| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 LAccepted-AOC | ₹22.2 L | L1 | Accepted-AOC Accept |
| 2 | L2₹18.5 LRejected-AOC | ₹18.5 L | L2 | Rejected-AOC Reject |
| 3 | L3₹23.2 LRejected-AOC | ₹23.2 L | L3 | Rejected-AOC Reject |
| 4 | L4₹23.5 LRejected-AOC | ₹23.5 L | L4 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | G R RAJASEKAR L2 | NARPAVI TRADERS L3 | PRABU ENGINEERING L4 | AHIRA DALMAIDA TERRIL DALMAIDA L1 |
|---|---|---|---|---|---|---|---|
| 1.00Name of Work:Construction of New Multi-Purpose Hall at Kayamozhi in Kayamozhi Pancahayt in Tiruchendur Union. | |||||||
| 2.00 | Earthwork excavation and depsoiting on banks with an initial lead and lift in Hard soil etc, complte as per SS20B for foundation. | 75.3 | Cum | 263 ₹19,803.9 | 247.87 ₹18,664.61 Lowest | 249.85 ₹18,813.71 | 249.27 ₹18,770.03 |
| 3.00 | Collection and supply of M.Sand and filling into the foundation and basement including cost and conveyance of sand and labour charges etc, complete | 7.15 | Cum | 1,915 ₹13,692.25 | 1,800.26 ₹12,871.86 Lowest | 1,900 ₹13,585 | 5,291.23 ₹37,832.29 |
| 4.00 | Cement Concrete 1:4:8 mix, using 40mm ISS, HBG metal including cost and conveyance of materals and labour charges for laying, compacting, curing etc, complete. | 12.88 | Cum | 5,599 ₹72,115.12 | 5,261.55 ₹67,768.76 | 5,415 ₹69,745.2 | 1,810.41 ₹23,318.08 Lowest |
| 5.00Supply and erection of centering for sides and soffits of concrete works inclduing cost and conveyance of materials and labour charges etc, complete. | |||||||
| 6.00 | Below Ground Level | 106.69 | Sqm | 500 ₹53,345 Lowest | 514.49 ₹54,890.94 | 520.12 ₹55,491.6 | 517.39 ₹55,200.34 |
| 7.00 | Above Ground Level | 200.79 | Sqm | 1,000 ₹2,00,790 Lowest | 1,028.97 ₹2,06,606.89 | 1,040.25 ₹2,08,871.8 | 1,034.77 ₹2,07,771.47 |
| 8.00 | Supply and fabrication of steel including cost and conveyance of steel and labour charges for cutting, bending and placing in position etc, complete | 5 | MT | 80,000 ₹4,00,000 | 86,394.51 ₹4,31,972.55 | 87,321.51 ₹4,36,607.55 | 8,692.49 ₹43,462.45 Lowest |
| 9.00 | RCC 1:1.5:3 mix, using 20mm ISS, HBG metal including cost and conveyance of material and labour charges for laying, compacting, curing etc, complete. | 41.57 | Cum | 9,000 ₹3,74,130 | 8,779.02 ₹3,64,943.86 Lowest | 9,025 ₹3,75,169.25 | 8,828.53 ₹3,67,001.99 |
| 10.00 | Brickwork in CM 1:5 mix, using country bricks including cost and conveyance of materials and labour charges etc, complete | 28.55 | cum | 6,407 ₹1,82,919.85 | 6,020.78 ₹1,71,893.27 | 5,985 ₹1,70,871.75 Lowest | 6,054.74 ₹1,72,862.83 |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
2 Mar 2026, 3:00 pmClosed
Block Developmenet officer (BP)
Block Developmenet officer (BP) Panchayat Union office, Tiruchendur
Construction of New Multi-Purpose Hall at Kayamozhi in Kayamozhi Pancahayt in Tiruchendur Union
2026_RDTN_664647_1
A2/0498/2026
Open Tender
Civil Works - Buildings
Item Rate
60 days
Tiruchendur Union
As Per Tender Schedule
4 documents required · 4 mandatory
₹0
₹25,000
Panchayat Union office, Tiruchendur
10 Jul 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work:Construction of New Multi-Purpose Hall at Kayamozhi in Kayamozhi Pancahayt in Tiruchendur Union. | - | - | - | - |
| 2 | Earthwork excavation and depsoiting on banks with an initial lead and lift in Hard soil etc, complte as per SS20B for foundation. | 75.3 | Cum | - | - |
| 3 | Collection and supply of M.Sand and filling into the foundation and basement including cost and conveyance of sand and labour charges etc, complete | 7.15 | Cum | - | - |
| 4 | Cement Concrete 1:4:8 mix, using 40mm ISS, HBG metal including cost and conveyance of materals and labour charges for laying, compacting, curing etc, complete. | 12.88 | Cum | - | - |
| 5 | Supply and erection of centering for sides and soffits of concrete works inclduing cost and conveyance of materials and labour charges etc, complete. | - | - | - | - |
| 6 | Below Ground Level | 106.69 | Sqm | - | - |
| 7 | Above Ground Level | 200.79 | Sqm | - | - |
| 8 | Supply and fabrication of steel including cost and conveyance of steel and labour charges for cutting, bending and placing in position etc, complete | 5 | MT | - | - |
| 9 | RCC 1:1.5:3 mix, using 20mm ISS, HBG metal including cost and conveyance of material and labour charges for laying, compacting, curing etc, complete. | 41.57 | Cum | - | - |
| 10 | Brickwork in CM 1:5 mix, using country bricks including cost and conveyance of materials and labour charges etc, complete | 28.55 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
TenderDocumentMultiConstructionofNewMultiPurposeHallatKayamozhi.pdf
Tender Documents • 0.86 MB
BOQ_798173.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].