | 400 ₹16,000 Lowest | 400 ₹16,000 Lowest |
| 2.00 | Earth work excavation hard/dense soil over areas not exceeding 1.5 m deep and getting out. | 35 | CUM | 465 ₹16,275 | 410 ₹14,350 | 400 ₹14,000 Lowest |
| 3.00 | Demolition Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles. | 20 | CUM | 1,810 ₹36,200 | 1,450 ₹29,000 Lowest | 1,500 ₹30,000 |
| 4.00 | Demolition of reinforced Cement Concrete structure of any description. | 4 | CUM | 1,950 ₹7,800 | 1,750 ₹7,000 | 1,700 ₹6,800 Lowest |
| 5.00 | Demolition of Unreinforced Cement Concrete structure of any description. | 15 | CUM | 1,800 ₹27,000 | 1,550 ₹23,250 | 1,500 ₹22,500 Lowest |
| 6.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises. | 350 | SQM | 100 ₹35,000 | 78 ₹27,300 Lowest | 80 ₹28,000 |
| 7.00 | Taking up or down 25 or 32 mm steel tubing and connections, including cleaning for refixing or removal to store. | 50 | RM | 40 ₹2,000 | 32.5 ₹1,625 Lowest | 40 ₹2,000 |
| 8.00 | Taking up or down 20 mm steel tubing and connections, including cleaning for refixing or removal to store. | 100 | RM | 35 ₹3,500 | 30.5 ₹3,050 Lowest | 35 ₹3,500 |
| 9.00 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. | 50 | SQM | 95 ₹4,750 | 75 ₹3,750 Lowest | 100 ₹5,000 |
| 10.00 | M & L for Cutting chases,Brick walls pinning in. making good to facings where required and pointing in cement mortar 1:3 to ends or edges of landings, steps, cills, sunshades, shelves, lintels, etc.; and cutting chases for concealed water tubing or concealed conduit wiring, etc., and making good, cutting not exc 10 cm girth. | 100 | RM | 50 ₹5,000 Lowest | 54 ₹5,400 | 50 ₹5,000 Lowest |
Tender Value
₹48.4 L
EMD Value
₹97,000
Closing Date
19 Jun 2026, 2:00 pmClosed
THE CHIEF GENERAL MANAGER
THE CGM, FMU-HVF, AVADI, CHENNAI - 54
REPAIRS TO THE EXISTING DAMAGED EMPLOYEES TOILETS OF HEAT TREATMENT SHOP AT HVF AVADI.
2026_AVNL_279672_1
HVF/TE/13025/CEO/2026-27/24
Open Tender
Civil Works
Works
240 days
HVF, AVADI
Details enclosed
8 documents required · 8 mandatory
₹0
₹97,000
21 Aug 2026
4 Jun 2026
20 Jun 2026
4 Jun 2026
19 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down door shutters and frame exc 1.5sqm in not exc 4 sqmwithout taking shutters from frame and handing over to CE(Fy) stores. | 40 | EACH | 523.94 | ₹20,957.6 |
| 2 | Earth work excavation hard/dense soil over areas not exceeding 1.5 m deep and getting out. | 35 | CUM | 517.5 | ₹18,112.5 |
| 3 | Demolition Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles. | 20 | CUM | 1,888.23 | ₹37,764.6 |
| 4 | Demolition of reinforced Cement Concrete structure of any description. | 4 | CUM | 2,166.26 | ₹8,665.04 |
| 5 | Demolition of Unreinforced Cement Concrete structure of any description. | 15 | CUM | 1,876 | ₹28,140 |
| 6 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises. | 350 | SQM | 102.93 | ₹36,025.5 |
| 7 | Taking up or down 25 or 32 mm steel tubing and connections, including cleaning for refixing or removal to store. | 50 | RM | 46.23 | ₹2,311.5 |
| 8 | Taking up or down 20 mm steel tubing and connections, including cleaning for refixing or removal to store. | 100 | RM | 42.11 | ₹4,211 |
| 9 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. | 50 | SQM | 109.18 | ₹5,459 |
| 10 | M & L for Cutting chases,Brick walls pinning in. making good to facings where required and pointing in cement mortar 1:3 to ends or edges of landings, steps, cills, sunshades, shelves, lintels, etc.; and cutting chases for concealed water tubing or concealed conduit wiring, etc., and making good, cutting not exc 10 cm girth. | 100 | RM | 58.02 | ₹5,802 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_326442.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .