Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-AOC NATUNDANGA BANAGRAM BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713381 | ₹18.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.1 LRejected-Finance 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹19.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹19.3 LRejected-Finance 0 HISAR HISAR HARYANA 125004 UDYAM HR 06 0052049 | HISAR | HARYANA | 125004 | ₹19.3 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | MAZUMDER ELECTRICAL L2 | RAJ ENTERPRISE L3 | ENERGY ENGINEERING L1 |
|---|---|---|---|---|---|---|
| 1.00Supply & Making of Craddle Guard below over head line of Manderboni Colliery . (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Supply & Fitting of Craddle Guard | 10 | Nos | 6,976 ₹69,760 | 7,050 ₹70,500 | 6,800 ₹68,000 |
| 1.02 | Supply & Fitting of Bracket for Craddle Guard | 20 | Nos | 1,488 ₹29,760 | 1,503 ₹30,060 | 1,450 ₹29,000 |
| 1.03 | Supply & Fitting of Clam | 30 | Nos | 308 ₹9,240 | 311 ₹9,330 | 300 ₹9,000 |
| 1.04 | Supply & Fitting of Stay Set | 10 | Nos | 1,590 ₹15,900 | 1,607 ₹16,070 | 1,550 ₹15,500 |
| 1.05 | Supply & Fitting of Stay wire (7/12 SWG) | 50 | Kgs | 97 ₹4,850 | 98 ₹4,900 | 95 ₹4,750 |
| 1.06 | Supply & Fitting of Earth Spike | 20 | Nos | 872 ₹17,440 | 881 ₹17,620 | 850 ₹17,000 |
| 1.07 | Profit @10% | 1 | Nos | 14,696 ₹14,696 | 14,852 ₹14,852 | 14,325 ₹14,325 |
| 2.00Breakdown maintenances of power line in respect of cable joining, laying etc. at Manderboni Colliery. (Inclusive of EPF/CMPF) | ||||||
| 2.01 | Making Heat Shrink terminal kit with Supply of 3M make outdoor type 70-95 SQMM heat Shrink terminal kit | 3 | Nos | 24,109 ₹72,327 | 24,365 ₹73,095 | 23,500 ₹70,500 |
Tender Value
₹18.7 L
EMD Value
₹23,400
Closing Date
27 Jan 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
MISC. JOBS RELATED TO OVERHEAD LINE FOR SAFETY CONCERN, RENOVATION/MANTAINANCE OF 440V/550V OHL NEAR AGENT OFFICE and DIVERSIFICATION OF 440V OHL AS PART OF RENNOVATION WORK DUE TO RIVER EROSION AT RIVER SIDE PUMP HOUSE Under MANDERBONI COLLIERY
2026_ECL_351329_1
GM-PND/EandM/25-26/255/1349 dated 14/01/2026
Open Tender
Electrical and Maintenance Works
30 days
Manderboni Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹23,400
6 Mar 2026
16 Jan 2026
28 Jan 2026
16 Jan 2026
27 Jan 2026
16 Jan 2026
16 Jan 2026 - 20 Jan 2026
Supply & Making of Craddle Guard below over head line of Manderboni Colliery . (Inclusive of EPF/CMPF)
Supply & Fitting of Craddle Guard
Supply & Fitting of Bracket for Craddle Guard
Supply & Fitting of Clam
Supply & Fitting of Stay Set
Supply & Fitting of Stay wire (7/12 SWG)
Supply & Fitting of Earth Spike
Profit @10%
Breakdown maintenances of power line in respect of cable joining, laying etc. at Manderboni Colliery. (Inclusive of EPF/CMPF)
Making Heat Shrink terminal kit with Supply of 3M make outdoor type 70-95 SQMM heat Shrink terminal kit
Making Heat Shrink terminal kit Joint with Supply of 3m make indoor type 70-95 SQMM heat Shrink terminal kit
Laying & Erection of 70-95 SQMM X 03 Core PVC Cable
3 post X 11KV Gang Switch With Replacement of Damage Parts
Profit @10%
Changing & Maintanance Fuse Unit at Naya Dhawra and Pump house of Manderboni Colliery. (Inclusive of EPF/CMPF)
Supply & Fitting of Bracket for Fuse Unit
Supply & Fitting of Clamp
Supply & Fixing of Shackle Insulator
Supply of 95 SQMM Aluminium Cable
Laying of 95 SQMM Aluminium/Copper Cable
Supply & Fitting of 95 SQMM Socket
Supply & Fitting of Ms nut & bolt
Transporting
Profit @10%
Emergency Breakdown Maintanance of 550V Over head line of Manderboni Colliery. (Inclusive of EPF/CMPF)
Supply & Fitting of Bracket
Supply & Fitting of Clamp
Dismantaling of Rabbit Conductor
Dismantaling of bracket
Supply & Fitting of Shackle Insulator
Dismantaling of Clamp
Dismantaling of Shackle Insulator
Drawing of Rabbit Conductor
Supply & Fitting of Stay Set Complete
Supply & Fitting of 70 SQMM Copper Socket
Supply & Fitting of Ms nut & bolt
Transporting
Supply & Erection of 3.5 Core 70 sqmm 1100V AB aluminium conductor unmoured (A2XY) Cable as per IS 14255
Supply & Erection of AB cable clamping holder/Suspension Clamp
Transporting
Profit @10%
Emergency Maintanance of 440V Over head line at Various Location of Manderboni Colliery. (Inclusive of EPF/CMPF)
Supply & Erection of PCC Pole
Erection of PCC Pole
Supply & Fitting of Bracket
Supply & Fitting of Clamp
Supply & Fitting of Shackle Insulator
Dismantaling of Rabbit Conductor
Dismantaling of Bracket
Dismantaling of Clamp
Dismantaling of Shackle Insulator
Drawing of Rabbit Conductor
Dismantaling of PCC Pole
Dismantaling & Drawing of House Connection
Supply & fitting of Stay Set Complete
Supply & Fitting of Ms nut & bolt
Supply & Stringing of Dog conductor
Transporting of Pole
Profit @10%
Repairing & Rewinding of 500KVA, 11KV/550V 3 phase Power Transformer at Khottadih Colliery. (Inclusive of EPF/CMPF)
Dismantling of Pipe Pole/PCC Pole
Dismantaling of Bracket & Clamp
Dismantaling of Shackle/pin/Disc Insulator
Erection of Pipe Pole
Supply & Fitting of Bracket
Supply & Fitting of Clamp
Supply & Fitting of Stay Set Complete
Making of Dropper
Supply & Fitting of Nut, Bolt, Washer
Transporting of Pole
Laying & Erecting of 70-95 Sqmm X 03 core PVC Cable
Supply & Erection of 3.5 Core 70 Sqmm 1100V AB aluminium Conductor
Supply & Erection of AB cable clamping holder/Suspension Clamp
DIVERSIFICATION OF 440V OVER HEAD LINE AS PART OF RENNOVATION WORK DUE TO RIVER EROSION AT RIVER SIDE PUMP HOUSE OF MANDERBONI COLLIERY. (Inclusive of EPF/CMPF)
Dismantling of Pipe Pole/PCC Pole
Dismantling of Bracket & Clamp
Dismantling of Shackle/pin/Disc Insulator
Dismantling of Rabbit Conductor
Fitting of Bracket & Clamp
Fitting of Shackle/pin/Disc Insulator
Drawing of Rabbit Conductor
Erection of Pipe Pole
Supply & Fitting of Bracket
Supply & Fitting of Clamp
Supply & Fitting of Stay Set Complete
Making of Dropper
Supply & Fitting of Nut, Bolt, Washer
Transporting of Pole
Laying & Erecting of 70-95 Sqmm X 03 core PVC Cable
Supply & Erection of 3.5 Core 70 Sqmm 1100V AB aluminium Conductor
Supply & Erection of AB cable clamping holder/Suspension Clamp
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_364076.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid