| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.8 L+₹5,185.56 (1.37%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.9 L+₹17,619.12 (4.67%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.0 L+₹19,092.29 (5.06%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD Already Pledged to the Work vide this Office NIT No 40 Serial No 01 |
Tender Value
₹5.9 L
EMD Value
₹11,790
Closing Date
12 Oct 2026, 6:00 pmClosed
Executive Engineer
RnB Division Kralpora
Upgradation of Tarathpora Pachkoot Road BWO C/O Drain
2026_PWDJK_326788_1
E tendering NIT No 43/RnB/Kralpora of 2026-27
Open Tender
Civil Works
Percentage
25 days
Kralpora
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer RnB Division Kralpora
₹11,790
16 Oct 2026
1 Oct 2026
13 Oct 2026
1 Oct 2026
12 Oct 2026
1 Oct 2026
1 Oct 2026 - 10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m,including getting out excavated earth and disposal of surplus excavated earth in all kinds of soil | 49.5 | Cum | 256.85 | ₹12,714.08 |
| 2 | Supply and laying of dry stone soling in foundation trenches tightly handpacked with hand ramming, watering and compacting to required density and level surface including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 8.25 | Cum | 1,000 | ₹8,250 |
| 3 | Providing and laying in position cement concrete 1:4:8 grade (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) including curing but excluding the cost of centring and shuttering all work upto plinth level. including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 6.19 | Cum | 5,202.9 | ₹32,205.95 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 3 | Cum | 8,500 | ₹25,500 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 51.15 | Cum | 7,500 | ₹3,83,625 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all levels incl all costs and carriages Complete Job Thermo-Mechanically Treated bars of grade Fe-500D or more including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 360 | Kg | 123.2 | ₹44,352 |
| 7 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. including cost and carriage of materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 24.75 | Sqm | 562.15 | ₹13,913.21 |
| 8.1 | Centering & Shuttering using kitply including strutting propping etc & removal of form work including all leads, lifts, costs & carriages upto site of work complete in Foundation footings, Basis of colums, Plinth beams, walls & Mass concrete | 198 | Sqm | 286.35 | ₹56,697.3 |
| 8.2 | Suspended floors, roofs, landings, balconies and access platforms.. | 7.5 | Sqm | 718.2 | ₹5,386.5 |
| 8.3 | Edges of slabs and breaks in floors and walls above 20 cm wide | 5.8 | Sqm | 1,142.1 | ₹6,624.18 |
stage.html
html • 0.02 MB
finance_1105447.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.41 MB
BOQ_1105447.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .