| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.3 Cr+₹8.1 L (3.66%)Rejected-AOC 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | ₹2.3 Cr+₹8.1 L (3.66%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M THANGAVELU CONTRACTORS L1 | Krishna and Co L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Excavation in all Classes of Soil Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Dressing the Bed upto Sill Level. | 145.79 | Cum | 123 ₹17,932.17 Lowest | 140 ₹20,410.6 |
| 2.00 | Earthwork Excavation in all Classes of Soil Except Hard Rock Requiring Blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for Foundation (Open Foundation, Raft Foundation, Cutoff Wall, Rigid & Flexible Apron) Under Abutments, Returns & Piers Below Sill Level. | 604.31 | Cum | 450 ₹2,71,939.5 Lowest | 500 ₹3,02,155 |
| 3.00 | Vibrated Cement Concrete of Grade M15 using 40mm, 20mm & 10mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Foundation Concrete (Levelling course Below Footing, Below Raft Foundation, Below Retaining Wall). | 19.49 | Cum | 5,330 ₹1,03,881.7 Lowest | 5,650 ₹1,10,118.5 |
| 4.00 | Vibrated Plain Cement Concrete of Grade M 20 using 40mm,20mm & 10mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footing Under Abutments, Returns & Piers. | 426.07 | Cum | 6,470 ₹27,56,672.9 Lowest | 6,950 ₹29,61,186.5 |
| 5.00 | Vibrated Plain Cement Concrete of Grade M20 using 40mm, 20mm & 10mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Sub structure of Abutment, Pier & Wing Wall Above Sill Level. | 108.87 | Cum | 7,110 ₹7,74,065.7 Lowest | 7,250 ₹7,89,307.5 |
| 6.00 | Vibrated Reinforced Cement Concrete of Grade M30 using 20 & 12mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Dirtwall and Bedblock. | 8.53 | Cum | 11,540 ₹98,436.2 Lowest | 13,500 ₹1,15,155 |
| 7.00 | Providing and Fixing Seepage Pipes of 100mm dia PVC Pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm Dia Semi spherical backfill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the Backfill in Between Abutments and Returns. | 76 | Rm | 192 ₹14,592 Lowest | 200 ₹15,200 |
| 8.00 | Providing and Fixing Kraft Paper for full width of seating of deck slab and including cost and conveyance to work site Labour for fixing the same in correct position and all other incidental charges etc., complete. | 22.78 | Cum | 110 ₹2,505.8 Lowest | 120 ₹2,733.6 |
| 9.00 | Vibrated Reinforced Cement Concrete of Grade M30 using 20 & 12mm ISS size HBG Metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Deck Slab & Kerb. | 138.36 | Cum | 13,360 ₹18,48,489.6 Lowest | 14,250 ₹19,71,630 |
| 10.00 | Providing Filter Media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges "Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete. | 36.69 | Cum | 1,880 ₹68,977.2 Lowest | 1,950 ₹71,545.5 |
Tender Value
₹2.4 Cr
EMD Value
₹2.4 L
Closing Date
22 Aug 2025, 3:00 pmClosed
Project Director
DRDA, Ariyalur
Construction of Bridge across Murugankottai Odai Along Kumilankuzhi - Madhapuram Road at Eravangudi Panchayat in Package No.TN 30-03 in Jayankondam Block in Ariyalur District under State Special Assistance Phase -I for the year 2025-26
2025_RDTN_587249_1
DIPR/3980/Tender/2025, Dated.30.07.2025
Open Tender
Civil Works - Bridges
Works
365 days
DRDA
As per Tender Document
4 documents required · 4 mandatory
₹0
₹2.4 L
DRDA, Ariyalur
23 Oct 2025
1 Aug 2025
22 Aug 2025
1 Aug 2025
22 Aug 2025
1 Aug 2025
12 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .