Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 4A SANANDA APARTMENT 5 JATIA ROAD BALLY HOWRAH WEST BENGAL 711201 | HOWRAH | WEST BENGAL | 711201 | Admitted-Finance |
| 2 | Admitted-Finance PLOT A 150 A 151 INDCOIL TRANSFORMERS PVT LTD 23RD PU P ROAD OPPOSITE LODHA SUPREMUS WAGLE ESTATE THANE | Admitted-Finance |
| 3 | Rejected-Technical 62 F J N MUKHERJEE ROAD GHUSURI HOWRAH J N MUKHERJEE ROAD HOWRAH HOWRAH WEST BENGAL 711107 | HOWRAH | WEST BENGAL | 711107 | Rejected-Technical Techno commercially Not Acceptable |
| 4 | Rejected-Technical | Rejected-Technical Techno commercially Not Acceptable |
Tender Value
Refer Docs
Closing Date
7 Dec 2023, 3:00 pmClosed
Mr. SUSHANT DESHPANDE
thyssenkrupp Industrial Solutions India Pvt Ltd Vikhroli Mumbai India
SUPPLY OF DISTRIBUTION TRANSFORMER FOR MSB GDS AND PFCC UNIT FOR NREP
2023_NRL_774793_1
TK-1ZZZA-MP-RFQ-0104
Open Tender
Miscellaneous Goods
Supply
300 days
Numaligarh Refinery Limited Assam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
28 Feb 2024
6 Oct 2023
8 Dec 2023
6 Oct 2023
7 Dec 2023
24 Oct 2023
6 Oct 2023 - 20 Oct 2023
SUPPLY OF DISTRIBUTION TRANSFORMERS FOR MSB, GDS & PFCC UNIT FOR NREP PROJECT
Design, detail engineering, procurement, manufacturing, testing & inspection, factory acceptance testing (FAT), packing, forwarding, transportation, route survey (if required), site acceptance testing (SAT) and supply till site including Commissioning spares, Mandatory spares, Special Tools & Tackles, Consumables, 2 Year Operational Spares for DISTRIBUTION TRANSFORMERS FOR MSB UNIT including Online Condition monitoring system for each transformer with common data concentrator along with first fill of oil and 10% extra oil in non-returnable drums as mentioned in this specification to be installed at Numaligarh Refinery Limited(NRL), Assam as specified in Material Requisition. 2.0 MVA, 6.6/ 0.433 kV, ONAN, Dyn11, Z=7.5 % (No Negative Tol.), OCTC range ±5% in steps of 2.5% Tag No. for MSB UNIT - 1U64-SS14-TR-331A/B (2 Nos.) & 1U64-SS14-TR-332A/B (2 Nos.) &1U64-SS14-TR-333A/B (2 Nos.) & 1U64-SS14-TR-334A/B (2 Nos.)
Design, detail engineering, procurement, manufacturing, testing & inspection, factory acceptance testing (FAT), packing, forwarding, transportation, route survey (if required), site acceptance testing (SAT) and supply till site including Commissioning spares, Mandatory spares, Special Tools & Tackles, Consumables, 2 Year Operational Spares for DISTRIBUTION TRANSFORMERS FOR GDS & PFCC UNIT including Online Condition monitoring system for each transformer with common data concentrator along with first fill of oil and 10% extra oil in non-returnable drums as mentioned in this specification to be installed at Numaligarh Refinery Limited(NRL), Assam as specified in Material Requisition. 2.5 MVA, 6.6/0.433 kV, ONAN, Dyn11, Z=7.5% (No Negative Tol)., OCTC range ±5% in steps of 2.5% Tag No. for GDS & PFCC UNIT -1U64-SS15-TR-316A/B (2 Nos.), 1U64-SS15-TR-317A/B (2 Nos.), 1U64-SS15-TR-318A/B (2 Nos.), 1U64-SS15-TR-319A/B (2 Nos.), 1U64-SS15-TR-320A/B (2 Nos.), 1U64-SS15-TR-321A/B (2 Nos.)
Charges for Training for DISTRIBUTION TRANSFORMERS FOR MSB, GDS & PFCC UNIT as per MR
Perdiem Charges for Training at Site as mentioned in the MR (For Evaluation 03 Man-Days for MSB & 03 Man-days for GDS_PFCC will be considered)
Perdiem Charges for Training at OEM's Work as mentioned in the MR (For Evaluation 02 Man-Days for MSB & 02 Man-days for GDS_PFCC will be considered)
Charges for SITE Supervision of Erection / Installation and Testing for SUPPLY OF DISTRIBUTION TRANSFORMERS FOR MSB, GDS & PFCC UNIT FOR NREP PROJECT (For Evaluation 24 Man-Days for MSB & 36 Man-days for GDS_PFCC will be considered)
Per diem charges for upto 8 hours work on normal working days.
Overtime rate / hour beyond normal 8 hours work on normal working days.
Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site).
Description of Work / Item(s)
Amount
SUPPLY OF DISTRIBUTION TRANSFORMERS FOR MSB UNIT FOR NREP PROJECT Tag No. for MSB UNIT - 1U64-SS14-TR-331A/B (2 Nos.) & 1U64-SS14-TR-332A/B (2 Nos.) &1U64-SS14-TR-333A/B (2 Nos.) & 1U64-SS14-TR-334A/B (2 Nos.)
SUPPLY OF DISTRIBUTION TRANSFORMERS FOR GDS & PFCC UNIT FOR NREP PROJECT Tag No. for GDS & PFCC UNIT -1U64-SS15-TR-316A/B (2 Nos.), 1U64-SS15-TR-317A/B (2 Nos.), 1U64-SS15-TR-318A/B (2 Nos.), 1U64-SS15-TR-319A/B (2 Nos.), 1U64-SS15-TR-320A/B (2 Nos.), 1U64-SS15-TR-321A/B (2 Nos.)
Description of Work / Item(s)
Amount
SUPPLY OF DISTRIBUTION TRANSFORMERS FOR MSB UNIT FOR NREP PROJECT Tag No. for MSB UNIT - 1U64-SS14-TR-331A/B (2 Nos.) & 1U64-SS14-TR-332A/B (2 Nos.) &1U64-SS14-TR-333A/B (2 Nos.) & 1U64-SS14-TR-334A/B (2 Nos.)
SUPPLY OF DISTRIBUTION TRANSFORMERS FOR GDS & PFCC UNIT FOR NREP PROJECT Tag No. for GDS & PFCC UNIT -1U64-SS15-TR-316A/B (2 Nos.), 1U64-SS15-TR-317A/B (2 Nos.), 1U64-SS15-TR-318A/B (2 Nos.), 1U64-SS15-TR-319A/B (2 Nos.), 1U64-SS15-TR-320A/B (2 Nos.), 1U64-SS15-TR-321A/B (2 Nos.)
Description of Work / Item(s)
Amount
SUPPLY OF DISTRIBUTION TRANSFORMERS FOR MSB, GDS & PFCC UNIT FOR NREP PROJECT
Design, detail engineering, procurement, manufacturing, testing & inspection, factory acceptance testing (FAT), packing, forwarding, transportation, route survey (if required), site acceptance testing (SAT) and supply till site including Commissioning spares, Mandatory spares, Special Tools & Tackles, Consumables, 2 Year Operational Spares for DISTRIBUTION TRANSFORMERS FOR MSB UNIT including Online Condition monitoring system for each transformer with common data concentrator along with first fill of oil and 10% extra oil in non-returnable drums as mentioned in this specification to be installed at Numaligarh Refinery Limited(NRL), Assam as specified in Material Requisition. 2.0 MVA, 6.6/ 0.433 kV, ONAN, Dyn11, Z=7.5 % (No Negative Tol.), OCTC range ±5% in steps of 2.5% Tag No. for MSB UNIT - 1U64-SS14-TR-331A/B (2 Nos.) & 1U64-SS14-TR-332A/B (2 Nos.) &1U64-SS14-TR-333A/B (2 Nos.) & 1U64-SS14-TR-334A/B (2 Nos.)
Design, detail engineering, procurement, manufacturing, testing & inspection, factory acceptance testing (FAT), packing, forwarding, transportation, route survey (if required), site acceptance testing (SAT) and supply till site including Commissioning spares, Mandatory spares, Special Tools & Tackles, Consumables, 2 Year Operational Spares for DISTRIBUTION TRANSFORMERS FOR GDS & PFCC UNIT including Online Condition monitoring system for each transformer with common data concentrator along with first fill of oil and 10% extra oil in non-returnable drums as mentioned in this specification to be installed at Numaligarh Refinery Limited(NRL), Assam as specified in Material Requisition. 2.5 MVA, 6.6/0.433 kV, ONAN, Dyn11, Z=7.5% (No Negative Tol)., OCTC range ±5% in steps of 2.5% Tag No. for GDS & PFCC UNIT -1U64-SS15-TR-316A/B (2 Nos.), 1U64-SS15-TR-317A/B (2 Nos.), 1U64-SS15-TR-318A/B (2 Nos.), 1U64-SS15-TR-319A/B (2 Nos.), 1U64-SS15-TR-320A/B (2 Nos.), 1U64-SS15-TR-321A/B (2 Nos.)
Century Transformers Pvt. Ltd.
Century Transformers Pvt. Ltd.
Century Transformers Pvt. Ltd.
Century Transformers Pvt. Ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .