Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.1 LAccepted-AOC A 9 117 KALYANI PO KALYANI KALYANI NADIA WEST BENGAL 741235 | NADIA | WEST BENGAL | 741235 | ₹32.1 L Quoted ₹32.2 L | L1 | Accepted-AOC Successful Bidder |
| 2 | L2₹33.1 L+₹83,256.80 (2.58%)Rejected-Finance MAKARDHA PO MAKARDHA PS DOMJUR BANERJEEPARA WEST BENGAL 711409 | HOWRAH | WEST BENGAL | 711409 | ₹33.1 L+₹83,256.80 (2.58%) | L2 | Rejected-Finance Unsuccessful Bidder |
| 3 | L3₹33.8 L+₹1.6 L (4.94%)Rejected-Finance C O PULOKE NEOGI SURYA SEN PALLY PO KADAMTALA 734011 DIST DARJEELING WB | KADAMTALA | DARJEELING | WEST BENGAL | 734011 | ₹33.8 L+₹1.6 L (4.94%) | L3 | Rejected-Finance Unsuccessful Bidder |
| 4 | L4₹35.0 L+₹2.8 L (8.68%)Rejected-Finance VIVEKANANDA PALLY NEAR MARUTI TEA FACTORY P O BAGDGORA DIST DARJEELING | DARJEELING | WEST BENGAL | 734001 | ₹35.0 L+₹2.8 L (8.68%) | L4 | Rejected-Finance Unsuccessful Bidder |
| 5 | L5₹35.4 L+₹3.2 L (9.87%)Rejected-Finance 16 APC SARANI WARD NO 30 DESHBANDHUPARA PO SILIGURI TOWN DIST DARJEELING PIN 734004 WB | SILIGURI | DARJEELING | WEST BENGAL | 734004 | ₹35.4 L+₹3.2 L (9.87%) | L5 | Rejected-Finance Unsuccessful Bidder |
| Sl No | Description | Qty | Unit | M/S P K ROY AND CO L1 | SHRI SANJAY KUMAR GUPTA L8 | M/S Banerjee construction co L2 | MESSERS D S ENTERPRISE L6 | SHRI P P SHARMA L3 | SUNIL DAS AND CO L5 | ELECTRO COMMERCIAL CO L7 | M/s Prakash Traders L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M & L for cleaning and sterilization of inside overhead reservoir capacity 50000 gallons through bacteriological treatment complete all as specified and directed.1. First stage is to drain out the water by using wash out valve or high capacity dewatering system.2) Second stage is cleaning all the algae formation inside the tank and scrubbing the walls of the tank 3) Third stage is fresh water cleaning 4).Fourth stage is bacteria screening and using of Chlorine solution to kill all micro organisms. 5) Fifth stage is cleaning the floor of water tanr.6) Sixth stage is the second bacteria screening and sterilizing. 7) Seventh stage of cleaning is to sterilize the floor of the water tank by strong oxidizing agent. Lastly Flushing out the whole tank three times with chlorine and bleaching powder solution. Note- (i) Cost of staging and necessary working platform shall deemed to be included in quoted rate. Staging to be erected for every OH tank. (ii) Contractor shall ensure necessary safety precaution and insurance of working during execution (iii) The quoted rates shall be deemed to be included the cost of writing date of cleaning, due date and capacity of tank on the wall surface of the tank. | 8 | Each Job | 53,000 ₹4,24,000 Lowest | 58,420 ₹4,67,360 | 54,110 ₹4,32,880 | 58,856 ₹4,70,848 | 54,617 ₹4,36,936 | 54,850 ₹4,38,800 | 58,000 ₹4,64,000 | 53,000 ₹4,24,000 Lowest |
| 2.00 | All as per ser item No 1 above, but for tank capacity 40000 Gallons complete all as specified and directed. | 2 | Each Job | 45,800 ₹91,600 | 47,530 ₹95,060 | 45,740 ₹91,480 | 44,930 ₹89,860 Lowest | 46,770 ₹93,540 | 45,250 ₹90,500 | 47,000 ₹94,000 | 45,000 ₹90,000 |
| 3.00 | All as per ser item No 1 here-in-before, but for tank capacity 30000 Gallons complete all as specified and directed. | 4 | Each Job | 38,000 ₹1,52,000 Lowest | 44,425 ₹1,77,700 | 39,110 ₹1,56,440 | 44,117 ₹1,76,468 | 39,110 ₹1,56,440 | 40,125 ₹1,60,500 | 44,000 ₹1,76,000 | 42,000 ₹1,68,000 |
| 4.00 | All as per ser item No 1 here-in-before, but for tank capacity 20000 Gallons complete all as specified and directed. | 4 | Each Job | 27,000 ₹1,08,000 | 30,850 ₹1,23,400 | 27,610 ₹1,10,440 | 29,479 ₹1,17,916 | 28,210 ₹1,12,840 | 25,650 ₹1,02,600 Lowest | 30,000 ₹1,20,000 | 30,000 ₹1,20,000 |
| 5.00 | M & L for cleaning and sterilization of inside Underground reservoir capacity upto 25000 gallons. Dewatering of UG tank using DG set. Sludge removal by using buckets from inside of tanks. Scrubbing the inner surface and floor of tank. Flushing with chlorine and lime. Second time flushing with clean water. Cleaning of undergrowth in and around tank complete all as specified and directed. | 2 | Each Job | 33,500 ₹67,000 | 32,455 ₹64,910 | 33,610 ₹67,220 | 34,765 ₹69,530 | 34,790 ₹69,580 | 30,250 ₹60,500 Lowest | 32,000 ₹64,000 | 32,000 ₹64,000 |
| 6.00 | M & L for cleaning and sterilization of inside Underground reservoir capacity upto 15000 gallons. Dewatering of UG tank using DG set. Sludge removal by using buckets from inside of tanks. Scrubbing the inner surface and floor of tank. Flushing with chlorine and lime. second time flushing with clean water. Cleaning of undergrowth in and around tank complete all as specified and directed. | 30 | Each Job | 28,000 ₹8,40,000 Lowest | 34,490 ₹10,34,700 | 28,310 ₹8,49,300 | 31,512 ₹9,45,360 | 28,116 ₹8,43,480 | 31,250 ₹9,37,500 | 35,000 ₹10,50,000 | 33,500 ₹10,05,000 |
| 7.00 | M & L for cleaning and sterilization of inside Underground reservoir capacity upto 15000 gallons. Dewatering of UG tank using DG set. Sludge removal by using buckets from inside of tanks. Scrubbing the inner surface and floor of tank. Flushing with chlorine and lime. Second time flushing with clean water. Cleaning of undergrowth in and around tank complete all as specified and directed. | 18 | Each Job | 17,700 ₹3,18,600 | 21,410 ₹3,85,380 | 17,910 ₹3,22,380 | 21,347 ₹3,84,246 | 17,669 ₹3,18,042 | 17,650 ₹3,17,700 Lowest | 20,100 ₹3,61,800 | 20,100 ₹3,61,800 |
| 8.00 | Excavation in trenches in soft / loose soil n.exc 1.5 mtr wide n.exc 1.5 mtr deep getting out soil complete all as specified and directed. | 110 | Cum | 480 ₹52,800 | 530 ₹58,300 | 477 ₹52,470 | 519 ₹57,090 | 517 ₹56,870 | 495 ₹54,450 | 510 ₹56,100 | 460 ₹50,600 Lowest |
| 9.00 | Returning filling in including spreading levelling well ramming in layers n.exc 25 cm thick in a layers complete all as specified and directed. | 100 | Cum | 170 ₹17,000 Lowest | 235 ₹23,500 | 183 ₹18,300 | 234 ₹23,400 | 189 ₹18,900 | 185 ₹18,500 | 210 ₹21,000 | 170 ₹17,000 Lowest |
| 10.00 | Removing excavated material (Soil) n.exc 50 mtr and depositing where directed at a level n.exc 1.5 mtr above the starting point complete all as specified and directed. | 10 | Cum | 250 ₹2,500 | 284 ₹2,840 | 263 ₹2,630 | 244 ₹2,440 | 247 ₹2,470 | 195 ₹1,950 Lowest | 240 ₹2,400 | 230 ₹2,300 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
18 Aug 2026, 6:00 pmClosed
GE (AF) Bagdogra
GE AF Bagdogra Bagdogra Airport PO, Dist Darjeeling, WB - 734421
REPAIR/ REPLACEMENT OF WATER LEVEL INDICATORS, CLEANING OF RCC OH TANK AND CONNECTED WORKS AT 20 WING AFS BAGDOGRA UNDER GE (AF) BAGDOGRA
2026_MES_762066_2
8697/E8
Open Tender
Civil Works
Item Rate
270 days
GE (AF) Bagdogra
AS per NIT
10 documents required · 10 mandatory
₹500
GE (AF) Bagdogra
₹60,000
Yes
14 Sept 2026
4 Aug 2026
20 Aug 2026
4 Aug 2026
18 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M & L for cleaning and sterilization of inside overhead reservoir capacity 50000 gallons through bacteriological treatment complete all as specified and directed.1. First stage is to drain out the water by using wash out valve or high capacity dewatering system.2) Second stage is cleaning all the algae formation inside the tank and scrubbing the walls of the tank 3) Third stage is fresh water cleaning 4).Fourth stage is bacteria screening and using of Chlorine solution to kill all micro organisms. 5) Fifth stage is cleaning the floor of water tanr.6) Sixth stage is the second bacteria screening and sterilizing. 7) Seventh stage of cleaning is to sterilize the floor of the water tank by strong oxidizing agent. Lastly Flushing out the whole tank three times with chlorine and bleaching powder solution. Note- (i) Cost of staging and necessary working platform shall deemed to be included in quoted rate. Staging to be erected for every OH tank. (ii) Contractor shall ensure necessary safety precaution and insurance of working during execution (iii) The quoted rates shall be deemed to be included the cost of writing date of cleaning, due date and capacity of tank on the wall surface of the tank. | 8 | Each Job | - | - |
| 2 | All as per ser item No 1 above, but for tank capacity 40000 Gallons complete all as specified and directed. | 2 | Each Job | - | - |
| 3 | All as per ser item No 1 here-in-before, but for tank capacity 30000 Gallons complete all as specified and directed. | 4 | Each Job | - | - |
| 4 | All as per ser item No 1 here-in-before, but for tank capacity 20000 Gallons complete all as specified and directed. | 4 | Each Job | - | - |
| 5 | M & L for cleaning and sterilization of inside Underground reservoir capacity upto 25000 gallons. Dewatering of UG tank using DG set. Sludge removal by using buckets from inside of tanks. Scrubbing the inner surface and floor of tank. Flushing with chlorine and lime. Second time flushing with clean water. Cleaning of undergrowth in and around tank complete all as specified and directed. | 2 | Each Job | - | - |
| 6 | M & L for cleaning and sterilization of inside Underground reservoir capacity upto 15000 gallons. Dewatering of UG tank using DG set. Sludge removal by using buckets from inside of tanks. Scrubbing the inner surface and floor of tank. Flushing with chlorine and lime. second time flushing with clean water. Cleaning of undergrowth in and around tank complete all as specified and directed. | 30 | Each Job | - | - |
| 7 | M & L for cleaning and sterilization of inside Underground reservoir capacity upto 15000 gallons. Dewatering of UG tank using DG set. Sludge removal by using buckets from inside of tanks. Scrubbing the inner surface and floor of tank. Flushing with chlorine and lime. Second time flushing with clean water. Cleaning of undergrowth in and around tank complete all as specified and directed. | 18 | Each Job | - | - |
| 8 | Excavation in trenches in soft / loose soil n.exc 1.5 mtr wide n.exc 1.5 mtr deep getting out soil complete all as specified and directed. | 110 | Cum | - | - |
| 9 | Returning filling in including spreading levelling well ramming in layers n.exc 25 cm thick in a layers complete all as specified and directed. | 100 | Cum | - | - |
| 10 | Removing excavated material (Soil) n.exc 50 mtr and depositing where directed at a level n.exc 1.5 mtr above the starting point complete all as specified and directed. | 10 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tender8697.pdf
Tender Documents • 1.36 MB
BOQ_876819.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .