| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC Ok | |
| 2 | L2₹8.0 L+₹5,330 (0.67%)Rejected-AOC | L2 | Rejected-AOC Ok | |
| 3 | L3₹9.1 L+₹1.2 L (14.8%)Rejected-AOC | L3 | Rejected-AOC Ok |
Tender Value
₹5.2 L
EMD Value
₹10,400
Closing Date
11 May 2020, 10:30 amClosed
EE B and R Division HPPWD Solan
Near New Bus Stand Solan
Construction of Jeepable road from Top Ki Ber km0/0 to o1/700 SH Earth cutting in Km0/500 yo 0/675 and c/o Retaining wall at RD0/560 to 0/570
2020_PWD_36263_1
17674-81 dated 04.03.2020 C/o Jeepable road from T
Open Tender
Civil Works
Item Rate
90 days
Solan
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
EE B and R Division HPPWD Solan
₹10,400
29 Jul 2020
14 Mar 2020
11 May 2020
14 Mar 2020
11 May 2020
14 Mar 2020
Amount
Cutting in earth work in hilly area in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and directed by the Engineer -in-Charge at site. according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and un- useful material and transportation of the un-useful material for disposing at approved dumping site or otherwise and including payment of prescribed charges of dumping to the owner of dumping site ( to be arranged by the contractor) as per satisfaction of Engineer- in -Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures to complete the work (if required). The recovery for stones, whether useful or not, for 215.23 Cum (Two hundrefifteen point two three cubic metre) in all cases, @ rupees 300/- only (Rupees three hundred only) per cubic meter shall be affected on pro- rata basis in each running bill plus / minus contractor premium. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Earthwork in excavation for all type of road structures such as retaining wall, breast wall, culvert, drain and parapets etc. in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiesling / wedging out rocks (where blasting is prohibeted). Dimesions and other particulars as per drawing and Technical Specification Clause 305.1(Three hundred Five point One) including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and its disposal including dressing of sides and bottom and backfilling in trenches with excavated suitable material, trimming, filling of unevenness blindages and finishing of the road to specified dimensions. All work of excavation by blasting shall be carried out by taking all necessary precautions against soil erosions, damage to hill side, water pollutions etc., and to protect stability of hill side rock. Stacking of materials useful for construction at suitable sites and safe disposal of unserviceable excavated materials in specified manners to dumping site (to be arranged by the contractor) or as directed by the Engineer-in-Charge. Any loss to the public or private property during the course of execution shall be the sole responsibility of the contractor, which shall have to be duly compensated by him at his own cost of all cases.
Providing and Laying concrete for Plain cement conc. 1:6:12 ( one cement isto six sand isto twelve graded hard stone aggregate 40mm( forty milimeter) nominal size.) in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 (eight hundred two, eight hundred three, one thousand two hundred two and one thousand two hundred three) and MORD specification including carriage of all labour equipment and materials to various location of site through all modes of transportations in all leads lifts and all incidental charges
Providing and laying concrete for plain/reinforced concretre 1:4:8 (one cement:four sand:eight graded crushed hard stone aggregate 25(twenty five) millimeter nominal size) mechanical mixed, vibrated and curing complete including form work in open foundation as per drawing and technical specification of MORD specification 800 & 1200(Eight hundred and one thousand two hundred) clause 802, 803, 1202 and 1203(Eight hundred two, eight hundred three, one thousand two hundred two and ond thousand two hundred three)and MORD specification including carriage of all labour equipment and materials to various location of site through all modes of transportations in all leads lifts and all incidental charges.
Providing weep holes in brick masonry/stone masonry/plain reinforced concrete abutment, wing wall, return wall with 100mm (one hundred milimeter) dia PVC pipe extending through the full width of the structure with slope of 1 (V):120 (one hundred twenty) (H) towards drawing face complete as per drawing and technical specification clause 614, 709, 1204.3.7(six hundred fourteen, seven hundred nine, one thousand two hundred four pont three point seven) as per MORD specification including carriage of all labour, equipment and material to various location through all modes of transportation in all leads lifts and all incidental charges.
Backfilling behind abutment, wing wall and return wall, breast walls, retaining walls and parapets up to all heights, depths and levels complete as per drawings and technical specification clause 1204.3.8 (one thousand two hundred four point three point eight) Granular material, including carriage of all labour equipment and materials to various location of site through all modes of transportations in all leads lifts and all incidental charges.
Bhupender Jaswal Contractor
BHUPENDER SINGH THAKUR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .