Tender Value
₹8.4 Cr
EMD Value
₹16.7 L
Closing Date
10 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Unit Head RIICO Neermana
Office of The Unit Head RIICO Ltd Neemrana
as per BoQ
2026_RIICO_530380_1
30/2025-2026/2475/01-02/01
Open Tender
Civil Works
Percentage
425 days
Behror
as per TD
3 documents required · 3 mandatory
₹5,900
RIICO
₹16.7 L
Neemrana
20 Feb 2026
21 Jan 2026
11 Feb 2026
21 Jan 2026
10 Feb 2026
21 Jan 2026
28 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses & Granular Courses | 2,575.2 | cum | 100 | ₹2,57,520 |
| 2 | Compacting soil at optimum moisture content with power road roller including watering soil at O.M.C., charges of T & P, cost of water and finishing of formation to required camber and grade etc. complete in layers not exceeding 15 cm. compacted thickness, 95% proctor density. | 429.2 | P. Cum | 15.9 | ₹6,824.28 |
| 3 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For Grading-II Material | 858.4 | Cum | 859 | ₹7,37,365.6 |
| 4 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 429.2 | Cum. | 2,715 | ₹11,65,278 |
| 5 | Construction of un-reinforced , plain cement concrete pavement M-40 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602.2.2 , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using Fixed Form Paver and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). | 1,221 | P.Cum. | 6,300 | ₹76,92,300 |
| 6 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905., 300 mm dia | 180 | Rmt | 736 | ₹1,32,480 |
| 7 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 54 | Cum | 178 | ₹9,612 |
| 8 | Providing and Fixing of Dowel Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge. | 11,740.04 | P.Kg. | 77 | ₹9,03,983.08 |
| 9 | Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricks, Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 13.8 | Cum. | 4,263 | ₹58,829.4 |
| 10 | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete,Building Rubbish Stone metal (Grit and ballast etc.) For 5 Km. | 2,500 | Cum | 45.6 | ₹1,14,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
TD.pdf
Tender Documents • 0.72 MB
BOQ_945598.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .