| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.1 CrAdmitted-Finance WARD 10 SUKESH KUMAR WARD 10 KESHAWE BEGUSARAI BEGUSARAI BIHAR 851134 | BEGUSARAI | BIHAR | 851134 | L1 | Admitted-Finance | ||
| 2 | L2₹12.6 Cr+₹1.4 Cr (12.7%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical | - | Rejected-Technical NOT RECOMMANDED | ||
| 4 | Rejected-Technical AT PO KESHAWE PS BARAUNI BEHIND SRIYAM PETROL PUMP KESHAWE BEGUSARAI BIHAR 851134 INDIA | BEGUSARAI | BIHAR | 851134 | - | Rejected-Technical NOT RECOMMANDED | ||
| 5 | Rejected-Technical | - | Rejected-Technical NOT RECOMMANDED |
Tender Value
₹11.2 Cr
EMD Value
₹25 L
Closing Date
24 Apr 2023, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Group General Manager (Engineering)
Bridge and Roof Co. (India) Ltd Kankaria Centre (4TH/5th Floor) 2/1 Russel Street Kolkata 700 071
CARRYING OUT Structural Work including Fabrication Blasting Painting Erection Loading Unloading Transportation etc in connection with Piling Civil Structural and UG for Coker B Revamp Project at Barauni Refinery of Indian Oil Corporation
2023_BandR_744025_1
BANDR/HO/51244/STRUCTURAL /BARAUNI/SC/NIT/01
Open Tender
Miscellaneous Works
Works
120 days
Barauni Refinery of Indian Oil Corporation Limited
As per Tender Document
28 documents required · 28 mandatory
₹11,800
Bridge and Roof Co.India Ltd
₹25 L
23 May 2023
6 Mar 2023
25 Apr 2023
6 Mar 2023
24 Apr 2023
8 Mar 2023
6 Mar 2023 - 13 Mar 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | STRUCTURAL STEEL WORKS SPEC NO. 6-68-0006 | - | - | - | - |
| 2 | General Steel Works - FIM Items | - | - | - | - |
| 3 | Dismantling, modification & re-erecting in position and testing/ examining bolted and/ or welded STRUCTURAL STEEL WORKS ALREADY ERECTED BY OTHERS at all locations and levels UPTO & INCLUSIVE OF 20 m ABOVE HPP/ FGL, including all builtup sections/ compound sections made out of rolled sections and/or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, repair of damaged portion of primer as per Sl. No. 3.1 of Table 3 of Standard Specification for Surface Preparation and Protective Coating Document No. / Specification No. B390-000-79- 41-PLS-010 (or as per Job Specification, wherever applicable), grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified etc., all complete. SUPPLY OF ALL OTHER MATERIAL (OTHER THAN ALREADY ERECTED STRUCTURAL STEEL) IN CONTRACTOR'S SCOPE. | 10 | MT | 37,012 | ₹3,70,120 |
| 4 | Dismantling, modification & re-erecting in position and testing/ examining bolted and/ or welded STRUCTURAL STEEL WORKS ALREADY ERECTED BY OTHERS at all locations and levels MORE THAN 20 m ABOVE HPP/ FGL, including all builtup sections/ compound sections made out of rolled sections and/or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, repair of damaged portion of primer as per Sl. No. 3.1 of Table 3 of Standard Specification for Surface Preparation and ProtectiveCoating Document No. / Specification No. B390-000-79- 41-PLS-010 (or as per Job Specification, wherever applicable), grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified etc., all complete. SUPPLY OF ALL OTHER MATERIAL
(OTHER THAN ALREADY ERECTED STRUCTURAL STEEL) IN CONTRACTOR'S SCOPE. | 5 | MT | 43,026 | ₹2,15,130 |
| 5 | General Steel Works - Non FIM Items | - | - | - | - |
| 6 | Fabricating at CONTRACTOR's shop outside the plant boundary, transporting fabricated items to site, unloading, storing, erecting in position and testing/ examining , bolted and/ or welded STRUCTURAL STEEL WORKS of Grade E250A / E250BR / E250B0 (conforming to IS:2062 at all locations and levels UPTO & INCLUSIVE OF 20 m ABOVE HPP/ FGL including all builtup sections/ compound sections made out of rolled sections and/or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified, including preparation and submission of detailed fabrication drawings, preparing the surface for painting (SSPC-SP-10) and applying pre-erection/ shop primer (1 coat of F-9 @ 65-75 micron DFT) as per Job Specification No. B390-000-79- 41-PLS-01 (or as per Job Specification, wherever applicable) after fabrication etc.. all complete. ONLY STRUCTURAL STEEL WILL BE SUPPLIED FREE OF COST. REMAINING MATERIALS, COSUMABLES, EQUIPMENT & MACHINERIES, TOOL & TACKLES WILL BE UNDER SCOPE OF CONTRACTOR. | 5 | MT | 29,681 | ₹1,48,405 |
| 7 | Fabricating at CONTRACTOR's shop outside the plant boundary, transporting fabricated items to site, unloading, storing, erecting in position and testing/ examining , bolted and/ or welded STRUCTURAL STEEL WORKS of Grade E250A / E250BR / E250B0 (conforming to IS:2062 at all locations and levels MORE THAN 20 m ABOVE HPP/ FGL including all builtup sections/ compound sections made out of rolled sections and/or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified, including preparation and submission of detailed fabrication drawings, preparing the surface for painting (SSPC-SP-10) and applying pre-erection/ shop primer (1 coat of F-9 @ 65-75 micron DFT) as per Job Specification No. B390-000-79- 41-PLS-01 (or as per Job Specification, wherever applicable) after fabrication etc.. all complete. ONLY STRUCTURAL STEEL WILL BE SUPPLIED FREE OF COST. REMAINING MATERIALS, COSUMABLES, EQUIPMENT & MACHINERIES, TOOL & TACKLES WILL BE UNDER SCOPE OF CONTRACTOR. | 2 | MT | 39,859 | ₹79,718 |
| 8 | transporting, storing, fabricating & erecting in position and testing/ examining bolted and/ or welded STRUCTURAL STEEL WORKS of Grade E350BR / E350B0 (conforming to IS:2062) at all locations and levels UPTO & INCLUSIVE OF 20 m ABOVE HPP/ FGL, including all builtup sections/ compound sections made out of rolled sections and/ or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified, including preparation and submission of detailed fabrication drawings, preparing the surface for painting (SSPC-SP-10) and applying pre-erection/ shop primer (1 coat of F-9 @ 65-75 micron DFT) as per Job Specification No. B390-000-79- 41-PLS-01 (or as per Job Specification, wherever applicable) after fabrication etc., all complete. ONLY STRUCTURAL STEEL WILL BE SUPPLIED FREE OF COST. REMAINING MATERIALS, COSUMABLES, EQUIPMENT & MACHINERIES, TOOL & TACKLES WILL BE UNDER SCOPE OF CONTRACTOR. | 10 | MT | 37,184 | ₹3,71,840 |
| 9 | transporting, storing, fabricating & erecting in position and testing/ examining bolted and/ or welded STRUCTURAL STEEL WORKS of Grade E350BR / E350B0 (conforming to IS:2062) at all locations and levels MORE THAN 20 m ABOVE HPP/ FGL, including all builtup sections/ compound sections made out of rolled sections and/or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified, including preparation and submission of detailed fabrication drawings, preparing the surface for painting (SSPC-SP-10) and applying pre-erection/ shop primer (1 coat of F-9 @ 65-75 micron DFT) as per Job Specification No. B390-000-79- 41-PLS-01 (or as per Job Specification, wherever applicable) after fabrication etc., all complete. ONLY STRUCTURAL STEEL WILL BE SUPPLIED FREE OF COST. REMAINING MATERIALS, COSUMABLES, EQUIPMENT & MACHINERIES, TOOL & TACKLES WILL BE UNDER SCOPE OF CONTRACTOR. | 5 | MT | 41,811 | ₹2,09,055 |
| 10 | Fabricating at CONTRACTOR's shop outside the plant boundary, transporting fabricated items to site, unloading, storing, erecting in position and testing/ examining , bolted and/ or welded STRUCTURAL STEEL WORKS of Grade E350BR / E350B0 (conforming to IS:2062 at all locations and levels UPTO & INCLUSIVE OF 20 m ABOVE HPP/ FGL including all builtup sections/ compound sections made out of rolled sections and/ or plates/ bent plates in all types of structural frameworks, floor beams, stairs, or any other structural items or accessories to support equipments, piping, conveyor galleries, towers, masts, etc., but excluding silos, bunkers, hoppers, etc., cutting to required size, straightening/ bending if required, edge preparation, cleaning, preheating, bolting/ welding of joints, (including sealing the joints of box sections with continuous welding and plugging any open ends & holes of box sections), finishing edges by grinding, fixing in line and level with temporary staging & bracing and removal of the same after erection, grouting with Ordinary Grout or premix free flow Nonshrink Grout as specified, including preparation and submission of detailed fabrication drawings, preparing the surface for painting (SSPC-SP-10) and applying pre-erection/ shop primer (1 coat of F-9 @ 65-75 micron DFT) as per Job Specification No. B390-000-79- 41-PLS-01 (or as per Job Specification, wherever applicable) after fabrication etc.. all complete. ONLY STRUCTURAL STEEL WILL BE SUPPLIED FREE OF COST. REMAINING MATERIALS, COSUMABLES, EQUIPMENT & MACHINERIES, TOOL & TACKLES WILL BE UNDER SCOPE OF CONTRACTOR. | 2,100 | MT | 31,780 | ₹6,67,38,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.33 MB
eTender_Document_Civil-STRL-BARAUNI.pdf
Tender Documents • 0.90 MB
Strl_Works-UNPRICED-SOQR.pdf
Additional Documents • 0.05 MB
PAINTING-SPEC.pdf
Additional Documents • 14.55 MB
HSE-BARAUNI-001.pdf
Additional Documents • 33.19 MB
HSE-BARAUNI-002.pdf
Additional Documents • 8.73 MB
HSE-BARAUNI-003.pdf
Additional Documents • 25.58 MB
BOQ_782288.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .