Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.1 LAccepted-AOC A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | L1 | Accepted-AOC L1 | |
| 2 | L2₹85.9 L+₹11.7 L (15.8%)Rejected-Finance 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | ARTIST BRO L1 | M/S Harish Kumar Contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift and 30 metre lead with back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of all labour, T & P etc but excluding cost of dewatering . The earth from cutting or excavation to be used in making embankment or to be deposited as spoil bank within 30 metre distance as directed by Engineer-in- charge. | 1,814.09 | Cum | 140 ₹2,53,972.6 | 50 ₹90,704.5 Lowest |
| 2.00 | Providing & Laying of C.C M10 i.e. 1:3:6 including all cost of coarse sand , coarse aggregate of 20 mm to 40 mm size, labour and T&P etc. required for proper completion of work. | 68.61 | Cum | 4,500 ₹3,08,745 Lowest | 5,000 ₹3,43,050 |
| 3.00 | Providing & Laying of C.C M15 i.e. 1:2:4 including all cost of coarse sand , coarse aggregate of 10 mm to 20 mm size, labour and T&P etc. required for proper completion of work. | 67.73 | Cum | 4,550 ₹3,08,171.5 Lowest | 5,200 ₹3,52,196 |
| 4.00 | Providing & Laying of C.C M20 i.e. 1:1.5:3 including all cost of coarse sand , coarse aggregate of 10 mm to 20 mm size, labour and T&P etc. required for proper completion of work. | 189.52 | Cum | 4,600 ₹8,71,792 Lowest | 6,000 ₹11,37,120 |
| 5.00 | Providing & Laying of R.C.C M25 i.e. 1:1:2 including all cost of coarse sand , coarse aggregate of 10 mm to 20 mm size, labour and T&P etc. ( but excluding cost of steel) required for proper completion of work. | 286.47 | Cum | 4,650 ₹13,32,085.5 Lowest | 6,500 ₹18,62,055 |
| 6.00 | Centring & Shuttering for C.C work including cost of all labour and T&P etc. required for proper completion of work. | 304.38 | Sqm | 400 ₹1,21,752 Lowest | 400 ₹1,21,752 Lowest |
| 7.00 | Centring & Shuttering for R.C.C work including cost of all labour and T&P etc. required for proper completion of work. | 642.7 | Sqm | 450 ₹2,89,215 Lowest | 500 ₹3,21,350 |
| 8.00 | Furnishing and placing steel reinforcement including cutting, bending, binding and placing in position including cost of all material, labour and T&P for proper for proper completion of work. | 36.26 | MT | 45,000 ₹16,31,700 Lowest | 70,000 ₹25,38,200 |
| 9.00 | Providing & Fixing, cutting, bending, branzing and crimping 690 mm wide 20 SWG of U-type Stainless Steel seal or Copper seal (Dimond seal) as approved shape and size required for proper completion of work including cost of materials, labour, T&P, etc for proper completion of work. | 18.5 | Rmtr | 5,000 ₹92,500 | 2,000 ₹37,000 Lowest |
| 10.00 | Providing & Laying tarfelt two coat in bottom of slab including cost of all labour and T&P etc. required for proper completion of work. | 7.8 | Sqm | 350 ₹2,730 | 200 ₹1,560 Lowest |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
17 Oct 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of The SE 3rd Circle Irrigation Works, Agra
Construction of New Bridge at Km. 8.400 of Kosi Dy. in Kosi-Kotvan Industrial Estate (Extension-1) in Distt. Mathura
2026_UPIDC_1195563_2
13/SE/2026-27
Open Tender
Civil Works
Item Rate
92 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
₹2.1 L
Office of The SE 3rd Circle Irrigation Works, Agra
7 Nov 2026
12 Oct 2026
17 Oct 2026
12 Oct 2026
17 Oct 2026
12 Oct 2026
14 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift and 30 metre lead with back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of all labour, T & P etc but excluding cost of dewatering . The earth from cutting or excavation to be used in making embankment or to be deposited as spoil bank within 30 metre distance as directed by Engineer-in- charge. | 1,814.09 | Cum | - | - |
| - | Providing & Laying of C.C M10 i.e. 1:3:6 including all cost of coarse sand , coarse aggregate of 20 mm to 40 mm size, labour and T&P etc. required for proper completion of work. | 68.61 | Cum | - | - |
| - | Providing & Laying of C.C M15 i.e. 1:2:4 including all cost of coarse sand , coarse aggregate of 10 mm to 20 mm size, labour and T&P etc. required for proper completion of work. | 67.73 | Cum | - | - |
| - | Providing & Laying of C.C M20 i.e. 1:1.5:3 including all cost of coarse sand , coarse aggregate of 10 mm to 20 mm size, labour and T&P etc. required for proper completion of work. | 189.52 | Cum | - | - |
| - | Providing & Laying of R.C.C M25 i.e. 1:1:2 including all cost of coarse sand , coarse aggregate of 10 mm to 20 mm size, labour and T&P etc. ( but excluding cost of steel) required for proper completion of work. | 286.47 | Cum | - | - |
| - | Centring & Shuttering for C.C work including cost of all labour and T&P etc. required for proper completion of work. | 304.38 | Sqm | - | - |
| - | Centring & Shuttering for R.C.C work including cost of all labour and T&P etc. required for proper completion of work. | 642.7 | Sqm | - | - |
| - | Furnishing and placing steel reinforcement including cutting, bending, binding and placing in position including cost of all material, labour and T&P for proper for proper completion of work. | 36.26 | MT | - | - |
| - | Providing & Fixing, cutting, bending, branzing and crimping 690 mm wide 20 SWG of U-type Stainless Steel seal or Copper seal (Dimond seal) as approved shape and size required for proper completion of work including cost of materials, labour, T&P, etc for proper completion of work. | 18.5 | Rmtr | - | - |
| - | Providing & Laying tarfelt two coat in bottom of slab including cost of all labour and T&P etc. required for proper completion of work. | 7.8 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
PulTechnicalLOT_2.pdf
Tender Documents • 2.13 MB
BOQ_2257940.xls
BOQ • 4.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .