Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance NO 731 KOVIL STREET MEYYUR MADHURA VINAYAGAPURAM VARAGOOR POST TIRUVANNAMALAI TIRUVANNAMALAI DISTRICT | MEYYUR | TIRUVANNAMALAI | TAMIL NADU | Admitted-Finance |
| 3 | Not Admitted-Finance | Not Admitted-Finance Original EMD not received |
| 4 | Not Admitted-Finance | Not Admitted-Finance Original EMD not received |
Tender Value
₹10.7 L
EMD Value
₹10,730
Closing Date
21 Dec 2023, 3:00 pmClosed
Block Development Officer(V.Pts.)Tiruvannamalai
BLOCK DEVELOPMENT OFFICE, Tiruvannamalai
Construction of Side drainage (145m) with culvert and soak pit in old colony mariammankovil street in savalpoondi panchayat In Tiruvannamalai Block Under PMAGY
2023_RDTN_390683_1
Roc.No. A11/0923/2023Dt.11.10.2023
Open Tender
Civil Works
Lump-sum
90 days
Tiruvannamalai
REFER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹0
₹10,730
21 Dec 2023
20 Nov 2023
21 Dec 2023
20 Nov 2023
21 Dec 2023
20 Nov 2023
Amount
Construction of Side Drainage (145M) with Culvert & Soak Pit in Old colony Mariammankovil Street in Savalpoondi panchayat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification.
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Plastering with Cement Mortar 1:4 mix to 2omm thick including completed
Construction of Culvert in Savalpoondi
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification.
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works.
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Construction of Horizontal Soak pit in Savalpoondi Panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Boulders
40MM Metal
20mm metal
Coarse Sand
Red Gravel
Charcoal
Provision for Screenig mesh
Provision for 30mm PVC Pipe
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sri Jeevan Constructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .