| 1 | Admitted-Fee/PreQual/Technical/Finance SF NO 348 5 TIRUPUR TO UDUMALAI ROAD GUDIMANGALAM | TIRUPPUR | TAMIL NADU | 638051 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
24 Jul 2025, 5:05 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer(B.Pt), Vasudevanallur
Block Development Office, Vasudevanallur
Construction of Cremation Shed and Water Tup Pipeline arrangement in Paraipatti Village and Nelkattumseval Pt
2025_RDTN_583707_3
BDOVSR/289/2024-A2/GF
Open Tender
Civil Works
Works
180 days
Vasudevanallur
As per Tender Doc
2 documents required · 2 mandatory
₹0
₹8,000
Yes
24 Jul 2025
19 Jul 2025
24 Jul 2025
19 Jul 2025
24 Jul 2025
19 Jul 2025
Amount
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Filling with excavated earth including watering & Ramming etc., Complete.
Supplying and filling with sand including all cost and conveyance and labour charges for watering & Ramming etc., Complete
Random Rubble Masinry in cm 1:5 mix using required bond stone with simultaneour pointing including all labour charges
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 100CFT
centering charges for all concrete works including all const and conveyance and all labour charges etc., complete.
Upto Basement
Above Basement
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finighing the jounts smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. it shall then be sand papered. to give a smooth and even surface.,
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
Finishing the top of roof with one course of machine pressed tiles of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound and top pointing with same oiled mortar including all cost and conveyance of all materials and labour charges etc. complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Distembering two two coats with best quality approved colour of oil bound distemer over one coat of cement paint primer including cost and convyance of all materials to work site and labour charges etc., complete.
Exterior Emulsion using best quality and approved cement paint over one coat of cement paint primer including cost and convyance of all materials to work site and labour charges etc., complete.
Supplying and fixing with RCC precast slabs 50mm thick for chimney cover slab etc., complete
SUB Estimate Water Tub
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 100CFT
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
SUB Estimate Pipe Line
Supply and Delivery of 75 mm PVC Pipe 6KSC
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Refilling excavated earth including all cost
Laying of PVC rigid pipes with lead of 200m lowering into trench, laying in proper grade, alignment, jointing PVC coupler with specials and tested to the required pressure including conveyance of water upto 1km lead during the testing.
Karthik (BID ID -1411381)
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .