Loading…
Loading…
Tender Value
₹63.7 L
EMD Value
₹1.3 L
Closing Date
2 Jul 2026, 3:00 pm
Executive Engineer, BUILDING DIVISION DARBHANGA
EE
Executive Engineer, BUILDING DIVISION DARBHANGA, BCD
Superintending Engineer, BUILDING CIRCLE DARBHANGA
SE
CONSTRUCTION OF BRICK DRAIN, APPRAOCH ROAD , SEPTIC TANK, SUBMERSIBBLE & JEEVIKA WORK IN THE CAMPUS OF OBC (GIRLS) RESIDENTIAL +2 HIGH SCHOOL AT BADH POKHAR UNDER KEOTI BLOCK IN DISTRICT DARBHANGA FOR YEAR OF 2025-26.
133477
04/BCD/DARBHANGA/2026-27
Open Tender
CIVIL
Darbhanga
• Registration Number for Building Construction Department, Government of Bihar
• Registration Number issue date
• Annual Financial Turnover for FY- 2022-2023
• Annual Financial Turnover for FY- 2023-2024
• Annual Financial Turnover for FY- 2024-2025
• work experience of similar nature
• Character certificate issued by DM or SP (Mandatory)
• Bidding Capacity in Rupees
• Enter no of Civil Engg Degree holder Enter No of Civil Engg Diploma holder Enter No of Other Technical Staff / Supervisory Staff
• Plants and Equipment owned by bidder in Working Condition Which will be available at This Work Site
1 Mixer Machine With Weighing Facility
2 Steel shuttering Minimum 2000 Sft
3 Water Tanker
4 Vibrator (Needle and Surface)
• Bank credit and/or Self Declaration submitted / uploaded Particulars
1.Certificate of Bank for credit facility 10 %
2 Self declaration for investing 25 %
• Necessary undertakings submitted / uploaded UNDERTAKINGS
1. Not abandoned any project
2. Never been in Litigation
3. No relative or any person Working in Department
4. Not Debarred / Blacklisted from any Govt. , PSU Dept.
• Number of projects completed in stipulated time during Last five Years
CIVIL
PERCENTAGE
L1
1
10 documents required · 10 mandatory
₹10,000
Processing Fee: 590
₹1.3 L
OFFICE OF THE S.E Darbhanga Circle, Building Construction Department,
9 Jun 2026
9 Jun 2026
4 Jul 2026
9 Jun 2026
2 Jul 2026
9 Jun 2026
12 Jun 2026
Total Length of Compound wall=597.72m
North side
West side
East side
South side
Earthwork in excavation in as(exceeding 30cm in depth.1.5m in width as well as 10sqm on plan) incloding dressing of sides and ramming of bottom,lift upto 1.5 including getting out the excavated soil and disposal of surplus soil as directed within a lead of...
Plinth Protection Along Compound wall
North side
West side
East side
South side
Brick Drain Along Compound wall
North side
West side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
Net Qty=(i+ii)
Suppliying and filling in plinth with local sand and under floots including watering, ramming consolidating and dressing complete.
Plinth Protection Along Compound wall
North side
West side
East side
South side
Brick Drain Along Compound wall
North side
West side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
Net Qty=(i+ii)
Providing 100A one brick on Flat soling joints filled with local sand including cost of watering texes royalty all complete as per building specification and direction of E/I.
Plinth Protection Along Compound wall
North side
West side
East side
South side
Brick Drain Along Compound wall
North side
West side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
Net Qty=(A+B)
Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level.1:2:4(1 Cement: 2 coarse sand:4 graded stone aggregate 20mm nominal size)
Area vide 3(A)
Area vide 3(B)
Net Qty=(A+B)
Brick work with bricks of class designation 100A in foundations and plinth in : Cement mortar 1:6 (1 cement: 6 coarse sand )
Brick Drain Along Compound wall
North side
West side
East side
South side
Main Gate to School Building
Approach Road upto Hostel-1 & 2
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
Reinforced cement concrete work in wall (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upt floor five level excluding cost of centring, shuttering, finishin and reinforcement. 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
Drain Deck Slab
North side
West side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
Reinforcement for RCC work including straightening, cutting, bending, placing in position and bonding all complete.
Qty vide item no. 6
Centring and shuttering including strutting, propping etc. and removal of form for foundation, footings, bases of columns etc. for mass concrete.
(A) Lintels, beams
Brick Drain Along Compound wall
North side
West side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
P/V 12mm CP(1:3) with Neat cement punning etc all complete jobs.
Plinth Protection Along Compound wall
North side
West side
East side
South side
Brick Drain Along Compound wall (250+600+400+600+250=2100)
North side
West side
East side
South side
Connecting Brick Drain (250+450+300+450+250=1700)
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
Finishing wall with Water proofing cement paint for interior & ext surface etc all comp jobs.
Compound wall one side Painting due to make of Plinth Protection & Drain work
North side
West side
East side
South side
Less Gate-1
Less Gate-2
Painting with ready mixed paint over Steel surface with primer etc all comp jobs.
Main Gate-1
Main Gate-2
Excavating, supplying and filling of local earth (including royalty but excluding cairriage cost) by mechanical transport upto a lead of 3km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. If local earth is available at more than 3 km lead the actual lead must be approved by compitent authority. cairraiage of material will be paid seperately and calculated after deducting initial lead etc all complete jobs.
Along Compound wall
North side
West side
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. etc all complete jobs.
With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30
Main Gate to School Building
Approach Road upto Hostel-1 & 2
P/V PCC M20 (1:1.5:3) in F/P level etc all complete jobs.
Main Gate to School Building
Approach Road upto Hostel-1 & 2
S/F/F Motor Grader 3.35 metre blade for Jungle cleaning etc all complete jobs.
Carriage of Materials
(i) K Sand
(ii) Stone Chips
(iii) Bricks
(iv) Local Sand (1km kutcha +2km pacca)
e) L-Earth
e) G.S.B G-1
Difference cost of Materials
(ii) Cement
(i) Bricks
Total
J.E. BCD DARBHANGA
STATEMENT OF MATERIALS
L-sand filling
100A B/F Soling
Total=
J.E. BCD DARBHANGA
P/V labour for cleaning the site & uprooting trees etc all complete jobs.
Boring/drilling bore well of required dia for casing/strainer pipe by suitable method 150mm dia etc all complete job as per building specification & direction of E/I.
Supplying assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well casing (CM) pipe of required 110mm dia etc all complete job as per building specification & direction of E/I.
Supplying assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well casing (CM) pipe of required 100mm dia etc all complete job as per building specification & direction of E/I.
Supplying assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well filter of required 100mm dia etc all complete job as per building specification & direction of E/I.
Gravel packing in tubewell construction in accordance with IS:4097 including providing gravel line/medium/coarse in required grading and sizes etc all complete job as per building specification & direction of E/I.
S/F/F 40x1.82m long P.V.C Strainer etc all complete jobs.
S/F/ 100x40mm PVC Reducer etc all complete jobs.
Providing and fixing chlorinated Polyvinyl Chloride (CPVC) pipes havaing thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings etc all complete jobs.
a) 40mm dia
S/F/F suitable size threaded mild steel cap etc all complete jobs.
S/F/F 40mm dia Gate valve etc all complete jobs.
S/F/F M.S clamp of required dia etc all complete jobs.
Additional water required during boring of submersible etc all complete jobs.
S/F/F fully automatic single phase starter etc all complete jobs.
S/F/F submersible wire cable etc all complete jobs.
S/F/F 1HP submersible motor ISI mark etc all complete jobs.
Development of Submersible in accordance with IS:2800 (Part_1) and IS:1189 to establism maximum rate of usable water yield without sand content with required capacity air compressor running the compressor for required time as per direction of E/I etc all complete jobs.
Constructing masonry Chamber 60x45x50 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for water meter complete with C.I. double flap surface box etc all complete jobs.
P/V & fixing CPVC pipes for External work etc all complete jobs.
40mm dia
Cost of 1 No. Submersibble
So cost of 2 Nos. Submersibble
J.E BCD DARBHANGA
BILL OF QUANTITY
Reinforcement to RCC work etc all complete jobs.
P/V Centerring and shuttering etc all complete jobs.
(A) Lintel
Easing and adjusting of D/W etc all complete jobs.
a) Carpentar
b) Welder
P/F UPVCRW Pipes and Accessories------------
a.110 mm dia pipe
b. 110 mm dia single tee with door
d. 110 mm dia plain bend
d. 110 mm dia shoe
d. 110 mm dia pvc clips
Providing & fixing U.P.V.C pipes for internal work etc all complete jobs.
P/V & fixing CPVC pipes for External work etc all complete jobs.
40mm dia
P/V & fixing CPVC pipes for Internal work etc all complete jobs.
15.88 mm outer dia pipe
28.58 mm outer dia pipe
15.88 mm outer dia pipe
28.58 mm outer dia pipe
15.88 mm outer dia pipe
28.58 mm outer dia pipe
S/F/ 100x40mm PVC Reducer etc all complete jobs.
Carrige Cost of Materials
Extra cost of materials
Total
APPLY CORRECTION FACTOR .982
Add for GST 5.36%
Total
E.E BCD DARBHANGA
BILL OF QUANTITY
BOQ Amount :-
Earnest Money :-
Cost of BOQ :- Rs. Time of Comp :- Month Date of tender :-
Reinforcement to RCC work etc all complete jobs.
P/V Centerring and shuttering etc all complete jobs.
(A) Lintel
(B) Column
(C) Shelves
S/F/ 100x40mm PVC Reducer etc all complete jobs.
P/V half inch flexible copper tube gas pipe etc all complete jobs.
P/v gas valve (LPG) for domestic uses etc all complete jobs.
P/v T-Type LPG GAS Jointer valve etc all complete jobs.
Carrige Cost of Materials
Extra cost of materials
Total
Add for GST 5.36%
Total
E.E BCD DARBHANGA
Total Length of Compound wall=597.72m
North side
West side
East side
South side
Earthwork in excavation in as(exceeding 30cm in depth.1.5m in width as well as 10sqm on plan) incloding dressing of sides and ramming of bottom,lift upto 1.5 including getting out the excavated soil and disposal of surplus soil as directed within a lead of...
Brick Drain Along Compound wall
North side
West side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
Net Qty=(i+ii)
Suppliying and filling in plinth with local sand and under floots including watering, ramming consolidating and dressing complete.
Brick Drain Along Compound wall
North side
West side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
Net Qty=(i+ii)
Providing 100A one brick on Flat soling joints filled with local sand including cost of watering texes royalty all complete as per building specification and direction of E/I.
Brick Drain Along Compound wall
North side
West side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
Net Qty=(A+B)
Main Gate to School Building
Approach Road upto Hostel-1 & 2
Net Qty=(A+B)
Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level.1:2:4(1 Cement: 2 coarse sand:4 graded stone aggregate 20mm nominal size)
Area vide 3(A)
Brick work with bricks of class designation 100A in foundations and plinth in : Cement mortar 1:6 (1 cement: 6 coarse sand )
Brick Drain Along Compound wall
North side
West side
East side
South side
Main Gate to School Building
Approach Road upto Hostel-1 & 2
ADM Building to Main Drain
100 Bed Hostel to Main Drain
Reinforced cement concrete work in wall (any thickness), including attached pilasters, buttresses, plinth upt floor five level excluding cost of centring, shuttering, finishin and reinforcement. 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
Drain Deck Slab
North side
West side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
Reinforcement for RCC work including straightening, cutting, bending, placing in position and bonding all complete.
Qty vide item no. 6
Centring and shuttering including strutting, propping etc. and removal of form for foundation, footings, bases of columns etc. for mass concrete.
(A) Lintels, beams
Brick Drain Along Compound wall
North side
West side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
P/V 12mm CP(1:3) with Neat cement punning etc all complete jobs.
Brick Drain Along Compound wall (250+600+400+600+250=2100)
North side
West side
East side
South side
Connecting Brick Drain (250+450+300+450+250=1700)
ADM Building to Main Drain
100 Bed Hostel to Main Drain
Finishing wall with Water proofing cement paint for interior & ext surface etc all comp jobs.
Compound wall one side Painting due to make of Plinth Protection & Drain work
North side
West side
East side
South side
Less Gate-1
Less Gate-2
Painting with ready mixed paint over Steel surface with primer etc all comp jobs.
Main Gate-1
Main Gate-2
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. etc all complete jobs.
With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30
Main Gate to School Building
Approach Road upto Hostel-1 & 2
P/V PCC M20 (1:1.5:3) in F/P level etc all complete jobs.
Main Gate to School Building
Approach Road upto Hostel-1 & 2
Carriage of Materials
(i) K Sand
(ii) Stone Chips
(iii) Bricks
(iv) Local Sand (1km kutcha +2km pacca)
f) G.S.B G-1
Difference cost of Materials
(ii) Cement
(i) Bricks
Total
J.E. BCD DARBHANGA
STATEMENT OF MATERIALS
L-sand filling
100A B/F Soling
Total=
J.E. BCD DARBHANGA
P/V labour for cleaning the site etc all complete jobs.
P/V 100A B/F soling in F/P level etc all complete jobs.
P/V PCC M15 (1:2:4) in F/P level etc all complete jobs.
courtyard
Half brick(1:4) masonry with bricks of class designation 100A in
P/V 100A Brick Work(1:6) in F/P level etc all complete jobs.
Providing and fixing M.S.grills of required pattern in frames of windows etc. withM.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.
Sgas stand
2.5kg/sft
p/v 12 mm thick plaster in etc all complete jobs.
P/V 12mm CP(1:3) with Neat cement punning etc all complete jobs.
Applying one coat of cement primer of approved brand and manufacture on wall surface:
P/V & fixing C.P Brass bib cock etc all complete jobs.
Stainless steel kitchen sink - with drain board 510 x 1040 mm bowl depth 225 mm.
Carriage cost of materials
a) K-Sand
b) Bricks
b) S-Chips
Extra cost of materials
a) Cement
b) Bricks
Total
J.E BCD Darbhanga
STATEMENT OF MATERIALS
100A B/F Soling
Total=
Total=
J.E BCD Darbhanga
P/V labour for cleanProviding corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete..
Providing and fixing G.I. pipes complete with G.I. fittings and clamps, i/c cutting and making good the walls etc.:
P/V labour for cleaning the site etc all complete jobs.
P/V 100A B/F soling in F/P level etc all complete jobs.
P/V PCC M15 (1:2:4) in F/P level etc all complete jobs.
courtyard
Half brick(1:4) masonry with bricks of class designation 100A in
P/V 100A Brick Work(1:6) in F/P level etc all complete jobs.
Providing and fixing M.S.grills of required pattern in frames of windows etc. withM.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.
Sgas stand
2.5kg/sft
P/V 12 mm thick plaster in etc all complete jobs.
P/V 12mm CP(1:3) with Neat cement punning etc all complete jobs.
Applying one coat of cement primer of approved brand and manufacture on wall surface: New work (three or more coats)
P/V & fixing C.P Brass bib cock etc all complete jobs.
Stainless steel kitchen sink - with drain board 510 x 1040 mm bowl depth 225 mm.
Carriage cost of materials
a) K-Sand
b) Bricks
b) S-Chips
Extra cost of materials
a) Cement
b) Bricks
P/v half inch flexible copper tube gas pipe etc.
P/v gas valve (LPG) for domestic uses etc.
P/v T-Type LPG GAS Jointer valve etc.
Total
J.E BCD Darbhanga
STATEMENT OF MATERIALS
100A B/F Soling
Total=
Total=
J.E BCD Darbhanga
GOVERNMENT OF BIHAR
NAME OF DIVISION:- BUILDING CONSTRUCTION DIVSION DARBHANGA
NAME OF CIRCLE:- B.C.D. BUILDING CIRCLE DARBHANGA
ESTIMATED COST :-
REPORT
This Detailed estimate has been framed amounting to
to meet the cost of above mention work.
In this estimate provision of following items as per requirement of Building.
12mm plaster in internal and external
Water supply and Sanitary work & fittings as per requirement of Building.
This estimate has been framed as per the current schedule of rates of Building Construction Department, Bihar Patna effective from 01-01-2022. All items of work will be done as per the specification of Building Construction Department, Bihar Patna.
Estimate may kindly be sanctioned as earliest that work may be start soon.
J.E BCD Darbhanga
P/V labour for cleanProviding corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.ing and hacking of roof etc all complete jobs.
Providing and fixing G.I. pipes complete with G.I. fittings and clamps, i/c cutting and making good the walls etc.:
P/V labour for cleaning the site etc all complete jobs.
P/V 100A B/F soling in F/P level etc all complete jobs.
P/V PCC M15 (1:2:4) in F/P level etc all complete jobs.
courtyard
Half brick(1:4) masonry with bricks of class designation 100A in
P/V 100A Brick Work(1:6) in F/P level etc all complete jobs.
ProvidingandfixingM.S.grillsofrequiredpatterninframesofwindowsetc. withM.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.
Sgas stand
2.5kg/sft
p/v 12 mm thick plaster in etc all complete jobs.
P/V 12mm CP(1:3) with Neat cement punning etc all complete jobs.
Applying one coat of cement primer of approved brand and manufacture on wall surface:
P/V & fixing C.P Brass bib cock etc all complete jobs.
Stainless steel kitchen sink - with drain board 510 x 1040 mm bowl depth 225 mm.
Carriage cost of materials
a) K-Sand
b) Bricks
b) S-Chips
Extra cost of materials
a) Cement
b) Bricks
P/v half inch flexible copper tube gas pipe etc.
P/v gas valve (LPG) for domestic uses etc.
P/v T-Type LPG GAS Jointer valve etc.
Total
J.E BCD Darbhanga
STATEMENT OF MATERIALS
100A B/F Soling
Total=
Total=
J.E BCD Darbhanga
GOVERNMENT OF BIHAR
NAME OF DIVISION:- BUILDING CONSTRUCTION DIVSION DARBHANGA
NAME OF CIRCLE:- B.C.D. BUILDING CIRCLE DARBHANGA
ESTIMATED COST :-
Estimated Cost
REPORT
Estimate for FOR INSTALLATION OF SUBMERSIBLE IN A-TYPE RESIDENCE (YAMUNA BLOCK) AT L. SARAI DARBHANGA FOR THE YEAR 2023-24 is prepared with refrence to letter of .JAIL SPRITENDENT vide letter no. 3582 dated 20/10/2023 .and has been framed by executive engineer BCD building division darbhanga. This estimate is prepared for technical sanction. In this Estimate Provision has been made for supplying fitting fixing 1 h.p submersibble boring. In this estimate provision has been made for boring and driiling bore well of 300 mm dia, supplying , assembling, lowering CM PVC pipe, rms screen pipe, gravel packing , and fitting complete. In this Estimate provision has also been made for pvc outer pipe, submerssible pump, submerssible cable, starteret., In this Estimate Rate has been taken form Current BCD SOR rate effective from 01/01/2022.
J.E BCD DARBHANGA
SUBMERSIBBLE WORKS
G.L to 90.00m Depth
a) 40mm dia
Total
FOR 2 UNIT
J.E B.C.D DARBHANGA
GOVERNMENT OF BIHAR
NAME OF DIVISION:- BUILDING CONSTRUCTION DIVSION DARBHANGA
NAME OF CIRCLE:- B.C.D. BUILDING CIRCLE DARBHANGA
ESTIMATED COST :-
REPORT
This Detailed estimate has been framed amounting to
to meet the cost of above mention work.
In this estimate provision of following items as per requirement of Building.
12mm plaster in internal and external
Water supply and Sanitary work & fittings as per requirement of Building.
This estimate has been framed as per the current schedule of rates of Building Construction Department, Bihar Patna effective from 01-01-2022. All items of work will be done as per the specification of Building Construction Department, Bihar Patna.
Estimate may kindly be sanctioned as earliest that work may be start soon.
J.E BCD Darbhanga
P/V labour for cleaning the site etc all complete jobs.
P/V 100A B/F soling in F/P level etc all complete jobs.
P/V PCC M15 (1:2:4) in F/P level etc all complete jobs.
courtyard
Half brick(1:4) masonry with bricks of class designation 100A in
P/V 100A Brick Work(1:6) in F/P level etc all complete jobs.
Providing and fixing M.S.grills of required pattern in frames of windows etc. withM.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.
Sgas stand
2.5kg/sft
p/v 12 mm thick plaster in etc all complete jobs.
P/V 12mm CP(1:3) with Neat cement punning etc all complete jobs.
Applying one coat of cement primer of approved brand and manufacture on wall surface:
P/V & fixing C.P Brass bib cock etc all complete jobs.
Stainless steel kitchen sink - with drain board 510 x 1040 mm bowl depth 225 mm.
Carriage cost of materials
a) K-Sand
b) Bricks
b) S-Chips
Extra cost of materials
a) Cement
b) Bricks
Total
J.E BCD Darbhanga
STATEMENT OF MATERIALS
100A B/F Soling
Total=
Total=
J.E BCD Darbhanga
E/W in Excavation in foundation & trenches etc all complete jobs.
Guard Post
For Grade Beam
Plinth Protection
P/V local sand filling in F/P level etc all complete jobs.
Guard Post
For Grade Beam
Plinth Protection
Guard post Plinth
P/V 100A B/F soling in F/P level etc all complete jobs.
Guard Post
For Grade Beam
Plinth Protection
Guard post Plinth
P/V PCC M15 (1:2:4) in F/P level etc all complete jobs.
Guard Post
Plinth Protection
Guard post Plinth
P/V RCC M20 (1:1.5:3) in F/P level etc all complete jobs.
Guard Post
Stiffener up to G.Level
G/Beam
Stiffener up to P.Level
Guard post Plinth Band
P/V 100A Brick Work(1:4) in F/P level etc all complete jobs.
Steps
Plinth Protection
P/V RCC M20 (1:1.5:3) in Stiffener & column etc all complete jobs.
Stiffener up to Top
Lintel
Roof Beam Beam
Guard post Inner Shelves
Guard Chajja
Chajja at Sill & Lintel (Box Window)
Chajja at Sill & Lintel (Box Window)
Parapet Stiffener
Parapet Band
Parapet Band
P/V 100A Brick Work(1:4) in S/S level etc all complete jobs.
Parapet
Reinforcement to RCC work etc all complete jobs.
Qty Vide item no. 5+7
P/V Centerring and shuttering etc all complete jobs.
Foundation
Footing
Stiffener up to G.Level
Grade Beam
G/Beam
Guard post Plinth Band
Guard post Lintel
Guard post Roof Beam
Guard post Inner Shelves
Guard post Roof
Parapet Band
Column
Stiffener up to Top
Parapet Stiffener
Chajja
Guard Chajja
P/V 12mm CP(1:6) in wall etc all complete jobs.
Guard post Internal
P/V 6mm CP(1:4) in ceiling etc all complete jobs.
Guard post Ceiling
Chajja
P/V 15mm CP(1:6) in wall etc all complete jobs.
External Area (LxB)
Parapet
P/V 12mm CP(1:3) with NCP etc all complete jobs.
up to plinth
Plinth Protection
Step side wall
Providing and laying floor/Indora/Parking tiles 600x300 mm in Main gate (thickness to be specified by the manufacturer) etc complete.
Floor
Skirting
Shelves
Steps
Front wall
P/V and fixing M.S Grill etc all complete jobs.
W (from 12mm square bar at 3" c/c)
P/V and fixing factory made UPVC white colour sliding glazed for D/W etc all complete jobs.
P/V and applying white cement based putty 2mm etc all comp jobs.
Finishing walls with water proofing cement paint for exterior surface etc all comp jobs.
Painting with ready mixed paint over new Steel surface etc all comp jobs.
S/F/F 300mm Height metal letter for naming with logo with all fitting etc all complete jobs.
as per market rate
Carriage cost of materials
a) K-Sand (Lead 140KM)
b) S-Chips
c) Bricks (7P+1K)
d) L-Sand (2P+1K)
Extra cost of materials
a) Cement
b) Bricks (7P+1K)
COST OF 1 NO. OF GUARD POST
SO COST OF 2 NOS. OF GUARD POST
J.E BCD DARBHANGA
STATEMENT OF MATERIALS
L-sand filling
100A B/F Soling
Tiles work
J.E BCD DARBHANGA
Total Length of Compound wall=399.47m
North side
East side
South side
Earthwork in excavation in as(exceeding 30cm in depth.1.5m in width as well as 10sqm on plan) incloding dressing of sides and ramming of bottom,lift upto 1.5 including getting out the excavated soil and disposal of surplus soil as directed within a lead of...
Brick Drain Along Compound wall
North side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
Suppliying and filling in plinth with local sand and under floots including watering, ramming consolidating and dressing complete.
Brick Drain Along Compound wall
North side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
Providing 100A one brick on Flat soling joints filled with local sand including cost of watering texes royalty all complete as per building specification and direction of E/I.
Brick Drain Along Compound wall
North side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
Net Qty=(A+B)
Providing and laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level.1:2:4(1 Cement: 2 coarse sand:4 graded stone aggregate 20mm nominal size)
Area vide 3
Net Qty=(A+B)
Brick work with bricks of class designation 100A in foundations and plinth in : Cement mortar 1:6 (1 cement: 6 coarse sand )
Brick Drain Along Compound wall
North side
East side
South side
Main Gate to School Building
Approach Road upto Hostel-1 & 2
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
Reinforced cement concrete work in wall (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upt floor five level excluding cost of centring, shuttering, finishin and reinforcement. 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
Drain Deck Slab
North side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
Reinforcement for RCC work including straightening, cutting, bending, placing in position and bonding all complete.
Qty vide item no. 6
Centring and shuttering including strutting, propping etc. and removal of form for foundation, footings, bases of columns etc. for mass concrete.
(A) Lintels, beams
Brick Drain Along Compound wall
North side
East side
South side
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
P/V 12mm CP(1:3) with Neat cement punning etc all complete jobs.
Brick Drain Along Compound wall (250+600+400+600+250=2100)
North side
East side
South side
Connecting Brick Drain (250+450+300+450+250=1700)
ADM Building to Main Drain
100 Bed Hostel to Main Drain
150 Bed Hostel to Main Drain
Finishing wall with Water proofing cement paint for interior & ext surface etc all comp jobs.
Compound wall one side Painting due to make of Plinth Protection & Drain work
North side
East side
South side
Less Gate-1
Less Gate-2
Painting with ready mixed paint over Steel surface with primer etc all comp jobs.
Main Gate-1
Main Gate-2
Excavating, supplying and filling of local earth (including royalty but excluding cairriage cost) by mechanical transport upto a lead of 3km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. If local earth is available at more than 3 km lead the actual lead must be approved by compitent authority. cairraiage of material will be paid seperately and calculated after deducting initial lead etc all complete jobs.
Along Compound wall
North side
South side
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. etc all complete jobs.
With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30
Main Gate to School Building
Approach Road upto Hostel-1 & 2
P/V PCC M20 (1:1.5:3) in F/P level etc all complete jobs.
Main Gate to School Building
Approach Road upto Hostel-1 & 2
Carriage of Materials
(i) K Sand
(ii) Stone Chips
(iii) Bricks
(iv) Local Sand (1km kutcha +2km pacca)
e) L-Earth
e) G.S.B G-1
Difference cost of Materials
(ii) Cement
(i) Bricks
Total
J.E. BCD DARBHANGA
STATEMENT OF MATERIALS
L-sand filling
100A B/F Soling
Total=
J.E. BCD DARBHANGA
P/V labour for cleaning site etc all complete jobs.
Taking in & taking out of material
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.
SCHOOL BUILDING
G.Floor Down slab
Toilet
Toilet
Girls Toilet
First Floor
Girls Toilet
Ground Floor Wall Tiles
Toilet
Toilet
Girls Toilet
First Floor
Girls Toilet
Door Jam
Deduction D2
Deduction D3
100 BEDDED HOSTEL BUILDING
Toilet Left side
Toilet Right side
Pantry Toilet
Warden Kitchen
Warden W.C
G.Floor Room Internal wall area=2(L+B)xH
Toilet
Toilet
Kitchen
Dinning Hall
Pantry
Kitchen
Washing
Toilet
Manager
store
Deduction D2
Deduction D2
Deduction D3
Deduction D3
First Floor
Toilet
Toilet
Deduction D2
Deduction D3
Deduction D3
150 BEDDED HOSTEL BUILDING
Ground Floor
Left & Right side Toilet
Warden's WC
Toilet In Courtyard
First Floor
Left & Right side Toilet
Toilet
Toilet
Warden's Kitchen
Door jam
Door jam
Deduction D2
Deduction D3
First Floor
Toilet
Toilet
Door jam
Door jam
Deduction D2
Deduction D3
Net Qty=(A1+A2+B1+B2+C1+C2)
Dismantling stone slab flooring etc all complete jobs.
Area vide item no. 2(A1+B1+C1)
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Area vide item no. 2(A2+B2+C2)
Area vide item no. 29(X1)
Taking 15% area of (A)
Area vide item no. 31(a)
Taking 25% area of (A)
Net Qty=(i+ii+iii)
Demolishing cement concrete including disposal of materials etc all complete jobs.
SCHOOL BUILDING
Ground Floor
Portico
Waiting Area
Store
Spare Room
Biology Laboratory
Store Room
Chemistry Laboratory
Store Room
Physics Laboratory
Store Room
Staff Room
Store
Veranda
Passage
Generator Room
Common Room
Office
Library
Principal Room
100 BEDDED HOSTEL BUILDING
G.Floor
Portico
Waiting Area
Passage
Passage
Visitor
Office
Warden Drawing area
Veranda
Dinning Hall
Pantry
150 BEDDED HOSTEL BUILDING
G.Floor
Portico
Visitor
Passage
Passage
Lobby
Office
Sick Room
Reading
Warden's Hall
Visitor
Dinning Area
Pantry
Net Qty=(A+B+C)
P/V PCC M15 (1:2:4) in F/P level etc all complete jobs.
Qty vide item no. 2(i)
SCHOOL BUILDING
G.Floor Down slab
Toilet
Toilet
Girls Toilet
First Floor
Girls Toilet
100 BEDDED HOSTEL BUILDING
Toilet Left side
Toilet Right side
Pantry Toilet
Warden Kitchen
Warden W.C
150 BEDDED HOSTEL BUILDING
Ground Floor
Left & Right side Toilet
Warden's WC
Toilet In Courtyard
First Floor
Left & Right side Toilet
Net Qty=(A1+B1+C1)
12 mm cement plaster of mix:1:6 (1 cement:6 coarse sand) as per building specification and direction of E/l, etc all complete jobs.
Area vide item no. 2(A2+B2+C2)
Providing and laying water proofing treatment to vertical and horizontal surfaces of depressed portions of W.C. kitchen and the like consisting of: (i) 1st course of applying cement slurry @ 4.4 kg/sqm mixed with water proofing compound conforming tc IS 2645 in recommended proportions. (ii) 2nd course of 20 mm cement plaster 1:3 (1 cement:3 coarse sand)mixed with water proofing compound in recommended proportion,
Sunken Floor
SCHOOL BUILDING
G.Floor Down slab
Toilet
Toilet
Girls Toilet
First Floor
Girls Toilet
100 BEDDED HOSTEL BUILDING
Toilet Left side
Toilet Right side
Pantry Toilet
Warden Kitchen
Warden W.C
150 BEDDED HOSTEL BUILDING
Ground Floor
Left & Right side Toilet
Warden's WC
Toilet In Courtyard
First Floor
Left & Right side Toilet
Net Qty=(A1+B1+C1)
Providing well burnt brick bats or Jhama bricks including ramming properly till compacted thickness is achieved, curing and carriage of water with all leads, making proper slope and blinding the top with cement mortar (1:10) all complete as per building specification and direction of E/I..
SCHOOL BUILDING
Down Slab
Toilet
Toilet
Girls Toilet
First Floor
Girls Toilet
100 BEDDED HOSTEL BUILDING
Toilet Left side
Toilet Right side
Pantry Toilet
Warden Kitchen
Warden W.C
150 BEDDED HOSTEL BUILDING
Ground Floor
Left & Right side Toilet
Warden's WC
Toilet In Courtyard
First Floor
Left & Right side Toilet
Net Qty=(A1+B1+C1)
Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specified by the manufacturer) of ist quality conforming to IS : 15622 of approved make in colours such shades except white , Ivory , Grey , Fume Red , Brown , laid on 20 mm thick Cement motar 1:4 (1 cement: 4 coarse sand ) including pointing the joints with white cement and matching pigment etc., complete.
SCHOOL BUILDING
Ground Floor
Toilet
Toilet
Girls Toilet
First Floor
Girls Toilet
Door Sill
Door Sill
100 BEDDED HOSTEL BUILDING
Left Side Toilet
Right Side Toilet
Kitchen
Toilet
First Floor
Left Side Toilet
Right Side Toilet
Door Sill
Door Sill
150 BEDDED HOSTEL BUILDING
Ground Floor
Left & Right side Toilet
Warden's Kitchen
Toilet In Courtyard
Door Sill
First Floor
Left & Right side Toilet
Door Sill
Net Qty=(A1+B1+C1)
Providing and laying Ceramic glazed wall tiles 300x300 mm (thickness to be specified by the manufacturer) of 1 st quality conforming to IS : 13755 of NITCO , ORIENT , SOMANY , KAJARIA or equivalent make in colours such as white , Ivory , Grey , Fume , Red , Brown , laid on 20 mm thick cement motar 1:4 (1 cement: 4 Coarse sand) including grouting the joints with white cement and matching pigments etc complete.
SCHOOL BUILDING
Ground Floor
Toilet
Toilet
Girls Toilet
First Floor
Girls Toilet
Door Jam
Deduction D2
Deduction D3
100 BEDDED HOSTEL BUILDING
G.Floor Room Internal wall area=2(L+B)xH
Toilet
Toilet
Door jam
Door jam
Deduction D2
Deduction D3
First Floor
Toilet
Toilet
Door jam
Door jam
Deduction D2
Deduction D3
150 BEDDED HOSTEL BUILDING
Toilet
Toilet
Door jam
Door jam
Deduction D2
Deduction D3
First Floor
Toilet
Toilet
Door jam
Door jam
Deduction D2
Deduction D3
Net Qty=(A1+B1+C1)
Renewing glass panes in D/W etc all comp jobs.
G.Floor
F.Floor
Mumty W2
Taking 40% area for Glass of (A)
100 BEDDED HOSTEL BUILDING
G.Floor
F.Floor
Mumty W2
Taking 40% area for Glass of (B)
150 BEDDED HOSTEL BUILDING
G.Floor
F.Floor
Mumty W2
Taking 40% area for Glass of (C)
Net area=(i+ii+iii)
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after etc. complete as per directions and approval of Engineer- in-charge .
Kota stone slabs 20 mm thick in risers of steps skirting dado & pillars laid in floor etc all complete jobs.
SCHOOL BUILDING
G.Floor
Portico
Waiting Area
Store
Spare Room
Biology Laboratory
Store Room
Chemistry Laboratory
Store Room
Physics Laboratory
Store Room
Staff Room
Store
Veranda
Passage
Generator Room
Common Room
F.Floor
Waiting Area
Veranda
Passage
Store Room
100 BEDDED HOSTEL BUILDING
G.Floor
Portico
Waiting Area
Passage
Passage
F.Floor
Store
Passage
Passage
150 BEDDED HOSTEL BUILDING
G.Floor
Portico
Visitor
Passage
Passage
F.Floor
Passage
Passage
Net Qty=(A+B+C)
Kota stone slabs 20 mm thick in risers of steps skirting dado & pillars laid in floor etc all complete jobs.
SCHOOL BUILDING
G.Floor
Portico
Waiting Area
Store
Spare Room
Biology Laboratory
Store Room
Chemistry Laboratory
Store Room
Physics Laboratory
Store Room
Staff Room
Store
Veranda
Passage
Generator Room
Common Room
F.Floor
Waiting Area
Veranda
Passage
Store Room
100 BEDDED HOSTEL BUILDING
G.Floor
Portico
Waiting Area
Passage
Passage
F.Floor
Store
Passage
Passage
150 BEDDED HOSTEL BUILDING
G.Floor
Portico
Visitor
Passage
Passage
F.Floor
Passage
Passage
Net Qty=(A+B+C)
P/V and laying 60x60cm vitrified tiles in floor etc all complete jobs.
SCHOOL BUILDING
G.Floor
Office
Library
Principal Room
F.Floor
Class Room-1
Class Room-2
Class Room-3
Class Room-4
Staff Room
Class Room-5
Class Room-6
Class Room-7
Class Room-8
Computer Room
100 BEDDED HOSTEL BUILDING
G.Floor
Visitor
Office
Warden Drawing area
Veranda
Dinning Hall
Pantry
F.Floor
Store
Toilet
Sick Room
Passage
Passage
Common Room
150 BEDDED HOSTEL BUILDING
G.Floor
Lobby
Office
Sick Room
Reading
Warden's Hall
Visitor
Dinning Area
Pantry
F.Floor
Sick Room
Reading
Locker room
Net Qty=(A+B+C)
P/V and laying vitrified tiles in skirting etc all complete jobs.
SCHOOL BUILDING
G.Floor
Office
Library
Principal Room
F.Floor
Class Room-1
Class Room-2
Class Room-3
Class Room-4
Staff Room
Class Room-5
Class Room-6
Class Room-7
Class Room-8
Computer Room
100 BEDDED HOSTEL BUILDING
G.Floor
Visitor
Office
Warden Drawing area
Veranda
Dinning Hall
Pantry
F.Floor
Store
Toilet
Sick Room
Passage
Passage
Common Room
150 BEDDED HOSTEL BUILDING
G.Floor
Lobby
Office
Sick Room
Reading
Warden's Hall
Visitor
Dinning Area
Pantry
F.Floor
Sick Room
Reading
Locker room
Net Qty=(A+B)
P/V and fixing PVC Door frames etc all complete jobs.
P/V and fixing PVC Door shutters etc all complete jobs.
P/V local woods work in Chaukhat of Doors and windows etc all comp jobs.
P/V and fixing 30mm thick non decorative flush door shutters etc all comp jobs.
Net Qty=(A+B+C)
P/V and fixing steel glazed windows etc all complete jobs.
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
Extra for providing and fixing steel beading in glazed windows etc all complete jobs.
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.
Easing and adjusting of D/W etc all complete jobs.
P/V labour for cleaning and hacking of roof etc all complete jobs.
Over Portico
1st Floor Terrace
Mangra along Parapet
1st Floor Terrace
Mangra along Parapet
2nd Floor Terrace
Mumty
Mangra along Parapet
100 BEDDED HOSTEL BUILDING
Over Portico
Mangra along Parapet
1st Floor Terrace
Mangra along Parapet
1st Floor Terrace
Mangra along Parapet
2nd Floor Terrace
Mangra along Parapet
Mangra along Parapet
Mangra along Parapet
Less Column
Add Column
150 BEDDED HOSTEL BUILDING
Over Portico
Mangra along Parapet
1st Floor Terrace
Mangra along Parapet
2nd Floor Terrace
Less Mumty
Less Column
Mumty
Mangra along Parapet
Add Column
Net Qty=(A+B+C)
Taking 25% area of (i)
100 sft for one Labour
P/V 20mm CP(1:3) for levelling etc all complete jobs.
Area vide tem no- 26(ii)
Providing and laying in situ seven course water proofing treatment with A.P.P etc….
Area vide tem no- 26(ii)
Finishing with Deluxe Multi surface paint system for interiors and exteriors as per manufacturers specifications.
SCHOOL BUILDING
Portico
Waiting Area
Office
Store
Spare Room
Biology Laboratory
Store
Chemistry Laboratry
Store
Physics Laboratry
Store
Stair case
Staff Room
Toilet
Store
Library
Toilet
Principal Room
Passage
Passage
Generator Room
Toilet
Toilet
Common Room
D/W Sill & Jambs
C.Gate
Grill Gate
Deduction
Grill Gate
Grill
Grill above Grill gate
C.Gate
Grill Gate
Less Opening
Less Opening
G.Floor Ceiling Area
Portico
Waiting Area
Office
Store
Spare Room
Biology Laboratory
Store Room
Chemistry Laboratory
Store Room
Physics Laboratory
Store Room
Stair Room W/S
Staff Room
Toilet
Store
Library
Toilet
Toilet
Principal Room
Veranda
Beam in Veranda
Passage
Beam in Passage
Generator Room
Toilet
Toilet
Common Room
G.Floor Net area=(A-X+B)
F.Floor Room Internal wall area=2(L+B)xH
Waiting Area
Class Room-1
Class Room-2
Class Room-3
Class Room-4
Staff Room
Class Room-5
Class Room-6
Class Room-7
Class Room-8
Computer Room
Stair Room
Veranda
Passage
Store Room
Toilet
Toilet
D/W Sill & Jambs
Deduction
Less Opening
F.Floor Ceiling Area
Waiting Area
Class Room-1
Class Room-2
Class Room-3
Class Room-4
Staff Room
Class Room-5
Class Room-6
Class Room-7
Class Room-8
Computer Room
Stair Room W/S
Veranda
Beam in Veranda
Beam in Veranda
Passage
Beam in Passage
Store Room
Toilet
Toilet
F.Floor Net area=(C-Y+Z)
Mumty
Ceiling
Less D1
Less W2
Less wall tiles Area Vide item no. 25/29(A)
Net area=(i+ii+iii-iv)
100 BEDDED HOSTEL BUILDING
G.Floor Room Internal wall area=2(L+B)xH
Portico
Waiting Area
Visitor
Toilet
Office
Stair case
Toilet
Warden Drawing area
Kitchen
Veranda
Passage
Passage
Dinning Hall
Pantry
Kitchen
Washing
Toilet
Manager
store
Court Yard
D/W Sill & Jambs
C.Gate-1
C.Gate-2
Grill Gate
Grill
Deduction
C.Gate-1
C.Gate-2
Grill Gate
Grill
Less Opening
Less Opening
G.Floor Ceiling Area
Portico
Waiting Area
Visitor
Toilet
Office
Stair Room W/S
Toilet
Warden Drawing area
Kitchen
Veranda
Passage
Passage
Dinning Hall
Pantry
Kitchen
Washing
Toilet
Manager
store
Beam in Room
Passage
G.Floor Net area=(A-X+B)
F.Floor Room Internal wall area=2(L+B)xH
Store
Toilet
Sick Room
Passage
Passage
Common Room
Stair Case
Toilet
D/W Sill & Jambs
Grill
Less Opening
Deduction
Grill
Less Opening
F.Floor Ceiling Area
Store
Toilet
Sick Room
Passage
Passage
Common Room
Stair Room W/S
Toilet
Beam in Room
Passage
F.Floor Net area=(C-Y+Z)
Mumty
Ceiling
Less D1
Less W2
Less wall tiles Area Vide item no. 25/29(A)
Net area=(i+ii+iii-iv)
150 BEDDED HOSTEL BUILDING
G.Floor Room Internal wall area=2(L+B)xH
Portico
Lobby
Office
Sick Room
Toilet
Reading
Stair case
Toilet
Warden's Hall
Kitchen
Visitor
Passage
Passage
Dinning Area
Pantry
Manager
Kitchen
Wash Area
Store
Passage
Court Yard
D/W Sill & Jambs
C.Gate-1
C.Gate-2
Less Opening
Less Opening
Less Opening
Deduction
C.Gate-1
C.Gate-2
Less Opening
Less Opening
Less Opening
G.Floor Ceiling Area
Portico
Lobby
Office
Sick Room
Toilet
Reading
Stair case
Toilet
Warden's Hall
Kitchen
Visitor
Passage
Passage
Dinning Area
Pantry
Manager
Kitchen
Wash Area
Store
Passage
Beam in Room
Passage
G.Floor Net area=(A-X+B)
F.Floor Room Internal wall area=2(L+B)xH
Sick Room
Toilet
Reading
Stair case
Toilet
Locker room
Passage
Passage
D/W Sill & Jambs
Less Opening
Deduction
Less Opening
F.Floor Ceiling Area
Sick Room
Toilet
Reading
Stair case
Toilet
Locker room
Passage
Passage
Beam in Room
Passage
F.Floor Net area=(C-Y+D)
Mumty
Ceiling
Less D1
Less W4
Less wall tiles Area Vide item no. 25/29(A)
Net area=(i+ii+iii-iv)
Net area=(P+P1+P2)
P/V and applying white cement based putty of avg thickness 2mm etc all comp jobs.
Taking 25% area of (A)
Finishing wall with water proofing cement paint for exterior surface etc as per manufacturers specifications.
1st Floor Parapet
Outer Area
Column Projection
G.Floor & F.Floor Chajja
Front Chajja
Left Side Chajja
Back Side Chajja
Back Chajja
Right Side Chajja
Right Side Portico
Mumty
Projected
Parapet
Column Projection
100 BEDDED HOSTEL BUILDING
Outer Area
Column Projection
Column Projection
Portico
Column Projection
Column Projection
Column Projection
Mumty
1st Floor Terrace
Parapet
Parapet
2nd Floor Parapet
2nd Floor Parapet
2nd Floor Parapet
Add Column
G.Floor Chajja
150 BEDDED HOSTEL BUILDING
Portico
Mumty
Column Projection
Column Projection
1st Floor Terrace
Parapet
2nd Floor Parapet
2nd Floor Parapet
2nd Floor Parapet
Add Column
G.Floor Chajja
F.Floor Chajja
Net Qty=(i+ii+iii)
Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade:
SCHOOL BUILDING
F.Floor
100 BEDDED HOSTEL BUILDING
G.Floor
F.Floor
150 BEDDED HOSTEL BUILDING
G.Floor
F.Floor
Mumty D1
Net Qty=(X+Y+Z)
Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade
Grill Gate
Grill
Grill above Grill gate
C.Gate
Grill Gate
F.Floor
100 BEDDED HOSTEL BUILDING
C.Gate-1
C.Gate-2
Grill Gate
Grill
F.Floor
Grill
150 BEDDED HOSTEL BUILDING
C.Gate-1
C.Gate-2
F.Floor
Net Qty=(X+Y+Z)
P/V Aluminium sliding door bolts(300x16)mm etc all complete jobs.
P/V Aluminium sliding tower bolts(300x16)mm etc all complete jobs.
P/V & fixing Aluminium handles etc all complete jobs.
P/V & fixing aluminium hanging floor door stopper etc all complete jobs.
Supplying assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well casing (CM) pipe of required 100mm dia etc all complete jobs.
i) 150mm dia for outer connection
Cutting holes of required size in brick masonry wall for fixing of exhaust fan including providing and fixing 300 mm dia PVC pipe conforming BIS12818 and making good the same etc. complete as per direction of Engineer-in-charge.
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
P/V & fixing C.P Brass bib cock etc all complete jobs.
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
P/V & fixing C.P Brass stop cock etc all complete jobs.
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
P/V & fixing C.P Brass long nose bib cock etc all complete jobs.
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
P/V & fixing Waste pipe for basin and sink etc all complete jobs.
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
P/V & fixing gun metal non return valve 32mm dia etc all complete jobs.
Horizontal
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
Vertical
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
Vertical
P/V & fixing white glazed IWC pan etc all complete jobs.
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
Providing and fixing water closet squatting pan (European type) etc all complete jobs.
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
P/V & fixing Vitreous china 10 litres low level cistern with fittings etc all complete jobs.
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
P/V & fixing white glazed hand wash basin etc all complete jobs.
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
Providing and placing on terrace polyethylene water storage tank etc all complete jobs.
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
P/V & fixing following items etc all complete jobs.
Mirror
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
Soap Dish holder
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
Towel Handles
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
P/V & fixing UPVCRWD pipes etc all complete jobs.
SCHOOL BUILDING
110mm dia
110mm dia S/T with door
110mm dia band
110mm dia shoe
110mm dia PVC clips
100 BEDDED HOSTEL BUILDING
110mm dia
110mm dia S/T with door
110mm dia band
110mm dia shoe
110mm dia PVC clips
150 BEDDED HOSTEL BUILDING
110mm dia
110mm dia S/T with door
110mm dia band
110mm dia shoe
110mm dia PVC clips
P/V & fixing CPVC pipes for Internal work etc all complete jobs.
15mm dia
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
25mm dia
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
P/V & fixing CPVC pipes for External work etc all complete jobs.
15mm dia
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
25mm dia
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
40mm dia
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
P/V & fixing CPVC pipes for Internal work etc all complete jobs.
SCHOOL BUILDING
15.88 mm outer dia pipe
28.58 mm outer dia pipe
15.88 mm outer dia pipe
28.58 mm outer dia pipe
15.88 mm outer dia pipe
28.58 mm outer dia pipe
100 BEDDED HOSTEL BUILDING
15.88 mm outer dia pipe
28.58 mm outer dia pipe
15.88 mm outer dia pipe
28.58 mm outer dia pipe
15.88 mm outer dia pipe
28.58 mm outer dia pipe
150 BEDDED HOSTEL BUILDING
15.88 mm outer dia pipe
28.58 mm outer dia pipe
15.88 mm outer dia pipe
28.58 mm outer dia pipe
15.88 mm outer dia pipe
28.58 mm outer dia pipe
S/F/F Brick masonry chamber 60x60x75cm etc all complete jobs.
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
Constructing masonry Chamber 60x60x75 cm, inside in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for fire hydrants,with C.I. surface box 350x350 mm top and 165 mm deep ( inside)with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) complete as per standard design...
SCHOOL BUILDING
100 BEDDED HOSTEL BUILDING
150 BEDDED HOSTEL BUILDING
Excavating, supplying and filling of local earth (including royalty but excluding cairriage cost) by mechanical transport upto a lead of 3km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. If local earth is available at more than 3 km lead the actual lead must be approved by compitent authority. cairraiage of material will be paid seperately and calculated after deducting initial lead. etc all complete jobs.
Carriage cost of materials
a) K-Sand (Lead 140KM)
b) S-Chips
c) Bricks (7P+1K)
d) Local Earth
Extra cost of materials
a) Cement
b) Bricks (7P+1K)
Total
J.E BCD DARBHANGA
STATEMENT OF MATERIALS
Kota Stone
Vitrified Tiles
Skirting
Floor Tiles
Wall tiles
Brick Bats
Total=
J.E BCD DARBHANGA
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
ENC_LT NO_1094.pdf
NIT • 3.92 MB
NIT-04_ 2026-27.pdf
NIT • 3.24 MB
BOQ BRICK DRAIN BADH POKHAR DARBHANGA..xlsx
NIT • 0.52 MB
Download all tender documents and submit your bid