Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 160 PILLAIYAR KOIL STREET ANGARAYALLUR VILLAGE NARASINGARAYANPETTAI SENJI 604 202 | SENJI | VILLUPURAM | TAMIL NADU | 604202 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹48.1 L
EMD Value
₹48,100
Closing Date
28 Oct 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO
Melmalayanur
Providing BT Road from Kottapoondi to Sekkadikuppam road under 15th CFC 20-21 in Melmalayanur Block
2022_RDTN_256295_1
TNVPM/MMR/Kottapoondi
Open Tender
Civil Works
Works
180 days
Melmalayanur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹48,100
Yes
28 Oct 2022
13 Oct 2022
28 Oct 2022
13 Oct 2022
28 Oct 2022
13 Oct 2022
Amount
Strengthening the Road from Kottampoondi Chekkadikuppam Road 0/0-1/94
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br
Laying US GRAVEL including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete. (Shoulder)
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Applying TACK COAT over BT surface at 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
CONSTRUCTION OF RETAINING WALL @ Ch 250 - 277
Earthwork excavation and depositing on bank with an intial lead & Lift in hard stiff clay soil as per SS 20B for foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG ISS metal including cost & conveyance and labour charges etc complete.
Cement Concrete 1:3:6 mix using 40 mm HBG ISS metal including cost & conveyance and labour charges etc complete.
Supply & Erection of centring for RCC works including cost & conveyance and labour charges for Placing in position etc complete
CONSTRUCTION OF RETAINING WALL @ Ch 1570-1600 , 1740-1770
Earthwork excavation and depositing on bank with an intial lead & Lift in hard stiff clay soil as per SS 20B for foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG ISS metal including cost & conveyance and labour charges etc complete.
Cement Concrete 1:3:6 mix using 40 mm HBG ISS metal including cost & conveyance and labour charges etc complete.
Supply & Erection of centring for RCC works including cost & conveyance and labour charges for Placing in position etc complete
CONSTRUCTION OF RETAINING WALL @ Ch
Earthwork excavation and depositing on bank with an intial lead & Lift in hard stiff clay soil as per SS 20B for foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG ISS metal including cost & conveyance and labour charges etc complete.
Cement Concrete 1:3:6 mix using 40 mm HBG ISS metal including cost & conveyance and labour charges etc complete.
Supply & Erection of centring for RCC works including cost & conveyance and labour charges for Placing in position etc complete
Provision for KM Stones.
Provision for HM Stones.(0.75 X 0.23 X 1)
Provision for Name board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Malaiarasan.V
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .