| 1 | L1₹7.3 CrAdmitted-Finance | ₹7.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.6 Cr+₹1.4 Cr (18.9%)Admitted-Finance | ₹8.6 Cr+₹1.4 Cr (18.9%) | L2 | Admitted-Finance |
| 3 | L3₹8.7 Cr+₹1.4 Cr (19.4%)Admitted-Finance | ₹8.7 Cr+₹1.4 Cr (19.4%) | L3 | Admitted-Finance |
| 4 | L4₹9.4 Cr+₹2.2 Cr (30.1%)Admitted-Finance | ₹9.4 Cr+₹2.2 Cr (30.1%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Eligible |
| Sl No | Description | Qty | Unit | EIMSIM BABAS INFIRATRUCTURES L1 | M/s Millenium Builders L4 | Satwant Singh Contractor L2 | M/S HARISH GUPTA L3 |
|---|---|---|---|---|---|---|---|
| 1.00WBM- III, Primer Coat, Bituminious Macadam & Bituminous Concrete. | |||||||
| 1.10 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. | 5,574.52 | Cum | 1,600 ₹89,19,232 | 1,736 ₹96,77,366.72 | 1,450 ₹80,83,054 | 1,400 ₹78,04,328 Lowest |
| 1.20 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. | 91,562.63 | Sqm | 12 ₹10,98,751.56 Lowest | 50 ₹45,78,131.5 | 12 ₹10,98,751.56 Lowest | 19 ₹17,39,689.97 |
| 1.30 | Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction | 4,578.13 | Cum | 7,300 ₹3,34,20,349 Lowest | 9,500 ₹4,34,92,235 | 8,500 ₹3,89,14,105 | 8,500 ₹3,89,14,105 |
| 1.40 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | 1,03,579.88 | Sqm | 19 ₹19,68,017.72 | 16 ₹16,57,278.08 | 20 ₹20,71,597.6 | 15 ₹15,53,698.2 Lowest |
| 1.50 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects | 3,107.4 | Cum | 7,200 ₹2,23,73,280 Lowest | 10,000 ₹3,10,74,000 | 10,800 ₹3,35,59,920 | 10,900 ₹3,38,70,660 |
| 2.00Clearance of landslides | |||||||
| 2.10 | Clearance of landslides from km 0.000 to km 29.800 | 10,000 | Cum | 260 ₹26,00,000 | 320 ₹32,00,000 | 100 ₹10,00,000 | 90 ₹9,00,000 Lowest |
| 3.00Clearance of snow | |||||||
| 3.10 | Clearance of snow from km 0.000 to km 29.800 | 80,000 | Cum | 28 ₹22,40,000 | 10 ₹8,00,000 Lowest | 20 ₹16,00,000 | 24 ₹19,20,000 |
Tender Value
₹9.0 Cr
Closing Date
30 Jun 2021, 12:00 pmClosed
EXECUTIVE DIRECTOR (P)
RO-JAMMU, H. NO 261, SECTOR 6, CHANNI HIMMAT, JAMMU
Restoration and Repairs of NH244 from Goha km 0.000 to Khellani km 29.800 Total length 28.185 km in the UT of Jammu and Kashmir in the FY 2021-22
2021_NHIDC_633067_1
NHIDCL/RO(JMU)/NH-244 /Tenders/0-29.80/124/2021-22
Open Tender
Civil Works - Roads
Item Rate
270 days
Doda district
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
NHIDCL
Exempted
RO-JAMMU, JAMMU, JAMMU AND KASHMIR
16 Jul 2021
8 Jun 2021
1 Jul 2021
8 Jun 2021
30 Jun 2021
21 Jun 2021
8 Jun 2021 - 15 Jun 2021
16 Jun 2021
Amount
WBM- III, Primer Coat, Bituminious Macadam & Bituminous Concrete.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Clearance of landslides
Clearance of landslides from km 0.000 to km 29.800
Clearance of snow
Clearance of snow from km 0.000 to km 29.800
Satwant Singh Contractor
M/S HARISH GUPTA
M/s Millenium Builders
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
RFP.pdf
Tender Documents • 0.86 MB
BOQ_666239.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .