Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-Finance | L1 | Accepted-Finance LOWEST BIDDER AT L1 POSITION | |
| 2 | L2₹6.0 L+₹8,735.71 (1.49%)Rejected-Finance | L2 | Rejected-Finance BIDDER AT L2 POSITION | |
| 3 | L3₹6.2 L+₹33,960.45 (5.79%)Rejected-Finance | L3 | Rejected-Finance BIDDER AT L3 POSITION |
Tender Value
₹8.1 L
EMD Value
₹16,160
Closing Date
12 Oct 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
esc jammu
ESC JAMMU
Development of butterfly zone at environment park raika
2022_FD_190898_1
ENIT OF 17 OF 2022-23 DATED 01-10-2022
Open Tender
Civil Works
Item Rate
45 days
raika park
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
ESC JAMMU
₹16,160
13 Oct 2022
1 Oct 2022
13 Oct 2022
3 Oct 2022
12 Oct 2022
3 Oct 2022
Amount
Providing and making of butterfly zone gate giving the look of butterfly make of Reinforced Cement concrete of 1:1.5:3 of 2' thick giving the colorful look like butterfly looking like entry gate to butterfly zone.the design and shape of the butterfly wentry will be taken up as per direction of site engineer incharge including all leads lift carriage complete job
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) including all leads lift carriage complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand :6 graded stone aggregate 40 mm nominal size) including all leads lift carriage complete job
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) including all leads lift carriage complete job
Painting with synthetic enamel paint of approved brand and manufacture to give an even shadeTwo or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
M/S PINTOO JI CONTRACTOR
KULDEEP SARAF
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .