| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹5.2 L (5.03%)Rejected-AOC MANSA | PATIALA | PUNJAB | 140401 | ₹1.1 Cr+₹5.2 L (5.03%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.1 Cr+₹7.7 L (7.48%)Rejected-AOC NAMOL ROAD LONGOWAL SANGRUR | SANGRUR | PUNJAB | 148001 | ₹1.1 Cr+₹7.7 L (7.48%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.1 Cr+₹8.1 L (7.86%)Rejected-AOC | ₹1.1 Cr+₹8.1 L (7.86%) | L4 | Rejected-AOC L4 |
| 5 | L5₹1.1 Cr+₹10.8 L (10.4%)Rejected-AOC 47 C MODEL TOWN EXTENSION LUDHIANA PB | LUDHIANA | PUNJAB | 141001 | ₹1.1 Cr+₹10.8 L (10.4%) | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
25 Jan 2021, 12:00 pmClosed
Executive Engineer
Executive Engineer Patiala Drainage Division Patiala
CHANNELIZATION OF NALLAH PATIALA PERIPHERIAL DRAIN FROM RD 450 to RD 800 MTR D S DHOBI GHAT
2021_WR_58619_1
25/SPL
Open Tender
Civil Works - Others
Item Rate
180 days
Patiala Drainage Division Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹2.4 L
Yes
18 Feb 2021
5 Jan 2021
25 Jan 2021
5 Jan 2021
25 Jan 2021
5 Jan 2021
Amount
CLEARNACE OF SLUSH FROM THE BED OF DRAIN BY MECHANICALLY
CARRIAGE OF SLUSH FROM THE SITE OF WORK TO DUMP SITE WITH AN AVG. LEAD 3.60 KM
Excavation inculuding handling of materials with in 15 mtrs inclusive of cost of explosives and dressing compressed air and T&P jumper work
PROVIDING AND LAYING PCC M-10 (1:3:6) NOMINAL MIX IN FOUNDATION WITH CRUSHED STONE AGGREGATE 40MM NOMINAL SIZE MECHIANCALLY MIX AND PLACED IN FOUNDATION I/C SUPPLY AND CARRIAGE OF MATERIAL FROM APPROVED QUARRY COMPLETE AS PER DRAWING AND TECHNICAL SPECIFICATION.
PUTTING 1:3 (CEMENT : WATER) CEMENT SLURRY WITH CEMENT @ 2.25KG PER SQM ON PREPARED BED AND SIDE SLOPES BEFORE LAYING CONCRETE ON BED AND SIDE SLOPES
PROVIDING AND LAYING PCC M-15 (1:2:4) NOMINAL MIX IN FOUNDATION WITH CRUSHED STONE AGGREGATE 40MM NOMINAL SIZE MECHIANCALLY MIX AND PLACED IN FOUNDATION I/C SUPPLY AND CARRIAGE OF MATERIAL FROM APPROVED QUARRY COMPLETE AS PER DRAWING AND TECHNICAL SPECIFICATION
LAYING FIRST CLASS BRICK MASONRY IN 1:3 C.S.M. IN FOUNDATION UPTO PLINTH INCLUDING S/O , C/O MATERIAL COMPLETE IN ALL RESPECT
PROVIDING AND LAYING 3” DIA WEEP HOLE COMPLETE IN ALL RESPECT
PROVIDING AND FILLING TIBBA SAND BACK SIDE WALL WITH HYDRALIC JCB AND HYDRALUIC TRACTOR TROLLEY I/C CUTTING AND LOADING IN TROLLEY AND TRANSPORTING TO THE SITE OF WORK WITH AN AVG. LEAD UPTO 26 KM.
PROVIDING AND LAYING 12.5 MM THICK CEMENT PLASTER 1:3 IN INCLUDING S/O C/O MATERIAL COMPLETE IN ALL RESPECT.
PROVIDING RUNNING AND MAINTENANCE OF PUMPING SET 8 H.P./ GENERATOR SET FOR DEWATERING ARRANGEMENTS COMPLETE IN ALL RESPECT
PROVIDING AND LAYING CEMENT CONCRETE RCC GRADE M-25 INCLUDING SUPPLY AND CARRIAGE OF MATERIAL FROM APPROVED QUARRY AS PER DRAWING AND TECHNICAL SPECIFICATION
STEEL REINFORCEMENT GRADE FE 500 (IS 1786 :2008) I/C BENDING AND BINDING S/O, C/O LOADING AND UNLOADING OF STEEL COMPLETE IN ALL RESPECT AS PER PWD SPECIFICATION
CENTERING AND SHUTTERING FOR SLAB CULVERTS FOR VENT HEIGHT UP TO 3.00 MTR
COMPACTION OF EARTH WORK IN 20 CM LAYER , DRESSING , WATERING, ROLLING OF EARTH COMPLETE IN ALL RESPECT
STRUCTURAL STEEL WORKS IN ANGLES , TEES AND FLAT RIVETED OR WELDED INCLUDING CUUTING AND FIXING ALL GUSSET PLATE , BOLTS , NUTS , RIVETS , WELDING ROD ETC. WITH HOISTING AND ERECTION IN POISTION COMPLETE AS PER DRAWING
RUGS/FOOT STEPS UNDER MANHOLE COVER
Extra Allowance for providing templates in curved portion
PROVIDING AND LOWERING IN TRENCHES TO CORRECT GRDIENT ALIGNMENT JOINTING WITH TYTON RUBBER JOINT AND CUTTING OF REINFORCED CEMENT CONCRETE SPIGOT AND SOCKETED PIPES AND SPECIAL RUBBER RING ISI MARKED AS PER IS CODE 458-2003 INTO TRENCHES FOR ALL DEPTH AND LAYING OUT THE SAME TO THE CORRECT ALIGNMENT GRADIENT LEVEL ETC CUTING OF CONCERETE BEDS AND JOINT AND HOLES SUPPORTING THE PIPES AND SPECIAL IN CORRECT POSTION IN A SUITABLE RIGID MANNER WHILE THE SAME ARE BEING JOINTED AND UNTIL THE SURROUNDING BENCHING HAUNCHES AND NEVLOPS ARE COMPLETED THE PIPES SHALL REST ON THE BED AT ALL JOINT THROUNG THEIR LENGTH AND FIXING OF RUBBER RING FACING TESTING THE PIPES FOR LEAKAGEAND ALL DEFECTS TO THE ENTTIRE SATISFACTIONS OF THE ENGINEER IN CHARGE ETC B) I/D RCC NP2 200MM INTERNAL DIA
EARTHWORK EXCAVATION IN ORDINARY SOIL, EXCLUSIVE OF COMPENSATION OF EARTH, EARTHWORK UNDRESSED WITH COMBINED LEAD UPTO 15 MTR INCLUDING BREAKING OF CLODS.
DISMANTLING OF EXISTING SLABS
BRIJ LAL GOVT CONTRACTOR
HARMANPAL SINGH
ONKAR SHARMA CONTRACTOR
MANMOHAN SINGH CONTRACTOR
M/S PUSHPINDER SINGH SIDHU CONTRACTOR
Ashmeet Singh Contractor
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .