| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance | ₹3.7 L | L1 | Admitted-Finance |
| 2 | L2₹3.9 L+₹14,500 (3.87%)Admitted-Finance | ₹3.9 L+₹14,500 (3.87%) | L2 | Admitted-Finance |
| 3 | L3₹3.9 L+₹18,750 (5.01%)Admitted-Finance KENDA KENDA KENDA BARDHAMAN 713342 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713342 | ₹3.9 L+₹18,750 (5.01%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ENTER CONSTRUCTION L2 | MANISH BHAGAT L1 | BANERJEE CONCERN L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00 | Loading, Transporting and unloading of Submersible pump motor set and 6 inches dia MS Pipes (100 Nos) from CL Jambad Colliery Workshop to New Borehole site - Un-skilled Manpower: 10 head x 3 shifts= 30 man shift | 30 | Hds | 1,718.8 ₹51,564 Lowest | 1,718.8 ₹51,564 Lowest | 1,718.8 ₹51,564 Lowest |
| 3.00 | Loading, Transporting and unloading of Sumbersible pump motor set Semi-Skilled Manpower = 2 head x 3 shift= 6 Man shift | 2 | Hds | 1,763.14 ₹3,526.28 Lowest | 1,763.14 ₹3,526.28 Lowest | 1,763.14 ₹3,526.28 Lowest |
| 4.00 | Fabrication of Lowering Clamp (4 Numbers= 2 sets) manually - Skilled manpower 2 heads x 1 shift 2 man shift | 2 | Hds | 1,806.1 ₹3,612.2 Lowest | 1,806.1 ₹3,612.2 Lowest | 1,806.1 ₹3,612.2 Lowest |
| 5.00 | Lowering of 500 GPM, 150-meter head submersible pump-motor set... Semi-skilled Manpower: 10 head x 2 shifts= 20 man shift | 20 | Hds | 1,763.14 ₹35,262.8 Lowest | 1,763.14 ₹35,262.8 Lowest | 1,763.14 ₹35,262.8 Lowest |
| 6.00 | Lowering of 500 GPM... Skilled Manpower- 04 heads x 2 shift 08 man shift | 8 | Hds | 1,806.1 ₹14,448.8 Lowest | 1,806.1 ₹14,448.8 Lowest | 1,806.1 ₹14,448.8 Lowest |
| 7.00 | Laying and jointing of 6 inches dia (500 meters) MS Pipeline... Un-skilled manpower: - 8 heads x 10 shift 80 man shift | 80 | Hds | 1,718.8 ₹1,37,504 Lowest | 1,718.8 ₹1,37,504 Lowest | 1,718.8 ₹1,37,504 Lowest |
| 8.00 | Laying and jointing of 6 inches dia (500 meters) MS Pipeline... Skilled manpower- 4 heads x 10 shift 40 man shift | 40 | Hds | 1,806.1 ₹72,244 Lowest | 1,806.1 ₹72,244 Lowest | 1,806.1 ₹72,244 Lowest |
| 9.00 | Jointing of Pipeline to branches of domestic supply inside village - Skilled manpower- 2 head x 2 shift- 4 man shift | 4 | Hds | 1,806.1 ₹7,224.4 Lowest | 1,806.1 ₹7,224.4 Lowest | 1,806.1 ₹7,224.4 Lowest |
| 10.00 | Jointing of Pipeline to branches of domestic supply inside village - Semi-skilled manpower- 2 heads x 2 shift 4 man shift | 4 | Hds | 1,463.14 ₹5,852.56 Lowest | 1,463.14 ₹5,852.56 Lowest | 1,463.14 ₹5,852.56 Lowest |
Tender Value
₹4.4 L
EMD Value
₹5,600
Closing Date
8 May 2026, 5:00 pmClosed
Area Engineer(EnM)
Kenda Area
Lowering of 150-meter head,550V submersible pump-motor set along with 6-inch dia MS Pipe (16 Nos in borehole) at new borehole near Siduli 5 number pit by CL Jambad Colliery under Kenda Area and joining of 6 inches dia MS pipes (500 meters approx.)
2026_ECL_358872_1
GM/KND/AE(ENM)/55(TN)/26-27/04
Open Tender
Miscellaneous Works
Item Rate
7 days
CL Jambad Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,600
29 Jul 2026
28 Apr 2026
9 May 2026
28 Apr 2026
8 May 2026
28 Apr 2026
28 Apr 2026 - 5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item Description/ Heading | - | - | - | - |
| 2 | Loading, Transporting and unloading of Submersible pump motor set and 6 inches dia MS Pipes (100 Nos) from CL Jambad Colliery Workshop to New Borehole site - Un-skilled Manpower: 10 head x 3 shifts= 30 man shift | - | Hds | - | - |
| 3 | Loading, Transporting and unloading of Sumbersible pump motor set Semi-Skilled Manpower = 2 head x 3 shift= 6 Man shift | - | Hds | - | - |
| 4 | Fabrication of Lowering Clamp (4 Numbers= 2 sets) manually - Skilled manpower 2 heads x 1 shift 2 man shift | - | Hds | - | - |
| 5 | Lowering of 500 GPM, 150-meter head submersible pump-motor set... Semi-skilled Manpower: 10 head x 2 shifts= 20 man shift | - | Hds | - | - |
| 6 | Lowering of 500 GPM... Skilled Manpower- 04 heads x 2 shift 08 man shift | - | Hds | - | - |
| 7 | Laying and jointing of 6 inches dia (500 meters) MS Pipeline... Un-skilled manpower: - 8 heads x 10 shift 80 man shift | - | Hds | - | - |
| 8 | Laying and jointing of 6 inches dia (500 meters) MS Pipeline... Skilled manpower- 4 heads x 10 shift 40 man shift | - | Hds | - | - |
| 9 | Jointing of Pipeline to branches of domestic supply inside village - Skilled manpower- 2 head x 2 shift- 4 man shift | - | Hds | - | - |
| 10 | Jointing of Pipeline to branches of domestic supply inside village - Semi-skilled manpower- 2 heads x 2 shift 4 man shift | - | Hds | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_371732.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .