Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.4 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹39.6 L+₹2.4 L (6.49%)Rejected-Finance | L2 | Rejected-Finance other than lowest | |
| 3 | L3₹43.7 L+₹6.5 L (17.4%)Rejected-Finance | L3 | Rejected-Finance other than lowest | |
| 4 | L4₹45.2 L+₹7.9 L (21.3%)Rejected-Finance | L4 | Rejected-Finance other than lowest | |
| 5 | L5₹46.3 L+₹9.0 L (24.3%)Rejected-Finance | L5 | Rejected-Finance other than lowest |
| Sl No | Description | Qty | Unit | AMIT RISHABH BUILDERS PVT LTD L4 | M/S JALANDRA CONSTRUCTIONS L5 | ASHISH SHARMA L2 | M/S ROHIT CONSTRUCTION L3 | M/s KAKSI ENTERPRISES L1 | PUSHPA G ENTERPRISES L6 | JAGDAMBA CONSTRUCTION COMPANY L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm exc 50 mm and n exc 100 mm deep complete all as specified and directed. | 150 | 10 Sqm | 150 ₹22,500 | 200 ₹30,000 | 199 ₹29,850 | 50 ₹7,500 Lowest | 170 ₹25,500 | 500 ₹75,000 | 300 ₹45,000 |
| 2.00 | M&L for Removing excavated material n exc 50m and depositing where directed at a level n exc 1.5 m above the starting point soil complete all as specified and directed. | 97.5 | Cum | 50 ₹4,875 Lowest | 60 ₹5,850 | 199 ₹19,402.5 | 100 ₹9,750 | 100 ₹9,750 | 90 ₹8,775 | 350 ₹34,125 |
| 3.00 | M&L for Cement concrete work in pavement/ hard-standing of flexural strength 40 kg/per square centimetre in field using 400 kg of cement per cubic metre, thickness of concrete 150mm including triangular/non circular synthetic fibre reinforcement @ 0.25% by weight of cement including form work for butt nosing, rounding off edges , curing , spread and compacted complete all as specified and directed.
Note: (i) The cost of admixture required as per design mix shall deemed to be included in the rate (the constant shall be applied based on design mix).
(ii) Polyster triangular/non circular synthetic fibres as secondary reinforcement mixed in concrete shall be measured and paid for separtely under resp-ective item of this schedule. However, mixing shall be deemed to be included in the rate (the constant shall be applied based on design mix).
(iii) Construction joints, dummy (contraction joints) and expansion joints shall be measured and paid separately under respective items.
(iv) Deduction shall be made in PQC for quantity for expansion joint.
(v) Rate inclusive of necessary formwork required during construction. | 225 | Cum | 7,200 ₹16,20,000 | 7,300 ₹16,42,500 | 6,509 ₹14,64,525 | 7,000 ₹15,75,000 | 6,400 ₹14,40,000 Lowest | 8,250 ₹18,56,250 | 7,400 ₹16,65,000 |
| 4.00 | Supply only polyster triangular fibres /non circular fibres (Recron 3S triangular fibre type CT 2012 12mm) having tensile strength 4000-6000 Kg/cm2, designed for melting point more than 250 degree celsius @ 0.25% by weight of cement in controlled pavement quality cement concrete and having specific gravity of 1.34 to 1.40 complete all as specified and directed. | 225 | Kg | 50 ₹11,250 Lowest | 300 ₹67,500 | 500 ₹1,12,500 | 430 ₹96,750 | 240 ₹54,000 | 390 ₹87,750 | 500 ₹1,12,500 |
| 5.00 | Providing and Laying Dry lean Concrete (DLC) 75 mm thick of aggregate gradation as per Table 1 of SP 49:2014 having 7 day average compressive strength not less than 7 MPa Minimum cement content not less than 140 Kg/Cum DLC mixed in Batching Plant, transported to site and laid by electron ic sensor paver including spreading and compacting usign high amplitude tamping bars of paver (initial compaction) further by double drum smooth wheeled vibratory rollers with 80-100 KN static weight to achieve minimum dry density not less than 98% of maximum Dry Density, necessary finishing etc complete all as specified and tolerances to be as per Table 900-1 of MaRTH specifications for Road and Bridge work 2013.Rate inclusive of necessary formwork required during construction complete all as specified and directed. | 150 | 10 Sqm | 4,000 ₹6,00,000 | 4,200 ₹6,30,000 | 2,399 ₹3,59,850 Lowest | 3,000 ₹4,50,000 | 2,400 ₹3,60,000 | 3,100 ₹4,65,000 | 5,200 ₹7,80,000 |
| 6.00 | M&L for finishing concrete pavement by brooming when concrete is green complete all as specified and directed. | 150 | 10 Sqm | 100 ₹15,000 | 60 ₹9,000 | 249 ₹37,350 | 180 ₹27,000 | 30 ₹4,500 Lowest | 35 ₹5,250 | 200 ₹30,000 |
| 7.00 | M&L for high density polythene film (transparent colour) in single layer of 200 micron thickness of virgin quality (as per ASTM D 2103, IS- 2508) laid with side and end overlapping not less than 300mm complete all as specified and directed. | 1,500 | Sqm | 30 ₹45,000 Lowest | 70 ₹1,05,000 | 39 ₹58,500 | 135 ₹2,02,500 | 70 ₹1,05,000 | 165 ₹2,47,500 | 100 ₹1,50,000 |
| 8.00 | M&L for Forming 20mm thick Expansion joints filled with pre-formed bituminous filler and top 30mm primed and sealed with sealing compound, Grade ‘B' in 150mm thick slab complete all as specified and directed. | 6 | 10 RM | 1,800 ₹10,800 | 900 ₹5,400 | 399 ₹2,394 Lowest | 500 ₹3,000 | 560 ₹3,360 | 890 ₹5,340 | 1,200 ₹7,200 |
| 9.00 | M&L for Forming Contraction (Dummy) joints 65mm deep x 10mm wide, filled with sealing compound Grade 'B' in 150mm thick slab complete all as specified and directed. | 33 | 10 RM | 800 ₹26,400 | 600 ₹19,800 | 399 ₹13,167 Lowest | 480 ₹15,840 | 600 ₹19,800 | 825 ₹27,225 | 1,150 ₹37,950 |
| 10.00 | M&L for Forming Construction joint 30mm deep x 10mm wide filled with sealing compound Grade 'B' in 150mm thick slab complete all as specified and directed. | 6 | 10 RM | 500 ₹3,000 | 400 ₹2,400 | 399 ₹2,394 | 270 ₹1,620 Lowest | 560 ₹3,360 | 699.5 ₹4,197 | 650 ₹3,900 |
Tender Value
₹48.5 L
EMD Value
₹96,980
Closing Date
18 Aug 2025, 6:00 pmClosed
CWE JAIPUR
Military Engineer Services, HQ Commander Works Engineer, KalyanMarg, Banipark, Jaipur-06
SPECIAL REPAIR TO ROAD PATH IN KARAM VIHAR AND DEFENCE COLONY UNDER ZONE-II OF GE JAIPUR
2025_MES_722905_1
CWE/JPR/82483/E8
Open Tender
Civil Works - Roads
Item Rate
120 days
GE JAIPUR
AS PER NIT
6 documents required · 6 mandatory
₹500
GE JAIPUR
₹96,980
Yes
24 Nov 2025
26 Jul 2025
20 Aug 2025
26 Jul 2025
18 Aug 2025
11 Aug 2025
26 Jul 2025 - 7 Aug 2025
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .