| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹80.9 LAccepted-AOC SUNDERPURA SUNDERPURA 126116 | SUNDARPURA | JIND | HARYANA | 126116 | ₹80.9 L | 1 | Accepted-AOC L1 |
| 2 | 2₹84.4 LRejected-Finance NA | PALWAL | HARYANA | 121004 | ₹84.4 L | 2 | Rejected-Finance L2 |
| 3 | 3₹84.5 LRejected-Finance | ₹84.5 L | 3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
| 5 | Rejected-Technical NEAR RAVI DASS MANDIR PANA RAU V P O KHIDWALI 124303 | KHIDWALI | ROHTAK | HARYANA | 124303 | - | - | Rejected-Technical Technically Disqualified |
| Sl No | Description | Qty | Unit | THE TOHANA NEW VIKAS COOP LANDC SOCIETY L1 | Brijmohan Sharma Contractor L2 | M/S S.S. BUILDERS L3 |
|---|---|---|---|---|---|---|
| 1.10 | Construction of S/H building (Size = 24.45 M x 10.06 M ) i/c cost of all materials viz cement, steel reinforcement, Bajri, Crusher, Bricks, Tools, Labour, men and machinery etc. etc. for completion of Switch House Building i/c providing internal water supply and sewerage system and fixtures in the toilet, MS staircase with hand railing (wt. 300 kg approx.) outside, PVC Water Storage tank, internal electrical wiring and fittings i/c Fire hydrant with 100’ long flexible cloth pipe 2” dia suitable for fire hydrant and Indoor cable trench complete in all respects as per DHBVN’s approved design, drawings and bid specification for civil works as per Vol-III of bid and directions of the Engineer Incharge (Any other work incidental to complete the building shall not be paid extra.) : Chatter | 1 | Job | 38,00,000 ₹38 L | 38,00,000 ₹38 L | 38,00,000 ₹38 L |
| 1.20 | Cost. of Brick outdoor cable trenches in the S/yard i/c RCC covers i/c cost of all material, labour men and machinery complete in all respects as per DHBVN’s approved design, drawings, bid specifications and directions of the Engineer Incharge. (In case length of trenches varies as per site requirement payment shall be made on prop. Basis) : Chatter | 180 | Metre | 6,000 ₹10.8 L | 6,500 ₹11.7 L | 7,000 ₹12.6 L |
| 1.30 | Construction of sump pit in RCC work to collect water from outdoor cable trenches i/c 1 BHP Pump Set (CROMPTON / KIRLOSKAR MAKE) with M.S. enclosures and cost of all materials, labour, men and machinery complete in all respect as per DHBVN’s approved design, drawings, bid specification and directions of Engineer –in-charges. ( Any other work incidental to complete the work shall not be paid extra) : Chatter | 2 | Job | 35,000 ₹70,000 | 44,200 ₹88,400 | 50,000 ₹1 L |
| 1.40 | Construction of unclimble fencing for the Switch Yard and distribution T/F i/c cost of all materials, Labour, men and machinery etc. etc. complete in all respects, as per DHBVN’s approved design, drawings, bid specifications and directions of the Engineer Incharge. (: In case length of fencing varies as per site requirement payment shall be made on prop. Basis) : Chatter | 100 | Metre | 6,000 ₹6 L | 4,700 ₹4.7 L | 4,800 ₹4.8 L |
| 1.50 | Supply and spreading of Bajri of 20mm nominal size in the complete Yard area (Both bays) i.e. within toe walls of U/C fencing and road and S/Stn. transformer area i/c anti weed treatment and site surfacing complete in all respects, as per specifications and directions of the Engineer Incharge. (Any other work incidental to complete the work shall not be paid extra). : Chatter | 120 | cum | 1,000 ₹1.2 L | 1,400 ₹1.7 L | 1,500 ₹1.8 L |
| 1.60 | Earth filling with good earth as per the satisfaction of Engineer Incharge and leveling in layers (as per specification), dressing i/c carriage irrespective of lead, loading and unloading, watering and compaction in layers with roller i/c compaction of earth for Switch Yard area, roads and balance area of the substation land (entire area within boundary wall) complete in all respects . The earth should be leveled with computerized leveler in complete area of S/Stn land. Earth filling in 3 feet width be filled along the outer periphery of the compound wall upto finished designed level (Note: In case qty. varies as per site requirements, payment shall be made on proportionate basis) : Chatter | 600 | cum | 50 ₹30,000 | 185 ₹1.1 L | 200 ₹1.2 L |
| 1.70 | Construction of CC road and extra approach CC road in the sub-station area complete in all respects as per DHBVN’s approved design, drawings, bid specification and directions of the Engineer Incharge. (Note: In case the area of road varies as per site requirements, payment shall be made on proportionate basis) : Chatter | 400 | Sqm | 920 ₹3.7 L | 875 ₹3.5 L | 1,000 ₹4 L |
| 1.80 | Const. of culverts as per DHBVN approved design, drawing bid specification and direction of the Engineer incharge complete in all respect. (Note: In case no. of culverts varies as per site requirements, payment shall be made on proportionate basis) : Chatter | 5 | Job | 50,000 ₹2.5 L | 46,500 ₹2.3 L | 50,000 ₹2.5 L |
| 1.90 | Construction of RCC underground water storage tank 10000 Ltrs capacity for external water supply i/c 2 BHP Pump Set (CROMPTON / KIRLOSKAR MAKE) with M.S. enclosures and Construction of RCC Septic Tank and soakage Pit for disposal of waste form toilet of S/H building complete in all respects as per DHBVN’s approved design, drawings, bid specifications and direction of Engineer-in-Charge. : Chatter ( Water Tank : 106336 ) ( Sewerage System : 93725 ) | 1 | Job | 2,25,000 ₹2.3 L | 2,00,000 ₹2 L | 2,10,000 ₹2.1 L |
| 2.00 | Const. of Brick additional outdoor cable trenches for outgoing 11kv feeders and 33 kv incoming cables from 132/220 kv S/Stn., of HVPN as per Drgs of DHBVN. i/c RCC covers i/c cost of material and labour etc complete in all respects as per directions of Engineers in charge. (In case length of trenches varies as per site requirement payment shall be made on prop. Basis) : Chatter | 75 | Metre | 7,000 ₹5.3 L | 6,800 ₹5.1 L | 7,000 ₹5.3 L |
Updated dates
Tender Value
₹82.0 L
EMD Value
₹1.6 L
Closing Date
20 Jan 2026, 11:00 amClosed
SUDEEP
XEN/Civil Work, Hisar
Construction of new control room building and allied civil works 33 kv S/Stn Chattar Jind
2025_HBC_486169_1
2025A8B86EFE 8787 45A4 AC6E 5546AF5AC87D1035DHB
Open Tender
Civil Works
365 days
CHHATTER
As per DNIT
2 documents required · 2 mandatory
₹4,900
₹1.6 L
Yes
22 May 2026
28 Nov 2025
22 Jan 2026
28 Nov 2025
20 Jan 2026
28 Nov 2025
28 Nov 2025 - 20 Jan 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: XEN CIVIL WORKS DHBVN, HISAR
DNIT for the work :- Construction of New Control Room Building and allied civil works at 33 KV S/Stn. DHBVN Chatter (Jind)
Contract No: 9813045911
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description NS Item Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1.1 Construction of S/H building (Size = 24.45 M x 10.06 M ) i/c cost of all materials viz cement, steel reinforcement, Bajri, Crusher, Bricks, Tools, Labour, men and machinery etc. etc. for completion of Switch House Building i/c providing internal water supply and sewerage system and fixtures in the toilet, MS staircase with hand railing (wt. 300 kg approx.) outside, PVC Water Storage tank, internal electrical wiring and fittings i/c Fire hydrant with 100’ long flexible cloth pipe 2” dia suitable for fire hydrant and Indoor cable trench complete in all respects as per DHBVN’s approved design, drawings and bid specification for civil works as per Vol-III of bid and directions of the Engineer Incharge (Any other work incidental to complete the building shall not be paid extra.) : Chatter BI01010001010000000000000515BI0100001113 1 Job 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.2 Cost. of Brick outdoor cable trenches in the S/yard i/c RCC covers i/c cost of all material, labour men and machinery complete in all respects as per DHBVN’s approved design, drawings, bid specifications and directions of the Engineer Incharge. (In case length of trenches varies as per site requirement payment shall be made on prop. Basis) : Chatter 180 Metre 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.3 Construction of sump pit in RCC work to collect water from outdoor cable trenches i/c 1 BHP Pump Set (CROMPTON / KIRLOSKAR MAKE) with M.S. enclosures and cost of all materials, labour, men and machinery complete in all respect as per DHBVN’s approved design, drawings, bid specification and directions of Engineer –in-charges. ( Any other work incidental to complete the work shall not be paid extra) : Chatter 2 Job 0 Excess(+) Full Conversion INR
1.4 Construction of unclimble fencing for the Switch Yard and distribution T/F i/c cost of all materials, Labour, men and machinery etc. etc. complete in all respects, as per DHBVN’s approved design, drawings, bid specifications and directions of the Engineer Incharge. (: In case length of fencing varies as per site requirement payment shall be made on prop. Basis) : Chatter 100 Metre 0 Excess(+) Full Conversion INR
1.5 Supply and spreading of Bajri of 20mm nominal size in the complete Yard area (Both bays) i.e. within toe walls of U/C fencing and road and S/Stn. transformer area i/c anti weed treatment and site surfacing complete in all respects, as per specifications and directions of the Engineer Incharge. (Any other work incidental to complete the work shall not be paid extra). : Chatter 120 cum 0 Excess(+) Full Conversion INR
1.6 Earth filling with good earth as per the satisfaction of Engineer Incharge and leveling in layers (as per specification), dressing i/c carriage irrespective of lead, loading and unloading, watering and compaction in layers with roller i/c compaction of earth for Switch Yard area, roads and balance area of the substation land (entire area within boundary wall) complete in all respects . The earth should be leveled with computerized leveler in complete area of S/Stn land. Earth filling in 3 feet width be filled along the outer periphery of the compound wall upto finished designed level (Note: In case qty. varies as per site requirements, payment shall be made on proportionate basis) : Chatter 600 cum 0 Excess(+) Full Conversion INR
1.7 Construction of CC road and extra approach CC road in the sub-station area complete in all respects as per DHBVN’s approved design, drawings, bid specification and directions of the Engineer Incharge. (Note: In case the area of road varies as per site requirements, payment shall be made on proportionate basis) : Chatter 400 Sqm 0 Excess(+) Full Conversion INR
1.8 Const. of culverts as per DHBVN approved design, drawing bid specification and direction of the Engineer incharge complete in all respect. (Note: In case no. of culverts varies as per site requirements, payment shall be made on proportionate basis) : Chatter 5 Job 0 Excess(+) Full Conversion INR
1.9 Construction of RCC underground water storage tank 10000 Ltrs capacity for external water supply i/c 2 BHP Pump Set (CROMPTON / KIRLOSKAR MAKE) with M.S. enclosures and Construction of RCC Septic Tank and soakage Pit for disposal of waste form toilet of S/H building complete in all respects as per DHBVN’s approved design, drawings, bid specifications and direction of Engineer-in-Charge. : Chatter ( Water Tank : 106336 ) ( Sewerage System : 93725 ) 1 Job 0 Excess(+) Full Conversion INR
2 Const. of Brick additional outdoor cable trenches for outgoing 11kv feeders and 33 kv incoming cables from 132/220 kv S/Stn., of HVPN as per Drgs of DHBVN. i/c RCC covers i/c cost of material and labour etc complete in all respects as per directions of Engineers in charge. (In case length of trenches varies as per site requirement payment shall be made on prop. Basis) : Chatter 75 Metre 0 Excess(+) Full Conversion INR
2.1 Construction of complaint cum cash collection centre i/c cost of all material labour, TandP viz cement, steel, reinforcement, bajri crusher, bricks men and machinery etc. i/c providing internal water supply, sewerage and fixtures in the toilet, internal electrical wiring complete in all respects as per DHBVN’s design and bid specifications for civil works as per Vol-III of bid and directions of the Engineer-in-charge. ( any other work incidental to complete the Bldg. shall not be paid extra) : Chatter 1 Job 0 Excess(+) Full Conversion INR
2.2 PandF of U/C Fencing gate (44622.00)and compound wall gate (55484.00) as DHBVN approved design drg. and bid specification and direction of Engineer incharge complete in all respect. : Chatter 1 Job 0 Excess(+) Full Conversion INR
2.3 Const. of compound wall all along the boundary of the sub-stn with cost of materials tools and plants etc complete in all respects as per DHBVN’s approved design, drawings and bid specifications and directions of the Engineer Incharge. (Note: In case the length of B/wall varies as per site requirements, payment shall be made on proportionate basis) : Chatter 150 Metre 0 Excess(+) Full Conversion INR
2.4 Providing and Laying of 6`` dia PVC pipe with 6kg/cm2 for sewer pipe line i/c Cutting, Jointing and Refilling of Earth. (Note: In case the length of sewer line varies as per site requirements, payment shall be made on proportionate basis) : Chatter 25 Metre 0 Excess(+) Full Conversion INR
2.5 Repair of Existing Boundary Wall Complete in all respects : Chatter 1 Job 0 Excess(+) Full Conversion INR
2.6 Dismantling of S/H Building Complete in all respects : Chatter 1 Job 0 Excess(+) Full Conversion INR
2.7 Dismantling of Existing Road Complete in all respects : Chatter 1 Job 0 Excess(+) Full Conversion INR
2.8 Recovery of Bricks Scrap : Chatter 10000 Nos. 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2.9 Recovery of Bricks Bats Scrap : Chatter 23 cum 0 Excess(+) Full Conversion INR
3 Recovery of Bricks Tile Scrap : Chatter 2500 Nos. 0 Excess(+) Full Conversion INR
3.1 Recovery of Steel Scrap : Chatter 2700 Kg. 0 Excess(+) Full Conversion INR
3.2 Recovery of Iron Scrap : Chatter 500 Kg. 0 Excess(+) Full Conversion INR
3.3 Recovery of GI Pipe Scrap : Chatter 200 Kg. 0 Excess(+) Full Conversion INR
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_564203.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid