| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.4 Cr+₹11.1 L (8.47%)Admitted-Finance WZ 143 A 7A S 4 43 GALI NO 2 OLD MAHAVIR NAGAR NEW DELHI 110018 | WEST DELHI | DELHI | 110018 | L2 | Admitted-Finance | |
| 3 | L3₹1.5 Cr+₹19.2 L (14.6%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AMIT ASSOCIATES L1 | Parveen Builders L3 | M/S Sunil Steel Works L2 |
|---|---|---|---|---|---|---|
| 1.00Schedule 'A' Section-I under Ser No. 2.00 prepriced by MES on DSR - 2021 | ||||||
| 2.00 | Lump sum price worked out by the Contractor for "BUILDING WORK" as listed in Schedule 'A' Section-I. | 1 | Each Block | 67,55,000 ₹67,55,000 Lowest | 84,00,000 ₹84,00,000 | 72,68,000 ₹72,68,000 |
| 3.00 | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Section-II. | 1 | Each | 1,89,898 ₹1,89,898 Lowest | 2,00,000 ₹2,00,000 | 2,06,000 ₹2,06,000 |
| 4.00 | Lump sum price worked out by the Contractor for “HARDSTANDING” as listed in Schedule ‘A’ Section-III. | 1 | Each | 5,35,900 ₹5,35,900 Lowest | 5,50,000 ₹5,50,000 | 6,06,000 ₹6,06,000 |
| 5.00 | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Section-IV. | 1 | Each | 2,70,650 ₹2,70,650 | 2,00,000 ₹2,00,000 Lowest | 2,60,000 ₹2,60,000 |
| 6.00 | Lump sum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Section-V. | 1 | Each | 9,73,136 ₹9,73,136 | 8,00,000 ₹8,00,000 Lowest | 9,10,000 ₹9,10,000 |
| 7.00 | Lump sum price worked out by the Contractor for “COMPOUNDWALL” as listed in Schedule ‘A’ Section-VI. | 1 | Each | 4,69,910 ₹4,69,910 | 4,00,000 ₹4,00,000 | 3,90,000 ₹3,90,000 Lowest |
| 8.00 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Section-VII. | 1 | Each | 2,36,400 ₹2,36,400 | 2,00,000 ₹2,00,000 Lowest | 2,10,000 ₹2,10,000 |
| 9.00 | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Section-VIII. | 1 | Each | 1,95,903 ₹1,95,903 Lowest | 2,00,000 ₹2,00,000 | 2,10,000 ₹2,10,000 |
| 10.00 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Section-IX. | 1 | Each | 5,31,750 ₹5,31,750 Lowest | 5,50,000 ₹5,50,000 | 6,60,000 ₹6,60,000 |
Tender Value
₹1.2 Cr
EMD Value
₹2.0 L
Closing Date
3 Sept 2026, 6:00 pmClosed
Chief Engineer (RnD) Delhi
HQ Chief Engineer (RnD) Probyn Road, Timarpur Delhi-110054
PROVN OF 01 NO TYPE VI ACCN AT TIMARUR UNDER GE (I) RnD DELHI
2026_MES_771552_1
CE RnD/DLI-08/DLI/2026-27
Open Tender
Civil Works
Lump-sum
365 days
Delhi
as per tender documents
8 documents required · 8 mandatory
₹1,000
GE (I) RnD Delhi
₹2.0 L
Yes
18 Sept 2026
11 Jun 2026
10 Sept 2026
11 Jun 2026
3 Sept 2026
20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Schedule 'A' Section-I under Ser No. 2.00 prepriced by MES on DSR - 2023 | - | - | - | - |
| 2 | Lump sum price worked out by the Contractor for "BUILDING WORK" as listed in Schedule 'A' Section-I. | 1 | Each Block | 76,35,260 | ₹76,35,260 |
| 3 | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Section-II. | 1 | Each | 2,31,285.31 | ₹2,31,285.31 |
| 4 | Lump sum price worked out by the Contractor for “HARDSTANDING” as listed in Schedule ‘A’ Section-III. | 1 | Each | 6,89,740.05 | ₹6,89,740.05 |
| 5 | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Section-IV. | 1 | Each | 3,05,129.75 | ₹3,05,129.75 |
| 6 | Lump sum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Section-V. | 1 | Each | 9,84,996.85 | ₹9,84,996.85 |
| 7 | Lump sum price worked out by the Contractor for “COMPOUNDWALL” as listed in Schedule ‘A’ Section-VI. | 1 | Each | 5,61,340.49 | ₹5,61,340.49 |
| 8 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Section-VII. | 1 | Each | 2,46,107 | ₹2,46,107 |
| 9 | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Section-VIII. | 1 | Each | 2,16,903.56 | ₹2,16,903.56 |
| 10 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Section-IX. | 1 | Each | 6,81,955.51 | ₹6,81,955.51 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.32 MB
TDR.pdf
Tender Documents • 2.22 MB
BOQ_864033.xls
BOQ • 0.34 MB
Drawings.pdf
Additional Documents • 22.85 MB
Scheduleofcredit.pdf
Additional Documents • 0.26 MB
corri06dli08.pdf
PDF • 0.53 MB
Corri05DLI08.pdf
PDF • 0.53 MB
Corri04DLI08.pdf
PDF • 0.53 MB
CORRI03DLI08.pdf
PDF • 0.53 MB
coori02dli08.pdf
PDF • 0.53 MB
Corri01DLI08.pdf
PDF • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .