Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹16.3 LAccepted-AOC | ₹16.3 L | L2 | Accepted-AOC Accepted |
| 2 | L1₹16.1 LRejected-Finance | ₹16.1 L | L1 | Rejected-Finance Low Price |
| 3 | L3₹16.7 LRejected-Finance | ₹16.7 L | L3 | Rejected-Finance High Price |
| Sl No | Description | Qty | Unit | MS SURIYA CONSTRUCTION L3 | MR.VIJAAY, CONTRACTOR L2 | A Kalimuthu L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 144.57 | Cum | 300 ₹43,371 | 263.78 ₹38,134.67 | 200 ₹28,914 |
| 2.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 31.19 | Cum | 6,000 ₹1.9 L | 5,516.01 ₹1.7 L | 5,000 ₹1.6 L |
| 3.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement including conveyance of all materials to site and proper centering etc complete. | 1 | Cum | - | - | 517 ₹517 |
| 4.00 | For Shuttering - Below Sill Level | 287.72 | Sqm | 600 ₹1.7 L | 547.5 ₹1.6 L | 517 ₹1.5 L |
| 5.00 | For Deck Slab Centering | 51.53 | Sqm | 1,100 ₹56,683 | 1,095 ₹56,425.35 | 1,035 ₹53,333.55 |
| 6.00 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 126.31 | Cum | 5,800 ₹7.3 L | 5,786.01 ₹7.3 L | 6,050 ₹7.6 L |
| 7.00 | Reinforced cement concrete 1:1.59:2.93 mix using 20mm-66% & 10mm-34% ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. | 24.48 | Cum | 8,800 ₹2.2 L | 8,735.52 ₹2.1 L | 8,050 ₹2.0 L |
| 8.00 | Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification. | 2.53 | Tonne | 91,900 ₹2.3 L | 91,858.5 ₹2.3 L | 91,000 ₹2.3 L |
| 9.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 4.16 | Cum | 6,900 ₹28,704 | 6,807.06 ₹28,317.37 | 5,000 ₹20,800 |
| 10.00 | Supply and filling with excavated earth including all cost and conveyance and all labour charges etc., complete. | 28.13 | Cum | 50 ₹1,406.50 | 45.85 ₹1,289.76 | 300 ₹8,439 |
Tender Value
Refer Docs
EMD Value
₹19,600
Closing Date
22 Jan 2026, 3:00 pmClosed
Block Development officer (B.Pt), Kalakad
Block Development office, North Salaipudur, Kalakad
Construction of Deck Slab Culvert 6.0m Span at Karumeniyaru near kalungadi burrial ground in Soorangudi Panchayat
2026_RDTN_640034_1
A2/4113/2025 Minds
Open Tender
Civil Works
Soorangudi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,600
3 Mar 2026
7 Jan 2026
22 Jan 2026
7 Jan 2026
22 Jan 2026
16 Jan 2026
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement including conveyance of all materials to site and proper centering etc complete.
For Shuttering - Below Sill Level
For Deck Slab Centering
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Reinforced cement concrete 1:1.59:2.93 mix using 20mm-66% & 10mm-34% ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Supply and filling with excavated earth including all cost and conveyance and all labour charges etc., complete.
Provision for bitumen Tar pad
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_766308.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_766308.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid