Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | L1 | Accepted-AOC successful bidder | |
| 2 | L2₹3.5 L+₹31,436 (9.82%)Rejected-Finance PLOT NO 99 CIE PHASE 2 GANDHINAGAR BALANAGAR HYDERABAD TELANGANA 500037 | MEDCHAL MALKAJGIRI | TELANGANA | 500037 | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
Closing Date
9 Jan 2025, 6:00 pmClosed
Atul
JHABUA POWER LIMITED a JV of NTPC Post Attaria Tehsil Ghansore Dist Seoni Madhya Pradesh 480997
Supply of Coupling between Drive Turbine and Gear box of TDBFP.
2024_JPL_221378_1
JPL-CnM-LT-1100012360
Limited
Consumables- Raw materials
Supply
90 days
JHABUA POWER LIMITED a JV of NTPC Post Attaria Teh
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
21 May 2025
26 Dec 2024
11 Jan 2025
26 Dec 2024
9 Jan 2025
26 Dec 2024
26 Dec 2024 - 30 Dec 2024
Amount
FLEXIBLE COUPLING, 4GH-130-D Complete assembly of flexible shim pack,coupling (Dry Coupling) between Drive Turbine and Gear Box of TDBFP,Coupling Model: 4GH-130-D,Drawing No. 2-307-46-00019 Rev.01 ( All details are per technical data sheet)
Euroflex Transmissions(India)Pvt.Ltd (BID ID -802893)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .