Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.2 LAdmitted-Fee/PreQual/Technical/Finance MGR SALAI 2ND CROSS STREET MGR SALAI 5TH CROSS STREET MGR SALAI 33 UNIT 41 ZONE 14 | -24.10% | ₹16.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹16.8 L+₹55,596.97 (3.43%)Admitted-Fee/PreQual/Technical/Finance TAMIL NADU TAMIL NADU TAMIL NADU | COIMBATORE | TAMIL NADU | 638459 | -21.50% | ₹16.8 L+₹55,596.97 (3.43%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹17.3 L+₹1.1 L (6.86%)Admitted-Fee/PreQual/Technical/Finance NA | NA | NA | 121004 | -18.89% | ₹17.3 L+₹1.1 L (6.86%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹18.2 L+₹1.9 L (12.0%)Admitted-Fee/PreQual/Technical/Finance NA | -14.99% | ₹18.2 L+₹1.9 L (12.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹18.2 L+₹1.9 L (12.0%)Admitted-Fee/PreQual/Technical/Finance CHENNAI | CHENNAI | CHENNAI | TAMIL NADU | -14.99% | ₹18.2 L+₹1.9 L (12.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹21.4 L
EMD Value
₹21,400
Closing Date
2 Jul 2026, 3:00 pmClosed
ZONAL_OFFICER_ZONE_14
No_ 6_64_ Puzhuthivakkam Main road Puzhuthivakkam Chennai 600 091
Z.O.XIV.C.NO.E2/3666/2026 IMPROVEMENTS AND MINOR REPAIR WORK OF STORM WATER DRAIN AT VARIOUS STREETS IN DIVISION-189, UNIT-43, ZONE-14.
2026_CoC_682907_1
Z.O.XIV.C.NO.E2/3666/2026
Open Tender
Civil Works
Works
90 days
GREATER_CHENNAI_CORPORATION_ZONE_14
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹21,400
3 Jul 2026
26 Jun 2026
3 Jul 2026
26 Jun 2026
2 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of RCC Slab (reinforcement is being co...torm Water Drain - Steel is declared unfit for use | 10 | CUM | 2,220.9 | ₹22,209 |
| 2 | Supplying and erecting centering for plane surface...g shall be given after the concrete is laid).BEAM | 55 | SQM | 1,267.76 | ₹69,726.8 |
| 3 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level | 810 | KGS | 98.7 | ₹79,947 |
| 4 | Providing and laying in position, Standardised Con...the Department for the excess usage of materials). | 9 | CUM | 8,529.2 | ₹76,762.8 |
| 5 | Supplying and fixing of 24” SFRC Gully Gratings of...ll be painted with anti corrosive bitumastic paint | 142 | EACH | 6,305.4 | ₹8,95,366.8 |
| 6 | Raising Or Lowering 45 cm.(or) 60 cm. Dia Cast Iro... Smooth The Top Surface With Cement Etc. Complete | 203 | NOS | 4,898.19 | ₹9,94,332.57 |
stage.html
html • 0.03 MB
finance_820944.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
3666.pdf
Tender Documents • 1.70 MB
BOQ_820944.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .