Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹25.0 LAccepted-AOC | ₹25.0 L | 1 | Accepted-AOC AOC TO BID RANK L1 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
21 Aug 2026, 6:50 pmClosed
ADMINSTRATOR
GRAM PANCHAYAT SAINSAR
Public Library Construction Work
2026_PRD_587990_1
E-TENDER 06/2026-27 GP SAINSAR
Open Tender
Civil Works
Percentage
GRAM PANCHAYAT SAINSAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
ADMINSTRATOR,MDRISL
₹50,000
Yes
18 Sept 2026
15 Aug 2026
22 Aug 2026
15 Aug 2026
21 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation excavation up to 1.5m,
ramming bottom, dressing sides, back
filling and disposal of surplus soil
with in a lead of 50m. | 46.66 | घ.मी. | 178.5 | ₹8,328.81 |
| 2 | Cement concrete in foundation and plinth
with stone ballast size 40mm including
curing and compaction etc in 1:4:8 mix | 7.78 | घ.मी. | 3,486 | ₹27,121.08 |
| 3 | Brick work in foundation and plinth using
bricks of class designation-75 in CM 1:6 | 49.45 | किलो | 4,675 | ₹2,31,178.75 |
| 4 | DPC with RCC 1:1.5:3 mix | 4.07 | थैला (50 Kg) | 5,541 | ₹22,551.87 |
| 5 | Brick work in super structure using bricks
of class designation-75 in CM 1:6 | 56.08 | थैला (50 Kg) | 4,923.6 | ₹2,76,115.49 |
| 6 | Reinforced cement concrete work including
curing compaction, finishing with
rendering in cement sand mortar 1:3 and
making good and joints excluding cost of
centering, shuttering and reinforcement in
1:1.5:3 (1cement: 1.5course sand: 3-graded
stone aggregate 20mm nominal size) | 27.49 | घ.मी. | 5,541 | ₹1,52,322.09 |
| 7 | Providing and fabricating reinforcement for
RCC work including straightening, cutting,
bending, placing in position and binding
(including cost of binding wire) in
foundation and super structure up to 4.5m
height above plinth level hot rolled
deformed (IS: 1139) cold twisted (IS: | 3,375 | घ.मी. | 97.94 | ₹3,30,547.5 |
| 8 | Centering and shuttering with plywood or
steel sheets including strutting, propping,
bracing both ways with wooden members
and removal of from work | 234.82 | घ.मी. | 319 | ₹74,907.58 |
| 9 | P & L CC on roof | 114.15 | घ.मी. | 845.3 | ₹96,491 |
| 10 | S & F Glaze tiles on roof | 114.15 | घ.मी. | 1,000 | ₹1,14,150 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.93 MB
bid6.pdf
Tender Documents • 13.91 MB
BOQ_1044231.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .