| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.0 LAccepted-AOC | L1 | Accepted-AOC Successful Bidder. | |
| 2 | L2₹26.8 L+₹78,406 (3.01%)Rejected-Finance | L2 | Rejected-Finance Unsuccessful Bidder. | |
| 3 | L3₹26.9 L+₹87,663.48 (3.37%)Rejected-Finance | L3 | Rejected-Finance Unsuccessful Bidder. | |
| 4 | L4₹27.2 L+₹1.1 L (4.33%)Rejected-Finance | L4 | Rejected-Finance Unsuccessful Bidder. | |
| 5 | L5₹27.4 L+₹1.4 L (5.40%)Rejected-Finance | L5 | Rejected-Finance Unsuccessful Bidder. |
| Sl No | Description | Qty | Unit | SHRI P P SHARMA L8 | MESSERS D S ENTERPRISE L6 | M/S B K ENTERPRISE L5 | M/S IDEAL CONSTRUCTIONS L3 | BUILDERS ASSOCIATE L1 | M/S BIJAN CHAKRABORTY L7 | UNISON CONSTRUCTION L2 | PAL CHOWDHURY CONSTRUCTION AND CO. L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Labour and T&P for cutting grass by mechanically operated slasher including removing of material upto a distance exc 250m & n.exc 500m, obtained from cutting & cleaning (from the concrete edges) complete all as specified and directed.
Note : (i) Mechanical slasher (i.e. set of one tractor & jungle Jim) with POL & MT driver shall be arranged by the contractor.
(ii) The basis and quoted rate shall be operated in morning hours as well as night after flying hours, including Sundays and holidays on requirement basis and quoted rate shall deemed to be inclusive of all provisions.
(iii) Minimum output of one mechanical slasher shall not be less than 6000 sqm per day (grass cutting clear area).
(iv) Attendance register shall be maintained by the Engr-in-Charge for operation of this item and shall be submitted to GE duly signed by contractor, JE and Engg-in-Charge while processing payment of RAR.
(v) On any particular day more than one slasher may be provided as on required basis, the unit of work shall be measured in multiple of job per day.
(vi) Minimum output of 6000 Sqm is not achieved in one day shall be consider in balance to next day for accounting. | 140 | Each Job per day | 8,000 ₹11,20,000 Lowest | 8,850 ₹12,39,000 | 8,800 ₹12,32,000 | 8,400 ₹11,76,000 | 8,470 ₹11,85,800 | 8,475 ₹11,86,500 | 8,670 ₹12,13,800 | 8,000 ₹11,20,000 Lowest |
| 2.00 | Labour and T&P for cutting grass by bush operated slasher including removing of material upto a distance exc 250m & n.exc 500m, obtained from cutting & cleaning (from the concrete edges) complete all as specified and directed.
Note : (i) Bush cutter with POL & operator shall be arranged by the contractor and quoted rates shall deemed to be inclusive all provisions.
(ii) The bush cutter shall be operated from 0900 hrs to 1700 hrs including lunch break of half an hour, including Sundays and holidays on requirement basis
(iii) Minimum output one bush cutter shall not less than 350 Sqm per day (Grass cutting clear area).
(iv) Attendance register shall be maintained by the Engr-in-Charge for operation of this item and shall be submitted to GE duly signed by contractor, JE and Engg-in-Charge while processing payment of RAR. | 140 | Each Job per day | 1,100 ₹1,54,000 | 1,040 ₹1,45,600 | 1,025 ₹1,43,500 | 1,000 ₹1,40,000 | 960 ₹1,34,400 Lowest | 1,175 ₹1,64,500 | 1,000 ₹1,40,000 | 1,200 ₹1,68,000 |
| 3.00 | Cutting / scraping grass / wild growth and all vegetation etc manually around the runway light etc, stacking into heaps and removing off from the premises upto a distance exceeding 250m & n.exc 500m complete all as specified and directed.
(Note : The work shall be carried out on requirement basis during the contract period). | 1,504 | Per 10 Sqm | 150 ₹2,25,600 | 145 ₹2,18,080 | 125 ₹1,88,000 | 140 ₹2,10,560 | 95 ₹1,42,880 Lowest | 175 ₹2,63,200 | 105 ₹1,57,920 | 200 ₹3,00,800 |
| 4.00 | Supply only broken stone aggregates of gauge 90-150mm graded complete all as specified and directed. | 65.52 | Cum | 1,750 ₹1,14,660 | 1,860 ₹1,21,867.2 | 1,860 ₹1,21,867.2 | 1,895 ₹1,24,160.4 | 1,800 ₹1,17,936 | 1,925 ₹1,26,126 | 1,850 ₹1,21,212 | 1,700 ₹1,11,384 Lowest |
| 5.00 | Supply only broken stone aggregates of gauge 63-90mm graded complete all as specified and directed. | 43.68 | Cum | 1,750 ₹76,440 | 1,875 ₹81,900 | 1,870 ₹81,681.6 | 1,830 ₹79,934.4 | 1,800 ₹78,624 | 1,925 ₹84,084 | 1,875 ₹81,900 | 1,700 ₹74,256 Lowest |
| 6.00 | Supply only hardcore of broken stone aggregates of gauge 40-63mm graded complete all as specified and directed. | 32.76 | Cum | 18,000 ₹5,89,680 | 1,900 ₹62,244 | 1,925 ₹63,063 | 1,895 ₹62,080.2 | 1,850 ₹60,606 | 1,950 ₹63,882 | 1,900 ₹62,244 | 1,800 ₹58,968 Lowest |
| 7.00 | Supply only broken stone aggregates of gauge 20mm graded complete all as specified and directed. | 65.52 | Cum | 1,850 ₹1,21,212 Lowest | 1,930 ₹1,26,453.6 | 1,970 ₹1,29,074.4 | 1,949 ₹1,27,698.48 | 1,900 ₹1,24,488 | 2,000 ₹1,31,040 | 1,950 ₹1,27,764 | 1,950 ₹1,27,764 |
| 8.00 | Supply only fine aggregate (Sand) best quality locally available complete all as specified and directed. | 64 | Cum | 1,750 ₹1,12,000 Lowest | 1,850 ₹1,18,400 | 1,860 ₹1,19,040 | 1,884 ₹1,20,576 | 1,800 ₹1,15,200 | 1,925 ₹1,23,200 | 1,850 ₹1,18,400 | 1,800 ₹1,15,200 |
| 9.00 | Supply only 400 micron thick HDPE sheet (Virgin quality) water proof, wrinkle free without puncture having minimum weight 390 gm/Sqm complete all as specified and directed. | 240 | Sqm | 170 ₹40,800 | 175 ₹42,000 | 255 ₹61,200 | 160 ₹38,400 Lowest | 245 ₹58,800 | 190 ₹45,600 | 250 ₹60,000 | 200 ₹48,000 |
| 10.00 | Supply only unskilled labour (18 years and above) for 8 hrs/day complete all as specified and directed. | 120 | Nos | 940 ₹1,12,800 | 940 ₹1,12,800 | 935 ₹1,12,200 | 912 ₹1,09,440 | 900 ₹1,08,000 Lowest | 950 ₹1,14,000 | 925 ₹1,11,000 | 950 ₹1,14,000 |
Tender Value
₹24.9 L
EMD Value
₹49,800
Closing Date
16 May 2026, 6:00 pmClosed
GE (AF) Bagdogra
GE AF Bagdogra Bagdogra Airport PO, Dist Darjeeling, WB - 734421
CLEANING AND UPROOTING OF VEGETATION GRASS OF AIRFIELD AREA AND REPAIR OF 04 NOS OF CRATORS WITH RAPIGROUT CEMENT AS PER SOP INCLUDING SUPPLY OF T AND P, LABOUR AND MATERIAL AT SHORT NOTICE AT 20 WING AF STN BAGDOGRA UNDER GE (AF) BAGDOGRA.
2026_MES_762070_1
8700/E8
Open Tender
Civil Works
Item Rate
180 days
GE (AF) Bagdogra
As per NIT
10 documents required · 10 mandatory
₹500
GE (AF) Bagdogra
₹49,800
Yes
8 Jul 2026
25 Apr 2026
18 May 2026
25 Apr 2026
16 May 2026
9 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour and T&P for cutting grass by mechanically operated slasher including removing of material upto a distance exc 250m & n.exc 500m, obtained from cutting & cleaning (from the concrete edges) complete all as specified and directed.
Note : (i) Mechanical slasher (i.e. set of one tractor & jungle Jim) with POL & MT driver shall be arranged by the contractor.
(ii) The basis and quoted rate shall be operated in morning hours as well as night after flying hours, including Sundays and holidays on requirement basis and quoted rate shall deemed to be inclusive of all provisions.
(iii) Minimum output of one mechanical slasher shall not be less than 6000 sqm per day (grass cutting clear area).
(iv) Attendance register shall be maintained by the Engr-in-Charge for operation of this item and shall be submitted to GE duly signed by contractor, JE and Engg-in-Charge while processing payment of RAR.
(v) On any particular day more than one slasher may be provided as on required basis, the unit of work shall be measured in multiple of job per day.
(vi) Minimum output of 6000 Sqm is not achieved in one day shall be consider in balance to next day for accounting. | 140 | Each Job per day | - | - |
| 2 | Labour and T&P for cutting grass by bush operated slasher including removing of material upto a distance exc 250m & n.exc 500m, obtained from cutting & cleaning (from the concrete edges) complete all as specified and directed.
Note : (i) Bush cutter with POL & operator shall be arranged by the contractor and quoted rates shall deemed to be inclusive all provisions.
(ii) The bush cutter shall be operated from 0900 hrs to 1700 hrs including lunch break of half an hour, including Sundays and holidays on requirement basis
(iii) Minimum output one bush cutter shall not less than 350 Sqm per day (Grass cutting clear area).
(iv) Attendance register shall be maintained by the Engr-in-Charge for operation of this item and shall be submitted to GE duly signed by contractor, JE and Engg-in-Charge while processing payment of RAR. | 140 | Each Job per day | - | - |
| 3 | Cutting / scraping grass / wild growth and all vegetation etc manually around the runway light etc, stacking into heaps and removing off from the premises upto a distance exceeding 250m & n.exc 500m complete all as specified and directed.
(Note : The work shall be carried out on requirement basis during the contract period). | 1,504 | Per 10 Sqm | - | - |
| 4 | Supply only broken stone aggregates of gauge 90-150mm graded complete all as specified and directed. | 65.52 | Cum | - | - |
| 5 | Supply only broken stone aggregates of gauge 63-90mm graded complete all as specified and directed. | 43.68 | Cum | - | - |
| 6 | Supply only hardcore of broken stone aggregates of gauge 40-63mm graded complete all as specified and directed. | 32.76 | Cum | - | - |
| 7 | Supply only broken stone aggregates of gauge 20mm graded complete all as specified and directed. | 65.52 | Cum | - | - |
| 8 | Supply only fine aggregate (Sand) best quality locally available complete all as specified and directed. | 64 | Cum | - | - |
| 9 | Supply only 400 micron thick HDPE sheet (Virgin quality) water proof, wrinkle free without puncture having minimum weight 390 gm/Sqm complete all as specified and directed. | 240 | Sqm | - | - |
| 10 | Supply only unskilled labour (18 years and above) for 8 hrs/day complete all as specified and directed. | 120 | Nos | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tenderdocuments8700.pdf
Tender Documents • 1.30 MB
BOQ_853625.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .