Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7,843.97Admitted-Finance | -44.00% | ₹7,843.97 | L1 | Admitted-Finance |
| 2 | L2₹9,246.07Admitted-Finance | -33.99% | ₹9,246.07 | L2 | Admitted-Finance |
| 3 | L3₹9,338.52Admitted-Finance | -33.33% | ₹9,338.52 | L3 | Admitted-Finance |
| 4 | L4₹9,804.96Admitted-Finance | -30.00% | ₹9,804.96 | L4 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
17 Apr 2026, 6:00 pmClosed
Executive Engineer
Er Tilak Raj Rajwal
Restoration of road under the jurisdiction of PMGSY Division Marwah on emergency basis i.e Motorable Path only by way of clearance of snow/slips etc. for the year 2026 27 likely to occur on Ikhala BLock Boundary Kishtwar to Lopara Road
2026_JKRRD_147250_3
EOINo02of2026-27 PMGSY MARWAH
Open Tender
CIVIL
1 days
Marwah
Restoration of road under the jurisdiction of PMGSY Division Marwah on emergency basis i.e Motorable Path only by way of clearance of snow/slips etc. for the year 2026 27 likely to occur on Ikhala BLock Boundary Kishtwar to Lopara Road
2 documents required · 2 mandatory
₹600
Executive Engineer
₹30,000
9 May 2026
11 Apr 2026
18 Apr 2026
11 Apr 2026
17 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Snow Clearance by Mechanical Means using Machines as specified or equivalent Snow Plough or equivalent. | - | cum | - | - |
| 2 | Galla Cutting in compressed snow including all carriages (1200mm deep and 4mtr wide) | - | cum | - | - |
| 3 | Clearing Snow ( with Frost) from Roads Snow Depth upto 150 mm | - | sqm | - | - |
| 4 | Polygonal/ Random Masonry/Rubble Masonry, uncoursed brought to course, laid dry, with Nallah stone in foundation and plinth including cost of through/ bond stones. | - | cum | - | - |
| 5 | Clearance of slips by mechanical means in ordinary soils disposal lead upto 50 m and lift upto 1.5 m. | - | cum | - | - |
| 6 | Clearance of slips by mechanical means in soils mixed with moorum Kankar/ shingle/boulders, disposal lead upto 50 m and lift upto 1.5 m. | - | cum | - | - |
| 7 | Clearance of slips by mechanical means in soils, mixed with Decomposed rocks: by blasting or ay other means. | - | cum | - | - |
| 8 | Clearance of slips by mechanical means in medium hard rocks; by blasting. | - | cum | - | - |
| 9 | Maintenance of road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per technical specification Clause 1906. | - | cum | - | - |
| 10 | Backfilling behind abutment, wing wall and return wall complete as per drawings &
technical specification Clause 1204.3.8 Granular material | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_229402.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid