Loading…
Loading…
Tender Value
₹2.1 L
EMD Value
₹2,076
Closing Date
27 Feb 2026, 3:00 pmClosed
Block Development Officer(VP), Sathankulam
Block Development Office, Sathankulam
Providing of New Sintex (5000 lit ) and Extension of Pipe Line at Mettukudirppu village in Kombankulam Panchayat(90m)
2026_RDTN_665452_1
B2/456/2025/SAT/KOMBAN10
Open Tender
Civil Works
Block Development Office, Sathankulam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,076
Yes
27 Feb 2026
24 Feb 2026
27 Feb 2026
24 Feb 2026
27 Feb 2026
24 Feb 2026
Providing borewell(150mm) Submersible 3HP pump and 2000 Ltr HDPE syntex tank at vettairajakulam village burial ground in Kombankulam panchayat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification .
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five sand) including curing neat finishing, etc., complete complying with standard specifiction.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Sides alround
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supply and Fixing of 5000 lit HDPE tank
Earth work excavation for Narrow trench in all soils such as red earth, hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete for pipe laying
Supply and delivery of 63mm PVC 4 ksc pipe including cost and conveyance of all labour charges etc complete
Lowering PVC rigid pipes and specials into trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling the excavated earth into the trench after laying pipe line including all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_799234.xls
BOQ • 0.31 MB
TechnicalBid10Mettu.pdf
Tender Documents • 0.68 MB
Download all tender documents and submit your bid