Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹12.4 L (11.0%)Admitted-Finance | ₹1.3 Cr+₹12.4 L (11.0%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹21.9 L (19.4%)Admitted-Finance | ₹1.3 Cr+₹21.9 L (19.4%) | L3 | Admitted-Finance |
| 4 | L4₹1.7 Cr+₹54.9 L (48.6%)Admitted-Finance | ₹1.7 Cr+₹54.9 L (48.6%) | L4 | Admitted-Finance |
| 5 | L5₹2.0 Cr+₹87.0 L (77.0%)Admitted-Finance 104 FIRST FLOOR LSC NATIONAL ARCADE GHAZIPUR MAIN ROAD GHAZIPUR MAIN ROAD GHAZIPUR EAST DELHI DELHI 110096 | EAST DELHI | DELHI | 110096 | ₹2.0 Cr+₹87.0 L (77.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KUKREJA ENGINEERS L3 | Neometrix Engineering Private Limited L5 | NAVODAYA INFRASTRUCTURE NIRMAN PVT LTD L1 | VED KUMAR SHARMA CONTRACTOR L2 | NEERAJ GROUP OF INDUSTRIES L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Multimode Microplate Reader | ||||||||
| 1.01 | Block – A
Fabrication of SFTRC Roof Blocks M-45 as per scope of work as per Annexure A and drawing Annexure Á-1
3000 mm x 3000 mm x 300 mm | 7 | Nos. | 20,30,000 ₹22,73,600 | 13,73,750 ₹14,42,437.5 Lowest | 15,75,000 ₹17,64,000 | 13,30,002.59 ₹14,89,602.9 | 24,85,000 ₹27,83,200 |
| 2.01 | Block – B
Fabrication of SFTRC Stopper Blocks M-45 as per scope of work as per Annexure A and drawing Annexure Á-2
9000 mm x 2000 mm x 300 mm | 7 | Nos. | 36,05,000 ₹40,37,600 | 20,26,500 ₹21,27,825 Lowest | 28,00,000 ₹31,36,000 | 31,50,002.59 ₹35,28,002.9 | 39,89,849.99 ₹44,68,631.99 |
| 3.01 | Block – C
Fabrication of SFTRC Back Walls M-45 as per scope of work as per Annexure A and drawing Annexure Á-3
2600 mm x 1500 mm x 300 mm | 11 | Nos. | 9,02,000 ₹10,10,240 | 8,30,225 ₹8,71,736.25 | 7,15,000 ₹8,00,800 Lowest | 12,65,004.07 ₹14,16,804.56 | 17,60,000 ₹19,71,200 |
| 4.01 | Block – D
Fabrication of RCC Pendine Blocks M-45 as per scope of work as per Annexure A and drawing Annexure Á-4
1200 mm x 600 mm x 600 mm | 300 | Nos. | 33,00,000 ₹36,96,000 | 76,68,000 ₹80,51,400 | 28,65,000 ₹32,08,800 | 28,50,111 ₹31,92,124.32 Lowest | 29,55,000 ₹33,09,600 |
| 5.01 | I Beam Structure – E
I-beam as per scope of work as per Annexure A and drawing Annexure Á-5
Structure as per Annexure Á-5 | 6 | Nos. | 12,00,000 ₹13,44,000 Lowest | 56,40,000 ₹59,22,000 | 12,00,000 ₹13,44,000 Lowest | 14,10,002.22 ₹15,79,202.49 | 27,00,000 ₹30,24,000 |
| 6.01 | Box Structure – F as per scope of work as per Annexure A and drawing Annexure Á-6
6 m x 6 m Annexure Á-6 | 2 | Nos. | 10,00,000 ₹11,20,000 | 15,00,000 ₹15,75,000 | 9,30,000 ₹10,41,600 Lowest | 11,89,982 ₹13,32,779.84 | 11,00,000 ₹12,32,000 |
Tender Value
Refer Docs
EMD Value
₹4.3 L
Closing Date
30 Dec 2020, 10:00 amClosed
Director TBRL
TBRL Sector-30 Chandigarh
Fabrication of Payload Arrester System and Sled Arrester System For Impact Trials
2020_DRDO_401709_1
P-0014/32
Open Tender
Miscellaneous Goods
Supply
150 days
TBRLRamgarh Range panchkula
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹4.3 L
Yes
13 May 2021
8 Dec 2020
31 Dec 2020
8 Dec 2020
30 Dec 2020
8 Dec 2020
Multimode Microplate Reader
Block – A Fabrication of SFTRC Roof Blocks M-45 as per scope of work as per Annexure A and drawing Annexure Á-1 3000 mm x 3000 mm x 300 mm
Block – B Fabrication of SFTRC Stopper Blocks M-45 as per scope of work as per Annexure A and drawing Annexure Á-2 9000 mm x 2000 mm x 300 mm
Block – C Fabrication of SFTRC Back Walls M-45 as per scope of work as per Annexure A and drawing Annexure Á-3 2600 mm x 1500 mm x 300 mm
Block – D Fabrication of RCC Pendine Blocks M-45 as per scope of work as per Annexure A and drawing Annexure Á-4 1200 mm x 600 mm x 600 mm
I Beam Structure – E I-beam as per scope of work as per Annexure A and drawing Annexure Á-5 Structure as per Annexure Á-5
Box Structure – F as per scope of work as per Annexure A and drawing Annexure Á-6 6 m x 6 m Annexure Á-6
VED KUMAR SHARMA CONTRACTOR
KUKREJA ENGINEERS
NEERAJ GROUP OF INDUSTRIES
Neometrix Engineering Private Limited
US Dollar
European Euro
British Pound
Japanese yen
Portion of Quoted Rate in Currency
US Dollar
European Euro
British Pound
Japanese yen
Portion of Quoted Rate in Currency
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .