Loading…
Loading…
Tender Value
₹8 L
EMD Value
₹24,000
Closing Date
1 Sept 2026, 1:30 pm4d left
DFO Kishtwar
Forest Complex Sarkoot Kishtwar
BOQ
2026_FD_322396_1
44 of 2026
Open Tender
Agricultural or Forestry
Percentage
60 days
Kishtwar Range
SBD
2 documents required · 2 mandatory
₹600
DFO Kishtwar
₹24,000
25 Aug 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 67.97 | Cum | 1,740.45 | ₹1,18,298.39 |
| 2 | Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil | 33.45 | Cum | 479.3 | ₹16,032.59 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) | 4.25 | Cum | 4,826.5 | ₹20,512.63 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed | 16.28 | Cum | 5,733.8 | ₹93,346.26 |
| 5 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended floors,balconies, landings and staircase having upto 15° slope. excluding cost of centering and shuttering ,all work upto floor V level | 1.35 | Cum | 9,821.85 | ₹13,259.5 |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Qty wide item no -5 | 0.93 | Qtl | 12,320 | ₹11,457.6 |
| 7 | Centring and shuttermg including strutting, propping etc. and removal of form for· Columns, pillars, piers, abutments, posts and struts | 5.95 | Sqm | 1 | ₹5.94 |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes To be paid as per acutal during execution (GATE) | 45 | Kg | 1 | ₹44.96 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 74.81 | Sqm | - | - |
| 10 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in
foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 4 coarse sand) and Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 31.07 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_1080286.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].