Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45.1 LAdmitted-Finance | -34.34% | ₹45.1 L | L1 | Admitted-Finance |
| 2 | L2₹50.0 LAdmitted-Finance | -27.27% | ₹50.0 L | L2 | Admitted-Finance |
| 3 | L3₹55.6 LAdmitted-Finance LAKHOTIYA CHOWK BIKANER BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | -19.10% | ₹55.6 L | L3 | Admitted-Finance |
| 4 | L4₹59.1 LAdmitted-Finance | -14.00% | ₹59.1 L | L4 | Admitted-Finance |
Tender Value
₹68.7 L
EMD Value
₹1.4 L
Closing Date
19 Jan 2026, 3:00 pmClosed
EXECUTIVE ENGINEER CD-VIII
OFFICE OF THE EXECUTIVE ENGINEER CD-VIII IFC DEPTT. SECTOR 15 ROHINI DELHI
Desilting of Kirari Suleman Nagar drain from RD 4150 M 6090 M by deploying pocklain machine, disposal and maintenance of drain for period of 07 (Seven) Months.
2026_IFC_284724_1
EE/CD-VIII/NIT/2025-26/57
Open Tender
Civil Works
210 days
DELHI
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.4 L
20 Jan 2026
12 Jan 2026
19 Jan 2026
12 Jan 2026
19 Jan 2026
12 Jan 2026
Desilting /removal of silt/earth/manure/sludge etc. from the bed of Kirari Suleman Nagar Drain in entire width of Kirari Suleman Nagar Drain including in or under foul condition upto desired level as per direction of Engineer -in-Charge by deploying pocklain machine & disposal of same with in land boundary as per direction of Engineer incharge, as and when required.
Hiring Tractor Trolly on per day basis including loading unloading & stacking up to 3 KM lead as per direction of Engineer-in-charge.
Disposal of silt similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to SLF site for lead upto 10 km for all lifts, complete as per directions of Engineer-in-Charge.
Maintenance of Kirari Suleman Nagar Drain from RD 4150 M to RD 6090 M for the period of 1 month by removing all type of rubbish, rank vegetation, garbage, polythene bags, patera, hyacinth etc. complete cleaning along with other floating material from the bed of drain above water level, cleaning of side slopes and top of the both banks by deploying mechanical means(hydraulic excavator 3D)/ manual means it should be ensured cleaning of drain during full month in or under water as well as in foul condition including Kassi, Panji etc. and disposal of above removed material within a lead 50m lead from the periphery of drain area cleared as per direction of Engineer-In-Charge.
2nd Month
3rd Month
4th Month
5th Month
6th Month
7th Month
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Tendernotice_2.pdf
PDF • 0.32 MB
BOQ_376587.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid