| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹32.4 LAccepted-AOC | ₹32.4 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹36.5 L+₹4.1 L (12.8%)Rejected-Finance | ₹36.5 L+₹4.1 L (12.8%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹37.1 L+₹4.8 L (14.8%)Rejected-Finance | ₹37.1 L+₹4.8 L (14.8%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹37.5 L+₹5.2 L (15.9%)Rejected-Finance 2921 NEW SUNNY ENCLAVE SECTOR 123 S A S NAGAR MOHALI MOHALI PUNJAB MOHALI PUNJAB 140301 UDYAM PB 20 0069759 03OQWPS9597G1ZE B R | S A S NAGAR | PUNJAB | 140301 | ₹37.5 L+₹5.2 L (15.9%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹40.4 L+₹8.1 L (24.9%)Rejected-Finance | ₹40.4 L+₹8.1 L (24.9%) | L-5 | Rejected-Finance L-5 |
Tender Value
₹42.2 L
EMD Value
₹52,800
Closing Date
3 Apr 2024, 5:00 pmClosed
OFFICE OF STAFF OFFICER CIVIL MCL LAKHANPUR AREA
GM OFFICE MCL LAKHANPUR AREA
DGPS Survey of safety Zone of Integrated Lakhanpur Belpahar Lilari OCP (40MTY) at LKP OCP/LKPA
2024_MCL_305719_1
MCL/GM/LKPA/SOC/23-24/157/1432 DT20.03.24
Open Tender
Civil Works - Others
Item Rate
120 days
GM OFFICE MCL LAKHANPUR AREA
As per NIT
4 documents required · 4 mandatory
₹52,800
15 May 2024
22 Mar 2024
5 Apr 2024
22 Mar 2024
3 Apr 2024
22 Mar 2024
22 Mar 2024 - 27 Mar 2024
Amount
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu- ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
Study of Geo coordinates of SZ Boundary coordinates
DGPS survey covering the following-Establishment of ground control point for DGPS of safety zone area
Printing of the maps including submission of soft copy
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Areal Constructions & Geo-India Services
SD Engineering
Global Business Solutions
CONSULTANCY FOR ENGINEERING AND ENVIRONMENTPLANNING
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .