Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | L1 | Accepted-Finance L1 tender Consider for evaluation |
Tender Value
₹1.7 L
EMD Value
₹1,800
Closing Date
18 Jun 2020, 2:00 pmClosed
SE/Civil/MTPS-II
SE/Civil/MTPS-II
Providing New acid resistant bricks / Tiles in the existing modified Neutralizing Pit No. 4 at MTPS-I location for collection of Effluent to the ETP at MTPS-II.
2020_EB_164161_2
SE/Civil/MTPS-II/OT-19/2020-21
Open Tender
Civil Works - Others
Works
60 days
MTPS-II/Mettur Dam
2 documents required · 2 mandatory
₹0
₹1,800
22 Jun 2020
4 Jun 2020
19 Jun 2020
4 Jun 2020
18 Jun 2020
4 Jun 2020
Amount
Plastering with 20mm thickness using rendroc RG equivalent as per manufacturers specification. The mixed micro concrete should be placed continuously as per specification including cost of all materials, all labour charges, lead, lifts etc., complete.
Laying acid proof tiles lining with one coat of Rotex anti corrosive primer followed by laying 12mm thick Rotex acid resistance mastic and laying 230 x 115 x 38 mm bricks with rotex cement S powde and cement K solution 3:1 ratio mortar for joints pointed with CNSL Powder and CNSL syrup in the ratio of 3:1 including cost of all materials, all labour charges, all leads, lift, etc., complete.
Dewatering the neutralising pit No.4 which cannot pumped by the existing pump at the pit and also modified sump at NP. No.4. using electrically driven motor. The cost includes cost of hire charges for electrical motor, hose for suction for operation of single phase motor, installation charges etc., all leads, lift, complete and as directed by the Engineer in charge.
Providing pressure grouting to the RCC wall for arresting leakage / dampness etc., as directed by the Engineer in charge including providing holes in the wall, fixing PVC tap nipple using RENDROC RG material and pressure grouting of cement slurry mixed with admixture of Conbex 100 or equivalent etc., cost of all materials, scaffolding, curing, labour, lead, lift, safety appliances, etc., complete.
Dismantling the existing concrete at the sides and projecting reinforcement to correct position and in alignment enabling for grouting the water leaking portion of the area and the cost includes cost of all labour, all lead and lifts, etc., complete.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .