Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Accept₹36.9 LAccepted-AOC | ₹36.9 L | Accept | Accepted-AOC AOC |
| 2 | Rejected₹37.0 LRejected-Finance H NO 136 SUBHASH NAGAR TEHSIL CAMP PANIPAT HARYANA 132103 | PANIPAT | PANIPAT | HARYANA | 132103 | ₹37.0 L | Rejected | Rejected-Finance Rejected |
| 3 | Rejected₹42.1 LRejected-Finance VILLAGE BHUSLANA TEHSIL SAFIDON DISTRICT JIND | JIND | HARYANA | 126101 | ₹42.1 L | Rejected | Rejected-Finance Rejected |
| 4 | Not Admitted-Fee/PreQual/Technical PANIPAT URBAN AREA | PANIPAT | PANIPAT | HARYANA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | PARMOD KUMAR L3 | CHIRAG WADHWA L2 | deepak chahal contractor L1 |
|---|---|---|---|---|---|---|
| 1.00NS ITEMS | ||||||
| 1.01 | Recovery of old and usable bricks | 25,000 | Each | 2 ₹-50,000 Lowest | 2 ₹-50,000 Lowest | 6 ₹-1,50,000 |
| 1.02 | Credit of old steel | 1,640 | Kg. | 20 ₹-32,800 Lowest | 20 ₹-32,800 Lowest | 30 ₹-49,200 |
| 1.03 | Analysis of rate for providing and fixing of concertina coil fencing GI Wire having 2.50 mm wire diameter, 600 mm coil diameter and two horizontal line of concertina GI wire, including the cost of making hole in the angle to pass the Concertina coil through angle 1 and cost of metal clip complete in all respect | 107 | Metre | 800 ₹85,600 | 500 ₹53,500 | 260 ₹27,820 Lowest |
Tender Value
₹37.4 L
EMD Value
₹74,740
Closing Date
4 Jun 2026, 4:00 pmClosed
RUPESH CHANDER
Municipal Corporation Panipat
Construction of Boundary wall at 25MLD and 35MLD STP Siwah M.C Panipat
2026_HRY_525647_1
2026D0598CE6 DD8C 449B 855C 528BED180520286ULB
Open Tender
Civil Works
Works
200 days
Panipat
Construction of Boundary wall at 25MLD and 35MLD STP Siwah M.C Panipat
2 documents required · 2 mandatory
₹2,500
₹74,740
Yes
24 Jun 2026
30 May 2026
4 Jun 2026
30 May 2026
4 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1NS ITEMS | |||||
| 1.01 | Recovery of old and usable bricks | 25,000 | Each | 1 | ₹25,000 |
| 1.02 | Credit of old steel | 1,640 | Kg. | 1 | ₹1,640 |
| 1.03 | Analysis of rate for providing and fixing of concertina coil fencing GI Wire having 2.50 mm wire diameter, 600 mm coil diameter and two horizontal line of concertina GI wire, including the cost of making hole in the angle to pass the Concertina coil through angle 1 and cost of metal clip complete in all respect | 107 | Metre | 100 | ₹10,700 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.72 MB
BOQ_604615.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .