| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | Rejected-Technical | - | Rejected-Technical Hightest Qutation |
| Sl No | Description | Qty | Unit | MAX SAFETY L1 | M/s HEALTH CARE TECHNOLOGY L2 |
|---|---|---|---|---|---|
| 1.00 | Collection,supply and filling of Well gravel from approved quarry to work site and stocking to the Departmental gauge for premeasurement as directed by the Departmental Engineer, to required depth not more than 15cm depth including cost and Conveyance of gravel to site and all labour charges for filling etc., Complete complying with Standard Specification as per clause MORTH 30 Specification.( Road edge packing ) | 32.43 | 1m3 (one cubic meter) | 381.5 ₹12,372.05 Lowest | 382 ₹12,388.26 |
| 2.00 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401. | 47 | 1m3 (one cubic meter) | 2,397 ₹1,12,659 Lowest | 2,399 ₹1,12,753 |
| 3.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including premixing the materials with waterat OMC in mechnanical mix plant carriage of mixed material by tipper to site laying inuniform layers with paver sin Sub Base/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 94 | 1m3 (one cubic meter) | 2,674 ₹2,51,356 Lowest | 2,675 ₹2,51,450 |
| 4.00 | Providing and laying of prime coat using bitumen emulsion (SSI RC Drum) at the rate of 7 kg per 10sqm over the WMM surface preparatory to another construction over it. as per as per standar specification MORTH V | 940 | 1m2 (one Squre meter) | 78.5 ₹73,790 Lowest | 79 ₹74,260 |
| 5.00 | Providing and laying of tack coat using Bitumen Emulsion (RS1) at the rate of 2.5 kg per 10sqm over the WMM primed surface preparatory to another construction over it.as per as per standar specification MORTH V | 940 | 1m2 (one Squre meter) | 17.3 ₹16,262 Lowest | 17.5 ₹16,450 |
| 6.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 47 | 1m3 (one cubic meter) | 10,175 ₹4,78,225 Lowest | 10,180 ₹4,78,460 |
| 7.00 | Providing and laying Bituminous Concrete 30 mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.02 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 28.2 | 1m3 (one cupic meter) | 10,680 ₹3,01,176 Lowest | 10,700 ₹3,01,740 |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
22 Aug 2024, 3:00 pmClosed
Executive Officer, melpattampakkam
No.1, Compost Street, Town panchayat Office, Melpattampakkam
Providing BT Road at Ward no -15 Karbaga vinayagar Nagar in melpattampakkam town panchayat
2024_DTP_474181_1
140/2023/A1
Open Tender
Civil Works - Roads
Works
60 days
Melpattampakkam Town panchayat
Providing BT Road at Ward no -15 Karbaga vinayagar Nagar in melpattampakkam town panchayat
2 documents required · 2 mandatory
₹0
₹15,000
3 Feb 2026
17 Aug 2024
22 Aug 2024
17 Aug 2024
22 Aug 2024
17 Aug 2024
17 Aug 2024 - 22 Aug 2024
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .