| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAdmitted-Finance H NO 312 B D C OPP PLOT NO 23 TRANSPORT AREA SECTOR 26 CHANDIGARH | CHANDIGARH | CHANDIGARH | CHANDIGARH | ₹18.1 L | L1 | Admitted-Finance |
| 2 | L2₹20.6 LAdmitted-Finance 411 STREET NO 4 PANCHVATI NAGAR BATHINDA 151001 | BATHINDA | PUNJAB | 151001 | ₹20.6 L | L2 | Admitted-Finance |
| 3 | L3₹22.1 LAdmitted-Finance 368 PHASE 4 SAS NAGAR MOHALI 160059 PB | S A S NAGAR | PUNJAB | 160059 | ₹22.1 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical 363 39KA HASSANGANJ BAWLI KUMAR COMPANY 363 39 KA HASAN GANJ BAWLI SAADAT GANJ LUCKNOW SAADATGANJ LUCKNOW UTTAR PRADESH 226017 | LUCKNOW | UTTAR PRADESH | 226017 | - | - | Rejected-Technical RENEWAL OF FIRM NOT UPLOADED |
| Sl No | Description | Qty | Unit | M/s Super Trading Corporation L2 | Baba Engineers and Contractors L3 | OJHA ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work or stone/boulder masonary built in cement mortar incl all quions arches, pillar or any other descrption etc complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | 1 | CUBIC METRE | 500 ₹500 | 500 ₹500 | 400 ₹400 |
| 2.00 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas,facia and similar suspended work including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | 1 | CUBIC METRE | 1,080 ₹1,080 | 500 ₹500 | 1,000 ₹1,000 |
| 3.00 | Demolition of Cement concrete unreinforced as in Ground Floor and paving n. exc. 15cm thick (above or below G.L.) complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | 4 | CUBIC METRE | 990 ₹3,960 | 200 ₹800 | 400 ₹1,600 |
| 4.00 | Taking down chowkhats or frames n.exc 1.5 sqm each (without taking off shutter from the frame) including dismantling brick work of hold fasts,cutting holes into brickwall and making good the dismantled portion in CM 1:3 or PCC 1:2:4 and removing from the site complete all as specified and directed by Engineer-in-Charge. | 15 | EACH | 225 ₹3,375 | 250 ₹3,750 | 300 ₹4,500 |
| 5.00 | Taking down chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each (without taking off shutter from the frame) including dismantling brick work of hold fasts,cutting holes into brickwall and making good the dismantled portion in CM 1:3 or PCC 1:2:4 and removing from the site complete all as specified and directed by Engineer-in-Charge. | 3 | EACH | 270 ₹810 | 400 ₹1,200 | 400 ₹1,200 |
| 6.00 | Taking down Chowkhats or frames exc 1.5 sq. m but n exc 4 sq.m each but with shutters (without taking off shutters from the frame) and refixing in the opening after necessary, complete all as specified and directed by Engineer-in-charge. | 3 | SQUARE METRE | 270 ₹810 | 400 ₹1,200 | 400 ₹1,200 |
| 7.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | 392 | SQUARE METRE | 39.6 ₹15,523.20 | 20 ₹7,840 | 50 ₹19,600 |
| 8.00 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | 60 | SQUARE METRE | 39.6 ₹2,376 | 30 ₹1,800 | 30 ₹1,800 |
| 9.00 | Cutting chases in brick wall, pinning in, making good to facings where required and pointing in cement mortar 1:3 to ends or edges of landings, steps, cills, sunshades, shelves, lintels, etc.; and cutting chases for concealed water tubing or concealed conduit wiring etc., and making good, cutting not exc 10 cm girth and complete all as specified and directed by Engineer-in-Charge. | 250 | RUNNING METRE | 81 ₹20,250 | 35 ₹8,750 | 90 ₹22,500 |
| 10.00 | Taking up or down steel tubing and connections of 15mm bore in pipe, including cleaning for re-fixing or removal from site to store complete all as specified and directed by Engineer-in-Charge. | 250 | RUNNING METRE | 18 ₹4,500 | 20 ₹5,000 | 30 ₹7,500 |
Updated dates
Tender Value
₹23.4 L
EMD Value
₹46,740
Closing Date
4 May 2026, 6:00 pmClosed
GE CHANDIGARH
GE CHANDIGARH N AREA OLD AIRPORT CHOWK CHANDIGARH 160003
GE CHD T 111 2025 26 ADDITION ALTERATION TO THE TOILETS AT ECHS POLYCLINIC CHANDIGARH
2026_MES_759273_1
GE/CHD/T-111/2025-26
Open Tender
Civil Works
180 days
CHANDIGARH
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE CHANDIGARH
₹46,740
Yes
26 May 2026
6 Apr 2026
6 May 2026
6 Apr 2026
4 May 2026
21 Apr 2026
7 Apr 2026 - 15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Demolition of brick work or stone/boulder masonary built in cement mortar incl all quions arches, pillar or any other descrption etc complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | - | CUBIC METRE | - | - | BI01010001010000000000000515BI0100001128 | |
Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas,facia and similar suspended work including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | - | CUBIC METRE | - | - | BI01010001010000000000000515BI0100001129 | |
Demolition of Cement concrete unreinforced as in Ground Floor and paving n. exc. 15cm thick (above or below G.L.) complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | - | CUBIC METRE | - | - | BI01010001010000000000000515BI0100001130 | |
Taking down chowkhats or frames n.exc 1.5 sqm each (without taking off shutter from the frame) including dismantling brick work of hold fasts,cutting holes into brickwall and making good the dismantled portion in CM 1:3 or PCC 1:2:4 and removing from the site complete all as specified and directed by Engineer-in-Charge. | - | EACH | - | - | BI01010001010000000000000515BI0100001131 | |
Taking down chowkhats or frames exc 1.5 sqm but n.exc 4 sqm each (without taking off shutter from the frame) including dismantling brick work of hold fasts,cutting holes into brickwall and making good the dismantled portion in CM 1:3 or PCC 1:2:4 and removing from the site complete all as specified and directed by Engineer-in-Charge. | - | EACH | - | - | BI01010001010000000000000515BI0100001132 | |
Taking down Chowkhats or frames exc 1.5 sq. m but n exc 4 sq.m each but with shutters (without taking off shutters from the frame) and refixing in the opening after necessary, complete all as specified and directed by Engineer-in-charge. | - | SQUARE METRE | - | - | BI01010001010000000000000515BI0100001133 | |
Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | - | SQUARE METRE | - | - | BI01010001010000000000000515BI0100001134 | |
Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge.
Note:- Debris will be disposed as per UT norms and Contractor will laise with UT athority for the same and rates quoted shall be deemed to include this aspect. | - | SQUARE METRE | - | - | BI01010001010000000000000515BI0100001135 | |
Cutting chases in brick wall, pinning in, making good to facings where required and pointing in cement mortar 1:3 to ends or edges of landings, steps, cills, sunshades, shelves, lintels, etc.; and cutting chases for concealed water tubing or concealed conduit wiring etc., and making good, cutting not exc 10 cm girth and complete all as specified and directed by Engineer-in-Charge. | - | RUNNING METRE | - | - | BI01010001010000000000000515BI0100001136 | |
Taking up or down steel tubing and connections of 15mm bore in pipe, including cleaning for re-fixing or removal from site to store complete all as specified and directed by Engineer-in-Charge. | - | RUNNING METRE | - | - | BI01010001010000000000000515BI0100001137 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
TENDER111.pdf
Tender Documents • 2.71 MB
BOQ_850454.xls
BOQ • 6.82 MB
Download all tender documents and submit your bid