| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.8 LAccepted-AOC | ₹3.8 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹3.8 LRejected-Finance | ₹3.8 L | 2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SUBRAMANIAN CONTRACTOR L2 | M.R ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling old damaged Brick work/ stone masonry walls in cement mortar under 3m height and Clearing away and carefully stacking materials useful for re-use for any thickness of walls etc., complete as per std specification | 4.5 | m3 | 350 ₹1,575 | 302 ₹1,359 |
| 2.00 | Earth work excavation for desilting the existing rivers / canals / channels/odai/ nullas / drains/flood bowls/ tanks/ reservoirs etc., consisting of very loose soil, silt, oily silt, slushy, marshy, loany, organic soil, sea shell and flat mica particles with zero present air void in unhygienic & insanitary conditions in under water and not under water deploying earth moving machinery with suitable floats buoys barge/ hydraulic excavator & other mechanical devices including the cost of hire charges for machinery, with cost of skilled operators with helper & cleaners for the entire operations to reach the banks in which the removed silt & sludge has to be dumped over either one of the rivers / canals / channels/odai/ nullas / drains/floods bowls / tanks / reservoirs etc, bank whichever is convenient as per the prevailing site conditions for easy conveyance and including jungle clearance etc.. complete (Rate excluding conveyance to dumping yard or low lying area) | 4.5 | m3 | 200 ₹900 | 116 ₹522 |
| 3.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum For Drain - Upto 1.25m Width - First Depth Upto 2m | 57 | m3 | 170 ₹9,690 | 165 ₹9,405 |
| 4.00 | Removal of excess earth 3km away from site including loading and inloading charges and all labour charges as instructed by the Departmental Offices etc,complete as per standard specifications . | 52.8 | m3 | 70 ₹3,696 | 67 ₹3,537.60 |
| 5.00 | Plain Cement Concrete 1:4:8 (one cement four Parts of crushed stone M-sand and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (The crushed stone sand to be used on cocrete work shell conform to gradation as per IS :383-1970 ) | 8 | m3 | 5,503 ₹44,024 | 5,503 ₹44,024 |
| 6.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation - Drain Side Walls - Upto 900mm | |||||
| 6.01 | Side Wall | 148 | m2 | 500 ₹74,000 | 489 ₹72,372 |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement, two m.sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 26.5 | m3 | 7,000 ₹1.9 L | 6,892 ₹1.8 L |
| 8.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two m.sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) 25mm thick | 33 | m2 | 200 ₹6,600 | 167 ₹5,511 |
| 9.00 | GST 18% | 1 | No | 58,677 ₹58,677 | 57,486 ₹57,486 |
Tender Value
₹3.9 L
EMD Value
₹3,900
Closing Date
6 Nov 2025, 3:00 pmClosed
THE COMMISSIONER UDUMALPET MUNICIPALITY
THE COMMISSIONER UDUMALPET MUNICIPALITY
Maintenance and Repairs to Drain with Culverts at Babukhan street East Side (From Nehru street to Commissioner Subbaih Street) in Ward no 18 and 24 Udumalpet Municipality
2025_MAWS_617331_1
1736/2024/E1
Open Tender
Civil Works - Others
60 days
UDUMALPET
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,900
12 May 2026
25 Oct 2025
7 Nov 2025
25 Oct 2025
6 Nov 2025
25 Oct 2025
25 Oct 2025 - 6 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_737731.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid