Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical AT BHUSLAD PO DEDGAON BLOCK BANGAMUNDA PS SINDHEKELA DIST BOLANGIR PIN 7670354 ODISHA | 7670354 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical AT BHUSLAD PO DEDGAON BLOCK BANGAMUNDA PS SINDHEKELA DIST BOLANGIR PIN 7670354 ODISHA | 7670354 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical AT JAMUNABAHAL PO DADPUR PS BHAWANIPATNA DIST KALAHANDI 766002 | KALAHANDI | ODISHA | 766002 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical AT BHUSLAD PO DEDGAON BLOCK BANGAMUNDA PS SINDHEKELA DIST BOLANGIR PIN 7670354 ODISHA | 7670354 | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
20 Aug 2026, 5:00 pmClosed
CHIEF CONSTRUCTION ENGINEER
RURAL WORKS CIRCLE , BHAWANIPATANA
Construction of Higher Secondary School at Dadhibamana High School Dadpur in the District of Kalahaandi for 2026-27 (Building)
2026_CERWI_138225_1
BPT/ONLINE/10/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
365 days
BHAWANIPATNA/KALAHANDI
2 documents required · 2 mandatory
₹10,000
₹1.2 L
Yes
21 Aug 2026
8 Aug 2026
21 Aug 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
8 Aug 2026 - 19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P,royalty etc. complete and as directed by the Engineer In Chief. | 494.95 | Cubic Meters | 282.89 | ₹1,40,016.41 |
| 2 | Filling in foundation & plinth with sand in 22.5cm(9") thick layers including watering and ramming with all cost conveyance royalty, taxes of the materials and labour with T&P required for the work etc. complete or as directed by the Engineer In Chief. | 224.49 | Cubic Meters | 844.2 | ₹1,89,514.46 |
| 3 | Plain Cement concrete (1:3:6) with 4cm size C.B, h.g metal of approved quality and from approved quary including hoisting, lowering, and laying in layers to 10cm (4") thick to required level, ramming, watering including all cost & conveyance of all materials and labour with T&P required for the work with all taxes and royalities complete in all respects and as directed by the Engineer In Chief. | 93.66 | Cubic Meters | 5,783.9 | ₹5,41,720.07 |
| 4 | Fly ash bricks masonary in cement mortar (1:6) after immersing bricks for six hours in water before use in super structure using clamp burnt bricks of size (25 x 12 x 8 cm) having a crushing strength of not less than 75 Kg/Cm2 including splays cutting circular moulding chmfering and corbelling watering and curing etc complete including cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect or as directed by the Engineer In Chief.
4.1 (A) Foundation | 27.89 | Cubic Meters | 5,743.3 | ₹1,60,180.64 |
| 4.02 | (B) Super Structure
4.3 A ) Ground Floor | 97.75 | Cubic Meters | 5,785.6 | ₹5,65,542.4 |
| 4.03 | B ) 1st Floor | 31.98 | Cubic Meters | 6,171.6 | ₹1,97,367.77 |
| 5 | Fly ash bricks masonary in cement mortar (1:4) after immersing bricks for six hours in water before use in super structure using Fly Ash bricks of size (23 x 11 x 8 cm) having a crushing strength of not less than 75 Kg/Cm2 including splays cutting circular moulding chmfering and corbelling watering and curing etc complete including cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect or as directed by the Engineer In Chief.
5.1 A ) Ground Floor | 3.61 | Cubic Meters | 5,813.3 | ₹20,986.01 |
| 6 | R.C.C. work of M-25 grade with 20mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying not exceeeding 15cm thick to the required level, ramming, watering and curing etc. including all cost of material, labour, with T&P and taxes of materials etc. required for work and as per direction of EIC.
6.1 (A) Columns and beams
6.2 (I) Foundation | 23.62 | Cubic Meters | 6,501.4 | ₹1,53,563.07 |
| 6.03 | (II) Above Foundation
6.4 A ) Ground Floor | 44.9 | Cubic Meters | 18,027.6 | ₹8,09,439.24 |
| 6.05 | B ) 1st Floor : | 5.91 | Cubic Meters | 23,908.4 | ₹1,41,298.64 |
stage.html
html • 0.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
Tendernotice_2.pdf
PDF • 1.64 MB
BOQ_605207.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .