| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC 319 A MEERAPUR PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹8.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.7 LRejected-AOC B 708 NEO HIGHTS DR LOHIA MARG CIVIL LINES PRAYAGRAJ PRAYAGRAJ PRAYAGRAJ UTTAR PRADESH 211001 UDYAM UP 03 0077658 | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹9.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹12.3 LRejected-AOC | ₹12.3 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | GANGOTRI CONSTRUCTION L3 | R.S.ASSOCIATE L1 | Marc vision infrasolutions pvt. ltd. L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation of damaged Random Rubble stone massonary work and soil bump including the cost of excavation, all material and labour. | 128 | M3 | 100 ₹12,800 | 770 ₹98,560 | 600 ₹76,800 |
| 2.00 | Manually Breaking of revetment wall of south side upto length of 10.3 mtr so that new revetment wall can be made of appropriate length. | 1 | Job | 15,000 ₹15,000 | 3,500 ₹3,500 | 5,000 ₹5,000 |
| 3.00 | Laying of Bottom pad (leane concreting) in thickness of 50mm brick/stone ballast coarse sand and cement in ratio 1:3:6 including cost of all material and labour. | 4.92 | M3 | 3,500 ₹17,220 | 2,380 ₹11,709.60 | 3,400 ₹16,728 |
| 4.00 | 1st class R. R. stonemasonry work with stone. Size of stone should be between 6 to 8" of standard as per technical specification for this type of work in 1:6 cement, coarse sand of mortar for construction of platform in thickness of 0.23 Mtr & revetment wall including excavation of ordinary soil for revetment wall and making weep holes providing plastic pipe of required length (cost including the cost of cutting of plastic pipe in accordance size and fitting them in two layers at the span of 2.0 meter at depth of 0.5 meter, 1.25 meter and 2.0 meter, respectively from the top of the revetment wall.) including the cost of all material and labour. | 259.88 | M3 | 4,500 ₹11.7 L | 2,940 ₹7.6 L | 3,300 ₹8.6 L |
| 5.00 | Cement concrete with 20mm stone ballast, coarse sand and cement in ratio of 1:2:4 on the top platform of the foundation including all material, labour and T&P etc required for completion of work satisfactory as per technical specification & drawing Top seal cover construction cement concreting including cost of all material and labour charge. | 0.43 | M3 | 5,100 ₹2,203.20 | 5,390 ₹2,328.48 | 7,000 ₹3,024 |
| 6.00 | Backfilling and gap levelling under floor and in area for the revetment of the towers including the cost of earth to be obtained from outside including watering, ramming in 200mm layers and dressing of earth etc complete including the cost of earth royalty, taxes, skilled labour and T&P including all leads as per technical specification. | 108 | M3 | 110 ₹11,880 | 56 ₹6,048 | 80 ₹8,640 |
Tender Value
₹12.7 L
EMD Value
₹13,000
Closing Date
23 Jun 2025, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj.
11/ETC-II(P)/2025-2026
2025_UPTCL_1047017_1
11/ETC-II(P)/2025-2026
Open Tender
Electrical Works
90 days
ETD-II PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer Electy. Trans. Div. Naini Alld.
₹13,000
3 Jun 2026
10 Jun 2025
24 Jun 2025
10 Jun 2025
23 Jun 2025
10 Jun 2025
Amount
Excavation of damaged Random Rubble stone massonary work and soil bump including the cost of excavation, all material and labour.
Manually Breaking of revetment wall of south side upto length of 10.3 mtr so that new revetment wall can be made of appropriate length.
Laying of Bottom pad (leane concreting) in thickness of 50mm brick/stone ballast coarse sand and cement in ratio 1:3:6 including cost of all material and labour.
1st class R. R. stonemasonry work with stone. Size of stone should be between 6 to 8" of standard as per technical specification for this type of work in 1:6 cement, coarse sand of mortar for construction of platform in thickness of 0.23 Mtr & revetment wall including excavation of ordinary soil for revetment wall and making weep holes providing plastic pipe of required length (cost including the cost of cutting of plastic pipe in accordance size and fitting them in two layers at the span of 2.0 meter at depth of 0.5 meter, 1.25 meter and 2.0 meter, respectively from the top of the revetment wall.) including the cost of all material and labour.
Cement concrete with 20mm stone ballast, coarse sand and cement in ratio of 1:2:4 on the top platform of the foundation including all material, labour and T&P etc required for completion of work satisfactory as per technical specification & drawing Top seal cover construction cement concreting including cost of all material and labour charge.
Backfilling and gap levelling under floor and in area for the revetment of the towers including the cost of earth to be obtained from outside including watering, ramming in 200mm layers and dressing of earth etc complete including the cost of earth royalty, taxes, skilled labour and T&P including all leads as per technical specification.
Marc vision infrasolutions pvt. ltd. (BID ID -5255073)
GANGOTRI CONSTRUCTION (BID ID -5255258)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid