| 1 | L2₹7.9 LAccepted-AOC 01 BASTI ADITYA CONSTRUCTION GENSHPUR VILLAGE TOWN GANESHPUR CITY GANESHPUR BASTI UTTAR PRADESH 272002 INDIA | BASTI | UTTAR PRADESH | 272002 | L2 | Accepted-AOC Accept | |
| 2 | L2₹8.0 LRejected-AOC | L2 | Rejected-AOC Accept | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.1 L
EMD Value
₹16,200
Closing Date
9 Nov 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
executive enginee balan canal divison prayagraj
Office of the EE Belan Canal Division Prayagraj
Reconstruction of Head Regulator of Sinki Minor Offtake From Khunta Minor.
2021_UPIDC_633382_15
03/EE/2021-22
Open Tender
Civil Works
Item Wise
45 days
prayagraj
Please refer tender documents
2 documents required · 2 mandatory
₹766
₹16,200
Yes
6 Jan 2022
30 Oct 2021
9 Nov 2021
30 Oct 2021
9 Nov 2021
30 Oct 2021
90 days
Amount
Earth work Excavation in foundation in all type of soils including back filling of excavated earth ,all lead and lift and T&P etc.
Laying local sand below in foundation .C.C. including cost of all material, labour with proper T&P etc.
Laying .C.C.(1:3:6) in foundation including cost of material, labour, T&P etc.
C.R.Stone masonry in 1:3 cement sand mortar including cost of all material labor and T&P etc .
Centering & shuttering for concrete work including cost of all material, labour and T&P etc. required for proper completion of work.
Providing and Fixing of 3 mm thick multi plast poly plus tar paper including cost of all materials labour T&P etc
Providing and Fixing of 20 mm thick multi joint filler board including cost of all materials labour T&P etc
Steel Reinforcement in bed block and slab including, cutting, bending, binding and placing in proper position including cost of steel binding wire labour and T&P etc.
Laying R C C 1:1.5:3 including cost of all materials, labour T&P etc.
Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labourT&P etc.
Laying C.C.1:1.5:3 including cost of material, labour, T&P etc.
Febrication and errection of steel gate Size 1.00 x 1.50 M ( weight of steel gate 414.39kg) including cost of all materials, labour, T&P etc. for proper completion of work.
Dry Stone pitching the approach including cost of all material, labour and T&P etc.
Colour washing of two coat of H/R including cost of all materials, labour, T&P etc. for proper completion of work.
E/W in embankment for coreecting section and approach ramp in all type of soil including all lead , lift & manual compaction, dressing and T & P etc complete.
D.V.R. CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .