| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC PEDONG KALIMPONG 734311 | KALIMPONG | WEST BENGAL | 734311 | ₹2.1 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹2.1 L+₹4,241.99 (2.02%)Rejected-AOC | ₹2.1 L+₹4,241.99 (2.02%) | L2 | Rejected-AOC Highest |
| 3 | L3₹2.2 L+₹5,291.99 (2.52%)Rejected-AOC | ₹2.2 L+₹5,291.99 (2.52%) | L3 | Rejected-AOC 2nd Lowest |
Tender Value
₹2.1 L
EMD Value
₹4,200
Closing Date
6 Mar 2026, 12:00 pmClosed
Executive Officer,Pedong Panchayat Samity
Pedong Bazar,PO PS-Pedong,Dist-Kalimpong
Construction of Children Park at Shawlay village within Kagay GP under Pedong Panchayat Samity
2026_GTA_1015591_10
10(10)/PDG/EO/15th CFC/25-26
Open Tender
CIVIL WORKS
Percentage
45 days
Kagay GP
Please refer Tender documents.
2 documents required · 2 mandatory
₹350
₹4,200
14 Sept 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface Dressing of the ground in any kind of soil including removing vegetation in equalities not exceeding 15cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 120 | M3 | 10 | ₹1,200 |
| 2 | Earthwork in excavation of foundation trenches or drains in all sorts of soils (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m as directed. The item includes necessary trimming the sides of trenches, ievelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1500mm. | 2.43 | M3 | 119.27 | ₹289.83 |
| 3 | Earthwork in filling in compound, tank, low land,ditchesetc.withgoodearth, in layersnot exceeding 150mm. Including breaking clod sand consolidating the same by ramming and dressing complete.
(a)With earth obtained by fresh excavation upto 1800 mm.depth(including the cost of excavation from land
arranged by the Deptt. within a lead of 100 m.) | 4.5 | M3 | 172.18 | ₹774.81 |
| 4 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. | 30 | m2 | 50 | ₹1,500 |
| 5 | Cost of stone boulder 150 mm size delivered ans stacked at site. | 3 | m3 | 1,526.4 | ₹4,579.2 |
| 6 | (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor.
(a) 1:3:6 proportion
(B) With N.B. Variety stone metal | 1.98 | m3 | 5,840.38 | ₹11,563.95 |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. | 0.12 | m3 | 7,325.17 | ₹879.02 |
| 8 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | 24 | m2 | 400.8 | ₹9,619.2 |
| 9 | Supplying and laying chequered tiles of any shade & of
approved quality with (1:1½:3) cement concrete laid in panels or patterns as directed in pavement, footpath etc. including necessary underlay 25mm thick [avg] cementmortar (1:3) complete in all respect with all labour and materials. [Using cement [email protected]/Sq.m at back side [email protected]/Sq.m for joint filling]
Red Variety
ii) 30 mm. thick | 24 | MT | 656.4 | ₹15,753.6 |
| 10 | Plaster to (wall floor ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and racking out joints including throating, nosing and drip course scaffolding /staging, where necessary (Ground floor). Excluding cost of chipping over concrete surface.
(ii) With 1:4 Cement Mortar
(a) 20 mm thick plaster | 36 | m3 | 236.4 | ₹8,510.4 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_2494992.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .