| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹2.2 L+₹2,146.65 (1.00%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹2.2 L+₹2,382.78 (1.11%)Rejected-Finance 114 3 KASUNDIA ROAD HOWRAH 711101 | HOWRAH | WEST BENGAL | 711101 | 3 | Rejected-Finance L3 |
Tender Value
₹2.1 L
EMD Value
₹4,293
Closing Date
15 Dec 2025, 5:00 pmClosed
Chairman, Contai Municipality
Hatabari, Contai
Construction of Protection Wall Length 12.00M Rabin Khanda House, Mouza. Dharmadasbar under Booth no 91 ,Priority Serial No 2, Ward No XX, within contai Municipality
2025_MAD_952925_2
WBMAD/ULB/CONTAI/197/APAS/B 91/2025-26
Open Tender
CIVIL WORKS
Percentage
30 days
Contai Municipality
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,293
7 Mar 2026
19 Nov 2025
17 Dec 2025
19 Nov 2025
15 Dec 2025
19 Nov 2025
P.W.D, Page No. 1, Item No.- 2 (a)
Earth work in excavation of foundation trenches or drains. in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches. leveling. dressing and ramming the bottom. bailing out water as required complete . (a) Depth of foundation upto 1500mm
Page No.- 23 / Item No.- 1(a)
(I) Cement concrete with graded jhama khoa (30 mm size excluding shuttering) In ground floor (a) 1:3:6 proportion
P.W.D, Page No. 47, Item No. 3
supplying and laying polythene Sheet ( 150 gm / sq.m) over damp proof couse or below flooring or roof terracing or in foundation trenches.
P.W.D, Page No.- 26, Item no.- 10(i)
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Page No.- 43, Item no.- 40(i)(I).
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel I. JSW/ JSPL/Shyam/SRMB/BMASL/Electro Steel / SSL
P.W.D, Page No.- 42, Item no.- 36 (f).
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) i) Steel suttering or 9 to 12 mm thick approved quality ply board suttering in any concrete work.
Page No.-1, Item No.-3
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
PWD Roads Page No.-304, Item No.-13.03
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
P.W.D (Roads)Page No.- 270/ Item No. - 8.07
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
Add 18% GST (Sl No. 1 to 5)
Add 1% Welfare Cess
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_2280686.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .