| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC CHANDANPARAPPU | KANYAKUMARI | KANYAKUMARI | TAMIL NADU | ₹1.3 L | L1 | Accepted-AOC L1 Contractor |
| 2 | L2₹1.3 LRejected-Finance | ₹1.3 L | L2 | Rejected-Finance 0.02 percent above |
| Sl No | Description | Qty | Unit | SUTHERSON CONTRACTOR L2 | THANGARAJA L1 |
|---|---|---|---|---|---|
| 1.00Maintenance of existing drainage From Municipal office front side at Ward no. 16 in Kanniyakumari Municipality | |||||
| 2.00 | Dismantling RCC by manual / by using deploying machineries | 4 | cum | 4,611 ₹18,444 | 4,610 ₹18,440 |
| 3.00 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications cc pavement | 3 | cum | 6,886 ₹20,658 | 6,885 ₹20,655 |
| 4.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 360 | kg | 93 ₹33,480 | 92 ₹33,120 |
| 5.00 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for deck slab | 4.5 | cum | 8,927 ₹40,171.50 | 8,926 ₹40,167 |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 20,296 ₹20,296 | 20,229 ₹20,229 |
Tender Value
Refer Docs
EMD Value
₹1,350
Closing Date
26 Feb 2026, 3:00 pmClosed
Commissioner, Kanniyakumari Municipality
Kanniyakumari Municipality
Maintenance of existing drainage Municipal office front at Ward no. 16 in Kanniyakumari Municipality
2026_MAWS_665112_1
1208/2026/A1
Open Tender
Civil Works - Others
90 days
Kanyakumari Municipality
as per tender notice
2 documents required · 2 mandatory
₹0
₹1,350
4 Jun 2026
24 Feb 2026
26 Feb 2026
24 Feb 2026
26 Feb 2026
24 Feb 2026
Maintenance of existing drainage From Municipal office front side at Ward no. 16 in Kanniyakumari Municipality
Dismantling RCC by manual / by using deploying machineries
Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications cc pavement
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for deck slab
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_798780.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.12 MB
BOQ_798780.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid