Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.8 LAccepted-Finance | ₹65.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹66.0 LRejected-Finance | ₹66.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹66.1 LRejected-Finance | ₹66.1 L | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
18 May 2026, 9:00 amClosed
SE RED MIRZAPUR
JHANVI HOTEL PUTLIGHAR MIRZAPUR
V.K. KONE KE GRAM KHARAUDHI KE TOLA BODAR ME BAIRIYA BABA MANDIR KE PASS SE SURENDRA NATH DUBEY JI KE GHAR TAK SAMPARK MARGES KA NIRMAN
2026_REDUP_1147116_1
27/SE RED/ 2026-27 DATE- 07.04.2026
Open Tender
Civil Works
90 days
KONE
AS PER NIT AND T2
2 documents required · 2 mandatory
₹3,376
₹1.3 L
3 Jul 2026
9 May 2026
18 May 2026
9 May 2026
18 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from Borrow pits with a lift upto 1.50m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Techinacal Specification Clause 301.5 | 1,759.01 | cum | 101.27 | ₹1,78,134.94 |
| 2 | Construction of granular sub-base by providing well graded Material, Spreeding in Uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 191.6 | cum | 2,353.53 | ₹4,50,936.35 |
| 3 | Providing and laying WBM grade with22.4-53 mm apporved quality SB in 7.50 cm thicknessconsolidating by road roller using stone dust/mooram for blinding materials/screening materialmacking medhi ,including roller including all materrial,labour,T&P | 173.25 | cum | 3,181.27 | ₹5,51,155.03 |
| 4 | Cement Concrete Pavement : Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepaired sub base with 43 grade cement or any other type as per clause 1501.2.2.M-30 grade coarse sand and fine aggregates confirming to IS:383 maximum size of coarse aggregate not exceding 25 mm mixed in a concrete mixer of not less than 0.2 cum. capacity and aproprete weigh batcher using approved mix design laid in a approved fixed site form work (steel chanel) laing and fixing of 125 micron thick polythene film wedges steel plates including levelling the form work as per drawing, spreading the concrete with sholves rackes, compacted using needle screed and plate vibrators and finished in continous operation including provision of conraction and expansion,construction joints, applying debonding strips, primer, sealent dowel bars, near approches to bridge / cukvert and construction joints admixtures as approved curing of concrete slab for 14 days. using curing compound ( where specified ) and water finishing to lines and grade as per drawing and technical specification clause 1501 | 346.5 | sqm | 6,987.25 | ₹24,21,082.13 |
| 5 | Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.0 with lead upto 1000 m as per Technical Specification Clause 303.1 | 330.6 | cum | 102.41 | ₹33,856.75 |
| 6 | Earthwork in excavation ordinary soil for structures as per drawing and techanical specification clause 305 including setting out, construction of shoring and bracing, removal of stumps and other deleterous material and disposal up to a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 397.94 | Cum | 381.52 | ₹1,51,822.07 |
| 7 | Filling in Foundation trenches as per drawing and technical specification Clause 305.3.9 | 44.55 | Cum | 1,887.84 | ₹84,103.27 |
| 8 | Plain Cement Concrete (PCC) M-10 (1:3:6 Nominal Mix) in open foundation complete as per drawing and techanical specification Clause 802 | 54.11 | Cum | 5,649.56 | ₹3,05,697.69 |
| 9 | Stone Masonary work in cement mortor ( 1:4 ) in foundation complete asper drawing and techanical specification clause 702,704,1202 and 1203 (2nd sort) | 235.38 | Cum | 5,872.33 | ₹13,82,229.04 |
| 10 | Stone Masonary work in cement mortor ( 1:5 ) in super structure complete asper drawing and techanical specification clause 702,704,1202 and 1203 (2nd sort) | 154.44 | Cum | 5,698.48 | ₹8,80,073.25 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.79 MB
BOQ_2145459.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid