Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹44.4 L+₹2,481.54 (0.06%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | LOKESH L2 | MARUTHAMALAI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Providing BT Road from Lalapet Branch Road to Edapalayam Km 0/0 - 1/6 ( R 60) Panchayat in Walajah Panchayat Union in Ranipet Dt. | |||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 1,728 | Sqm | 7 ₹12,096 | 6 ₹10,368 Lowest |
| 3.00 | Picking 5 Cm to 10 mm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete | 250 | Sqm | 23.5 ₹5,875 | 22 ₹5,500 Lowest |
| 4.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A. | 144 | Cum | 140.45 ₹20,225 Lowest | 140.45 ₹20,225 Lowest |
| 5.00 | collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. | 216 | Cum | 146.26 ₹31,592 Lowest | 146.26 ₹31,592 Lowest |
| 6.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor | 51.19 | Cum | 2,430.56 ₹1,24,420 Lowest | 2,430.56 ₹1,24,420 Lowest |
| 7.00 | Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed as per clause of MORTH Rev-5. | 669.38 | Cum | 2,467.71 ₹16,51,836 Lowest | 2,467.71 ₹16,51,836 Lowest |
| 8.00 | Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5. | 4,462.5 | Sqm | 84.81 ₹3,78,465 Lowest | 84.81 ₹3,78,465 Lowest |
| 9.00 | Applying tack coat over WBM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST | 4,462.5 | Sqm | 28.79 ₹1,28,475 Lowest | 28.79 ₹1,28,475 Lowest |
| 10.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 111.56 | Cum | 12,493.32 ₹13,93,755 Lowest | 12,493.32 ₹13,93,755 Lowest |
Tender Value
₹44.4 L
EMD Value
₹45,000
Closing Date
18 Sept 2025, 3:00 pmClosed
Block Development Officer
Block Development Officer,Walajah
Providing BT Road from Lalapet Branch Road to Edapalayam Km 0/0 - 1/6 ( R 60) Panchayat in Walajah Panchayat Union in Ranipet Dt.
2025_RDTN_605046_1
A2/1594/2025
Open Tender
Civil Works
Item Rate
120 days
Block Development Office
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹45,000
17 Nov 2025
17 Sept 2025
18 Sept 2025
17 Sept 2025
18 Sept 2025
17 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .