Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹2.9 L+₹1,733.68 (0.60%)Rejected-Finance 215 RAIPUR ROAD KOLKATA 700047 | KOLKATA | KOLKATA | WEST BENGAL | 700047 | L2 | Rejected-Finance Not Acceptable | |
| 3 | L3₹2.9 L+₹5,201.06 (1.81%)Rejected-Finance | L3 | Rejected-Finance Not Acceptable | |
| 4 | L3₹2.9 L+₹5,201.06 (1.81%)Rejected-Finance | L3 | Rejected-Finance Not Acceptable | |
| 5 | L3₹2.9 L+₹5,201.06 (1.81%)Rejected-Finance | L3 | Rejected-Finance Not Acceptable |
Tender Value
₹2.9 L
EMD Value
₹5,779
Closing Date
10 Sept 2026, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE LALBAZAR
AE LALBAZAR
Repairing and painting including replacement of floor of the Chamber of Addl CP Crime situated at the 1st floor of the Main Building and repairing and painting within the compound of lalbazar Kol police HQ during the year 2026 27
2026_WBPWD_5019667_2
WBPWD/AE/LB/NIeT-06/2026-2027
Open Tender
CIVIL WORKS
Percentage
15 days
KOLKATA
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,779
Yes
4 Nov 2026
24 Aug 2026
15 Sept 2026
24 Aug 2026
10 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge 14.1.1 With cement mortar 1:4 (1 cement : 4 fine sand) | 32.77 | Sqm | 655.12 | ₹21,468.28 |
| 2 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. | 31.18 | Sqm | 87.84 | ₹2,738.85 |
| 3 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete | 32.77 | Sqm | 186.76 | ₹6,120.13 |
| 4 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content.With water thinnable cement primer on wall surface having
VOC content less than 50 grams/litre | 65.39 | Sqm | 88.5 | ₹5,787.02 |
| 5 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour13.83.2 Two coats | 0.2 | Sqm | 170.9 | ₹34.01 |
| 6 | With ready mixed aluminium primer of approved brand andmanufacture on resinous wood and plywood | 21.55 | Sqm | 89.34 | ₹1,925.28 |
| 7 | With ready mixed red oxide zinc chromate primer of approvedbrand and manufacture on steel galvanised iron/ steel works | 8.7 | Sqm | 80.66 | ₹701.74 |
| 8 | Finishing with Deluxe Multi surface paint system for interiors and exteriorsusing Primer as per manufacturers specifications Painting wood work with Deluxe Multi Surface Paint of requiredshade. Two or more coat applied @ 0.90 ltr/10 sqm over anunder coat of primer applied @0.75 ltr/10 sqm of approved
brand and manufacture | - | Sqm | 210.93 | - |
| 8.01 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approvedbrand and manufacture | 8.7 | Sqm | 204.29 | ₹1,777.32 |
| 9 | Dismantling wooden boardings in lining of walls and partitions, excludingsupporting members but including stacking within 50 metres lead | 14.85 | Sqm | 73 | ₹1,084.05 |
stage.html
html • 0.14 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.83 MB
WBF2911.pdf
Tender Documents • 0.53 MB
BOQ_5092625.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .